Notice ID: 183e6da7880346cabc3842cc913d45a7Award NoticeAwardedArchived
N--TURNPOINT LITEHOUSE FURNANCE REPLACEMENT
Awarded on September 8, 2026. Full description on SAM.gov.
Awarded tounder 140L4326P0124 (source: SAM.gov award notice)• $31.8K
Overview
- Posted
- September 8, 2026
- Notice type
- Award Notice
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of the InteriorBUREAU OF LAND MANAGEMENT
Notice details
- Office
- OREGON STATE OFFICE
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Sep 8, 2026
- Award amount (SAM.gov award notice)
- $31.8K
Identifiers
- Solicitation number
- 140L4326Q0079
- Notice ID
- 183e6da7880346cabc3842cc913d45a7
- Award number (PIID)
- 140L4326P0124
Description
TURNPOINT LITEHOUSE FURNANCE REPLACEMENT
Award Overview
Award Number
140L4326P0124
Award Amount (SAM.gov award notice)
$31.8K
Award Date
Sep 8, 2026
Awardee
Awardee UEI
CDNKKLM7BGQ8
Awardee CAGE Code
7BQ35
Awardee Address
4603 N 80TH AVE, Omaha, NE 68134, UNITED STATES
Original Solicitation
Notice ID: 183e6da7880346cabc3842cc913d45a7
Posted Date: Sep 8, 2026
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $35.0KSigned May 8, 2025
Contacts
Contracting Officer
Primary Contact
Documents
Select documents to download
Showing 7 of 7 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | BUREAU OF LAND MANAGEMENT | Sep 8, 2026 | 280.93 KB | |||
| Combined Synopsis/Solicitation | BUREAU OF LAND MANAGEMENT | Sep 8, 2026 | 3.56 MB | |||
| Combined Synopsis/Solicitation | BUREAU OF LAND MANAGEMENT | Sep 8, 2026 | 201.04 KB | |||
| Combined Synopsis/Solicitation | BUREAU OF LAND MANAGEMENT | Sep 8, 2026 | 110.1 KB | |||
| Combined Synopsis/Solicitation | BUREAU OF LAND MANAGEMENT | Sep 8, 2026 | 201.36 KB | |||
| Combined Synopsis/Solicitation | BUREAU OF LAND MANAGEMENT | Sep 8, 2026 | 319.72 KB | |||
| Combined Synopsis/Solicitation | BUREAU OF LAND MANAGEMENT | Sep 8, 2026 | 101.71 KB |
Lifecycle
- 3Version 3Award NoticeArchivedCurrent
N--TURNPOINT LITEHOUSE FURNANCE REPLACEMENT
Other notices for this solicitation
- Combined SynopsisRelated noticeJul 7, 2026
TURNPOINT LITEHOUSE FURNANCE REPLACEMENT
- Combined SynopsisRelated noticeJul 16, 2026
N--TURNPOINT LITEHOUSE FURNANCE REPLACEMENT
- Combined SynopsisRelated noticeJul 21, 2026
N--TURNPOINT LITEHOUSE FURNANCE REPLACEMENT
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 0003 to extend response due date for Solicitation W912C326QA014, HVAC Replacement, Fort Buchanan, Puerto Rico | 59% | Solicitation | 09/02/2026 |
Sources Sought Response date changed to 26 June 2026 at 10:00 A.M Atlantic Standard Time. | 59% | Market Research | 06/26/2026 |
See attached JOFOC | 59% | Sole Source / J&A | Open |
Questions and Answers 36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only. Burner 3 boiler/burner controls where applicable and local display. Does the government require active O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only? Oxygen analyzer must send signals/information to combustion controls to control trim. What is the material of construction for the stack? Is it single or double wall? Stack is double walled. Inside material is steel; outside material is galvanized steel. Stack is 36 D Selkirk Metalbestos Model P.S. Current operating pressure and temperature of the system for boiler #3? Design pressure is 200 psi. Typical operating pressure is 82 psi. Typical operating temperature is about 330 degrees Fahrenheit. What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)? 4-20 mA analog. Is the flow meter wired directly into an analog terminal block on the CB Hawk, or is it wired directly to the facility s Building Automation System (BMS)? Steam flow meter is wired into local CB Hawk analog terminal block. Please provide nameplates for the existing oxygen analyzer and steam flow meter. Oxygen analyzer nameplate: Steam flow meter nameplate: | 59% | Combined Synopsis | 10/26/2026 |
Watervliet Arsenal (WVA) Replacement of the 300 Line Chrome Piping. See attached Request for Quote (RFQ) for complete details. | 58% | Solicitation | 10/29/2026 |
Additional Details
Solicitation Number
140L4326Q0079
Archive Date
Sep 23, 2026
Office Address
PORTLAND, OR, 97204