Notice ID: 03bf2a27a2454c738df4dc752386cb57Award NoticeAwarded
Y--SLOAN CANYON CONTACT STATION CONSTRUCTION & DELEGA
Awarded on August 29, 2024. Full description on SAM.gov.
Awarded tounder 140L0624C0018 (source: SAM.gov award notice)• $16.1M
Overview
- Posted
- August 29, 2024
- Notice type
- Award Notice
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of the Interior
Notice details
- Last updated
- Sep 9, 2025
- Award date
- Aug 29, 2024
- Award amount (SAM.gov award notice)
- $16.1M
Identifiers
- Solicitation number
- 140L0624R0026
- Notice ID
- 03bf2a27a2454c738df4dc752386cb57
- Award number (PIID)
- 140L0624C0018
Description
SLOAN CANYON CONTACT STATION CONSTRUCTION & DELEGATED DESIGN
Award Overview
Award Number
140L0624C0018
Award Amount (SAM.gov award notice)
$16.1M
Award Date
Aug 29, 2024
Awardee
Awardee UEI
YNNQLGD3ET25
Original Solicitation
Notice ID: 03bf2a27a2454c738df4dc752386cb57
Posted Date: Aug 29, 2024
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $28.3MSigned Nov 5, 2026
- $28.3MSigned Sep 24, 2026
- $28.3MSigned Sep 24, 2026
- $28.2MSigned Sep 15, 2026
- $28.1MSigned Jul 21, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
140L0624R0026- Market Research
- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Market ResearchJan 10, 2024
Y--SLOAN CANYON CONTACT STATION CONSTRUCTION & DELEGATED DESIGN
- Pre-SolicitationFeb 21, 2024
Y--SLOAN CANYON CONTACT STATION CONSTRUCTION & DELEGATED DESIGN
- 4×SolicitationMar 15, 2024
Y--SLOAN CANYON CONTACT STATION CONSTRUCTION & DELEGA
- AwardedCurrentAug 29, 2024
Y--SLOAN CANYON CONTACT STATION CONSTRUCTION & DELEGA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
PROJECT TITLE: ISRAEL CONSTRUCTION MATOCPROJECT LOCATION: ISRAELTHE UNITED STATES ARMY CORPS OF ENGINEERS (USACE) MIDDLE EAST DISTRICT HAS A REQUIREMENT FOR A SEVEN-YEAR DESIGN-BID-BUILD (DBB) CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) TO PROVIDE REPAIR, ALTERATION, AND CONSTRUCTION SERVICES IN ISRAEL, PRIMARILY FOR THE IMOD, BUT MAY BE USED FOR OTHER CUSTOMERS WITH REQUIREMENTS IN ISRAEL. THE REQUIREMENT INCLUDES, BUT IS NOT LIMITED TO, MAINTENANCE, REPAIRS, ALTERATION, CONSTRUCTION, DEMOLITION, EXCAVATION, SITE AND INFRASTRUCTURE IMPROVEMENTS (E.G. FENCING, UTILITIES, ROADS, PARKING, AND DRAINAGE), SYSTEM MAINTENANCE (E.G. HEAT VENTILATION AIR-CONDITIONING (HVAC)), AIRFIELD APRONS AND PAVEMENTS, ASBESTOS ABATEMENT, AND ANY SUPPORTING WORK NECESSARY TO CONSTRUCT COMPLETE AND USABLE FACILITIES TO SUPPORT THE FOREIGN MILITARY FINANCING (FMF) PROGRAMS.THIS MATOC WILL CONSIST OF A TWO-YEAR BASE PERIOD AND FIVE ONE-YEAR OPTION PERIODS. AMENDMENT 1 UPDATES ATTACHMENT C TO A THREE-PAGE FORM. | 66% | Awarded | Open |
ISRAEL CONSTRUCTION MATOC | 66% | Awarded | Open |
ISRAEL CONSTRUCTION MATOC | 66% | Awarded | Open |
PROJECT TITLE: ISRAEL CONSTRUCTION MATOCPROJECT LOCATION: ISRAELTHE UNITED STATES ARMY CORPS OF ENGINEERS (USACE) MIDDLE EAST DISTRICT HAS A REQUIREMENT FOR A SEVEN-YEAR DESIGN-BID-BUILD (DBB) CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) TO PROVIDE REPAIR, ALTERATION, AND CONSTRUCTION SERVICES IN ISRAEL, PRIMARILY FOR THE IMOD, BUT MAY BE USED FOR OTHER CUSTOMERS WITH REQUIREMENTS IN ISRAEL. THE REQUIREMENT INCLUDES, BUT IS NOT LIMITED TO, MAINTENANCE, REPAIRS, ALTERATION, CONSTRUCTION, DEMOLITION, EXCAVATION, SITE AND INFRASTRUCTURE IMPROVEMENTS (E.G. FENCING, UTILITIES, ROADS, PARKING, AND DRAINAGE), SYSTEM MAINTENANCE (E.G. HEAT VENTILATION AIR-CONDITIONING (HVAC)), AIRFIELD APRONS AND PAVEMENTS, ASBESTOS ABATEMENT, AND ANY SUPPORTING WORK NECESSARY TO CONSTRUCT COMPLETE AND USABLE FACILITIES TO SUPPORT THE FOREIGN MILITARY FINANCING (FMF) PROGRAMS.THIS MATOC WILL CONSIST OF A TWO-YEAR BASE PERIOD AND FIVE ONE-YEAR OPTION PERIODS. AMENDMENT 1 UPDATES ATTACHMENT C TO A THREE-PAGE FORM. | 66% | Awarded | Open |
This project will demolish the existing historical building and construct a new facility to meet the mission of Customs and Border Protection (CBP). The new port will adhere to the GSA Design Excellence and Operational Excellence 1 GSA PBS Office of Acquisition Management guidelines, the GSA PBS Core Building Standards, and the U.S. Department of Homeland Security (DHS) CBP Design Guide. The Contractor shall furnish all construction services, labor, equipment (except as otherwise provided), tools, materials, travel, supplies, management and supervision necessary to perform all work in accordance with the Statement of Work, and must plan, schedule, coordinate and assure effective performance of all services needed during the construction phases. All work performed and all materials provided under this contract shall comply with and/or shall be with knowledge and forethought of applicable federal, state and local building codes based on the requirements of the current edition of recognized and acceptable building standards, codes and regulations. The Contractor shall have full responsibility for all construction related to the project scope. | 65% | Pre-Solicitation | 12/24/2026 |