GovChime
Notice ID: 183e6da7880346cabc3842cc913d45a7Award NoticeAwardedArchived

N--TURNPOINT LITEHOUSE FURNANCE REPLACEMENT

Awarded on September 8, 2026. Full description on SAM.gov.

Awarded tounder 140L4326P0124 (source: SAM.gov award notice)• $31.8K

Overview

Posted
September 8, 2026
Notice type
Award Notice
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of the InteriorBUREAU OF LAND MANAGEMENT

Notice details

Office
OREGON STATE OFFICE
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Sep 8, 2026
Award amount (SAM.gov award notice)
$31.8K

Identifiers

Solicitation number
140L4326Q0079
Notice ID
183e6da7880346cabc3842cc913d45a7
Award number (PIID)
140L4326P0124

Description

TURNPOINT LITEHOUSE FURNANCE REPLACEMENT

Full description on SAM.gov

Award Overview

Award Number

140L4326P0124

Award Amount (SAM.gov award notice)

$31.8K

Award Date

Sep 8, 2026

Awardee

Awardee UEI

CDNKKLM7BGQ8

Awardee CAGE Code

7BQ35

Awardee Address

4603 N 80TH AVE, Omaha, NE 68134, UNITED STATES

Original Solicitation

Notice ID: 183e6da7880346cabc3842cc913d45a7

Posted Date: Sep 8, 2026

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

1
  • 140G0325P0111
    XION CONSTRUCTION COMPANY L.L.C.
    Department of the InteriorNAICS 238220
    $35.0KSigned May 8, 2025

Contacts

Contracting Officer

Primary Contact

Documents

Select documents to download

Showing 7 of 7 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationBUREAU OF LAND MANAGEMENTSep 8, 2026280.93 KB
Combined Synopsis/SolicitationBUREAU OF LAND MANAGEMENTSep 8, 20263.56 MB
Combined Synopsis/SolicitationBUREAU OF LAND MANAGEMENTSep 8, 2026201.04 KB
Combined Synopsis/SolicitationBUREAU OF LAND MANAGEMENTSep 8, 2026110.1 KB
Combined Synopsis/SolicitationBUREAU OF LAND MANAGEMENTSep 8, 2026201.36 KB
Combined Synopsis/SolicitationBUREAU OF LAND MANAGEMENTSep 8, 2026319.72 KB
Combined Synopsis/SolicitationBUREAU OF LAND MANAGEMENTSep 8, 2026101.71 KB

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    N--TURNPOINT LITEHOUSE FURNANCE REPLACEMENT

    Notice 183e6da7880346cabc3842cc913d45a7 on SAM.gov

Other notices for this solicitation

  1. Combined SynopsisRelated noticeJul 7, 2026

    TURNPOINT LITEHOUSE FURNANCE REPLACEMENT

    Notice b13c664c7f0d45cb8a2ed5bdb7e027ee on SAM.gov

  2. Combined SynopsisRelated noticeJul 16, 2026

    N--TURNPOINT LITEHOUSE FURNANCE REPLACEMENT

    Notice 0de98e4be57a45e8b2d63eaa4f6fe6ce on SAM.gov

  3. Combined SynopsisRelated noticeJul 21, 2026

    N--TURNPOINT LITEHOUSE FURNANCE REPLACEMENT

    Notice 7a46f25d828040658992aecc0318b7cb on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 0003 to extend response due date for Solicitation W912C326QA014, HVAC Replacement, Fort Buchanan, Puerto Rico
59%
Solicitation09/02/2026
Sources Sought Response date changed to 26 June 2026 at 10:00 A.M Atlantic Standard Time.
59%
Market Research06/26/2026
59%
Sole Source / J&AOpen
Questions and Answers 36C24727Q0050 Boiler #3 Oxygen Analyzer and Steam Flow Meter RFI Responses Where should the output signals from the new steam flow meter and O2 analyzer terminate? For example, the existing building automation system (BAS), the existing Boiler 3 burner/boiler controls, or a local display only. Burner 3 boiler/burner controls where applicable and local display. Does the government require active O2 trim control to the burner fuel/air ratio, or monitoring and display of the O2 only? Oxygen analyzer must send signals/information to combustion controls to control trim. What is the material of construction for the stack? Is it single or double wall? Stack is double walled. Inside material is steel; outside material is galvanized steel. Stack is 36 D Selkirk Metalbestos Model P.S. Current operating pressure and temperature of the system for boiler #3? Design pressure is 200 psi. Typical operating pressure is 82 psi. Typical operating temperature is about 330 degrees Fahrenheit. What are the available outputs on the physical steam flow meter (e.g., 4-20 mA, Modbus RTU, BACnet MS/TP)? 4-20 mA analog. Is the flow meter wired directly into an analog terminal block on the CB Hawk, or is it wired directly to the facility s Building Automation System (BMS)? Steam flow meter is wired into local CB Hawk analog terminal block. Please provide nameplates for the existing oxygen analyzer and steam flow meter. Oxygen analyzer nameplate: Steam flow meter nameplate:
59%
Combined Synopsis10/26/2026
Watervliet Arsenal (WVA) Replacement of the 300 Line Chrome Piping. See attached Request for Quote (RFQ) for complete details.
58%
Solicitation10/29/2026

Additional Details

Solicitation Number

140L4326Q0079

Archive Date

Sep 23, 2026

Office Address

PORTLAND, OR, 97204