GovChime

Z--FLFO-REPLACE HORNBEK WILDLIFE LOOP BRIDG

Overview

Response deadline
12:00 AM UTC−05:00
Posted
August 6, 2018
Notice type
Presolicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of the InteriorNATIONAL PARK SERVICE

Notice details

Office
DSC CONTRACTING SERVICES DIVISION
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Sep 10, 2025

Identifiers

Solicitation number
140P1218Q0091
Notice ID
432ba47bcc1ad9118ce9ba76139cc586

Description

Description: The Work includes installation of a pedestrian bridge and foundations on the Hornbek Trail Loop. The bridge will have steel beams with wood deck and wood railing. Wood from the recently demolished bridge will be stored at the parking lot and requires disposal. Project Location: Hornbek Homestead located in Florissant Fossil Beds National Monument, on (Teller) County Road #1, approximately 1.5 miles south of Florissant Colorado. Hornbek Trail Loop Bridge is west of the homestead site approximately 1 / 4 mile and is accessed by foot trail. B. Work of this project may begin as approved by the Contracting Officer beginning any date on or after August 15, 2018. C. Definition of Contract Line Items: Contractor proposal shall list each line item. 1. Item No. 1 Disposal of Wood Bridge: Work includes loading and disposal of the demolished materials from the wood bridge that has been disassembled and stockpiled in the homestead parking lot. a. Measurement for payment will be on a lump sum basis as a single item of work. b. Payment will be made at the contract price per lump sum price. 2. Item No. 2 Bridge Construction: This item consists of work to construction cast in place concrete foundations, embedded accessories, bridge beams, wood railings, wood decking, applied wood protection, accessories, foundation stone veneer, compacted backfill, trail surfacing of granular fines and stone steps on the trail. a. Measurement for payment will be on a lump sum basis as a single item of work. b. Payment will be made at the contract price per lump sum price. 3. Item No. 3 Revegetation : This item consists of work to grade, rake and seed adjacent to the trail and disturbed areas using native grass seed. a. Measurement for payment will be on a lump sum basis as a single item of work. b. Payment will be made at the contract price per lump sum price. (10) Period of Performance: Estimated Period of performance is September 24, 2018 to November 30, 2018. (11) a. A description of the procedures to be used in awarding the contract: Request for Quotation b. The anticipated award date: September 20, 2018 (12) The Request for Quotation will be posted on www.fbo.gov and www.fedconnect.net Questions can be emailed to Shawna_Rogers-Bailey@nps.gov.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140P1218Q0091
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. Pre-SolicitationCurrentAug 6, 2018

    Z--FLFO-REPLACE HORNBEK WILDLIFE LOOP BRIDG

    Notice 432ba47bcc1ad9118ce9ba76139cc586 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

140P1218Q0091

Archive Date

Aug 21, 2018

Office Address

Denver, CO, 80225