Y--Rehabilitate the Polebridge Water System, Glacier
Archived on September 25, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM MDT
- Posted
- September 9, 2026
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of the InteriorNATIONAL PARK SERVICE
Notice details
- Office
- IMR NORTHERN ROCKIES(12200)
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 140P1426R0013
- Notice ID
- c794f0154df1494ba3cac0c9977ce8d5
Description
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (21)
- Download
Sol_140P1426R0013_Amd_0005.pdf
207 KBAdded in Solicitation version 10Posted - Download
Sol_140P1426R0013_Amd_0004.pdf
202 KBAdded in Solicitation version 8Posted - Download
Sol_140P1426R0013_Amd_0003.pdf
203 KBAdded in Solicitation version 7Posted - Download
Attachment_13_-_Amendment_0003_Programable_Logic_Controller_Operation_and_Programming_0003.docx
17 KBAdded in Solicitation version 7Posted - Download
Attachment_14_-_Amendment_0003_Revised_01_10_00_Summary_of_Work_0003.pdf
132 KBAdded in Solicitation version 7Posted - Download
Attachment_12_-_Amendment_0003_Q_As_0003.docx
24 KBAdded in Solicitation version 7Posted - Download
Sol_140P1426R0013_Amd_0002.pdf
202 KBAdded in Solicitation version 6Posted - Download
Sol_140P1426R0013_Amd_0001.pdf
202 KBAdded in Solicitation version 5Posted - Download
Attachment_10_-_Amendment_0001_0001.docx
22 KBAdded in Solicitation version 5Posted - Download
Attachment_11_-_Site_Visit_Participants_0001.pdf
41 KBAdded in Solicitation version 5Posted - Download
Sol_140P1426R0013.pdf
627 KBAdded in Solicitation version 4Posted - Download
Attachment_3_-_As-Built_Plans.pdf
18 MBAdded in Solicitation version 4Posted - Download
Attachment_1_-_Specifications.pdf
5.5 MBAdded in Solicitation version 4Posted - Download
Attachment_5_-__Land_Survey.pdf
8.4 MBAdded in Solicitation version 4Posted - Download
Attachment_6_-_Geotechnical_Report.pdf
2.0 MBAdded in Solicitation version 4Posted - Download
Attachment_9_-_Limitations_on_Subcontracting_Template.xlsx
157 KBAdded in Solicitation version 4Posted - Download
Attachment_7_-_DOL_Wage_Determination.pdf
65 KBAdded in Solicitation version 4Posted - Download
Attachment_8_-_Past_Performance_Questionnaire.docx
31 KBAdded in Solicitation version 4Posted - Download
Attachment_2_-_Civil_Plans.pdf
22 MBAdded in Solicitation version 4Posted - Download
Attachment_4_-_Site_Photos.pdf
19 MBAdded in Solicitation version 4Posted - Download
A14_P1426R0013_Market_Research_-_Source_Sought_1.docx
24 KBAdded in Sources Sought version 3Posted
Lifecycle
- 3Version 3Sources SoughtArchived
Y--Rehabilitate the Polebridge Water System, Glacier National Park
- 4Version 4SolicitationArchived
Type changed from Sources Sought to Solicitation
Rehabilitate the Polebridge Water System, Glacier
- 5Version 5SolicitationArchived
Y--Rehabilitate the Polebridge Water System, Glacier
- 6Version 6SolicitationArchived
Y--Rehabilitate the Polebridge Water System, Glacier
- 7Version 7SolicitationArchived
Y--Rehabilitate the Polebridge Water System, Glacier
- 8Version 8SolicitationArchived
Y--Rehabilitate the Polebridge Water System, Glacier
- 10Version 10SolicitationArchivedCurrent
Y--Rehabilitate the Polebridge Water System, Glacier
Other notices for this solicitation
- Pre-SolicitationRelated noticeMay 20, 2026
Y--Rehabilitate the Polebridge Water System, Glacier National Park
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 3. HAVO 326181 Rehabilitate Rainshed & Water Treatment System located at Hawaii Volcanoes National Park, Volcano, Hawaii | 87% | Solicitation | 11/20/2026 |
Town of Cairo Water System Improvements Town of Cairo, Cairo, West Virginia The U.S. Army Corps of Engineers, Pittsburgh District, is carrying out a project to upgrade the existing water distribution systems within the Town of Cairo, WV. The project site has been divided into three general areas including the Water Distribution System Improvements, Water Meter Setting Replacements, and Water Storage Tank Rehabilitation. The base contract work generally consists of the following: ? Water Distribution System Improvements o Work includes approximately 5,600 LF of 6-inch water line, approximately 450 LF of 4-inch water line, approximately 1,750 LF of 2-inch water line, approximately 22 gate valves, approximately 18 water line tie ins, approximately 11 fire hydrant installations, approximately 13 fire hydrant demolitions, and approximately 8,250 LF of road restoration in and out of DOH rights-of-way including HMA, gravel, and concrete. ? Water Meter Setting Replacements o Work includes approximately 6,800 LF of polyethylene service tubing varying in size from 3/4-inch to 2-inch, approximately 195-meter settings, approximately 188 existing customer reconnections, and remove and repair approximately 119 existing service saddles. ? Water Storage Tank Rehabilitation o Work includes draining the existing water storage tank, inspecting the existing water storage tank, removing dirt and debris from the existing water storage tank, repairing the existing water storage tank, disinfecting the existing water storage tank, and filling the existing water storage tank. ? Execute various measures to facilitate work including traffic control, erosion and sedimentation control, and others. The contractor will be required to furnish all materials proposed for installation, and will be responsible for properly disposing, or recycling, as appropriate, respective items removed. Removed items deemed for disposal or recycling are to be taken to commercially permitted facilities licensed to accept the same, as applicable. The contractor will be required to adhere to USACE Construction Quality Management concepts and procedures. The work shall be completed within 365 calendar days after written Notice to Proceed. Estimated Contract Magnitude: Between $1,000,000 and $5,000,000The acquisition will be procured as unrestricted, full and open competition. The resulting award will be for one (1) Firm-Fixed-Price (FFP) Contract. All responsible Bidders are encouraged to participate. The Invitation for Bid (IFB) will be issued on or about 17 July 2026, online through Procurement Integrated Enterprise Environment (PIEE) which posts the opportunity to SAM.gov; therefore, requests for hardcopies of the solicitation will not be honored. The North American Industrial Classification System (NAICS) Code for this acquisition is 237110 - Water and Sewer Line and Related Structures Construction. The Small Business Size Standard for this NAICS Code is $45,000,000.00.In order to submit a Bid on this project, your company must-1) Be registered in System for Award Management (SAM) and maintain an active registration status. 2) Be registered in the Procurement Integrated Enterprise Environment (PIEE) for the Solicitation Module with the PROPOSAL MANAGER Manger role. System for Award Management (SAM) Registration Registering in SAM.gov includes both entity validation and entity registration.To register in SAM:a. Navigate to SAM.govb. Select Sign-In (top right)c. Select Create an Account then Follow the Instructions. d. After Account is Set-up, Select Sign In.e. Under the Entity Management widget, Select -inchGet Started-inch button. f. Select Register Entity. As part of entity registration, a Unique Entity ID will be assigned.For Additional Information on SAMTo Register Your Entity (company), please visit https:/www.fsd.gov/gsafsd_sp?id=gsa_index . Here you will find the following, Get Started with Your Registration Check Registration Status ? ACTIVE, INACTIVE, PENDING Update Your Registration Become an Entity Administrator Validate Your Entity *Access User Guides *By selecting this option, you can obtain a Quick Start Guide for Contract Registrations.Also, here you will find in addition to the User Guides - FAQs, Videos, and Definitions.PLEASE NOTEIt is mandatory that all companies be registered in SAM in order to receive federal contracts.There is no charge to register or maintain your company (entity) registration.Login.gov manages usernames and passwords for SAM.gov. *Important* Registration InformationRegistration can take at least ten (10) business days to be active in SAM.gov.Registration must be in active status upon offer submission and remain active during award period.Registration must be renewed every 365 days to remain active.The Federal Service Desk (FSD) for SAM questions, may be contacted. Phone Number: 866-606-8220Hours of Operation: Monday-Friday 8 a.m. to 8 p.m. ETProcurement Integrated Enterprise Environment (PIEE) Solicitation Module RegistrationTo register for PIEE follow the below instructions. Register in PIEE:a. Navigate to https://piee.eb.mil/b. Select Register [top right]c. Select Vendord. Create a User ID and Password and follow the prompts [next]e. Create Security Questions [next]f. Complete your User Profile Information [next]g. Complete your Supervisor or Approving Official Information [next]h. Complete Rolesi. Step 1. Select SOL-Solicitationii. Step 2. Select Proposal Manageriii. Step 3. Click Add Rolesiv. Step 4. Fill in your Location Code (CAGE Code) [next]i. Provide a justification for your registration [next]j. Follow the remaining prompts to submit your registrationThe Procurement Integrated Enterprise Environment (PIEE) help desk may be reached by calling telephone number 866-618-5988 for assistance. | 77% | Pre-Solicitation | 07/17/2026 |
On October 21, 2026, amendment 0003 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 11/04/2026 to 11/17/2026. 2. Post RFI Q&A labeled "C04a RFI QA 1240LT26Q0109 102026." 3. Post revised SOW labeled "C04b New SOW 1240LT26Q0109 102026." 4. Post revised Specs labeled "C04c New Specs 1240LT26Q0109 102026." 5. Post measurement and payment supplement labeled "C04d Measurement PYMT Sup 1240LT26Q0109 102026." 6. Post measurement and payment specs labeled "C04e Measurement PYMT Spec 1240LT26Q0109 102026." 7. Post revised SOI labeled "C04f New SOI 1240LT26Q0109 102026." 8. Post options supplement labeled "C04g Options Supplement 1240LT26Q0109 102026." This amendment must be acknowledged and submitted with your quote. ********************************************************************************************************************************* On October 16, 2026, amendment 0002 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 10/27/2026 to 11/04/2026. 2. Post the site visit attendance sheet labeled "C05a Site Visit 1240LT26Q0109." This amendment must be acknowledged and submitted with your quote. ********************************************************************************************************************** On September 30, 2026, amendment 0001 to solicitation 1240LT26Q0109 - GAOA Flaming Gorge Water System Buckboard, Ashley National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the due date for quotes from 10/08/2026 to 10/27/2026.This amendment must be acknowledged and submitted with your quote. ************************************************************************************************************************* Buckboard Marina Water System Improvements | 77% | Combined Synopsis | 11/17/2026 |
EO 14398 - White Horse Hill National Game Preserve Water Main Extension | 70% | Solicitation | 12/03/2026 |
. EO 14398 - White Horse Hill National Game Preserve Water Main Extension This is a Synopsis/Pre-Solicitation notice. The final solicitation package will follow. This opportunity is only available to Small Businesses. The U.S. Fish & Wildlife Service Great American Outdoors Act (GAOA) Construction Team has a requirement for the following: Construction services are needed to install a new water main extension that will be connected to an existing water distribution system. The work will include pipe, water main connection, water meter and vault, air/vacuum release valves, gate valve and box, horizontal drilling, and underground utility crossing at the White Horse Hill National Game Preserve in St. Michael, ND in Benson County. This requirement is being procured in accordance with FAR Part 15, Contracting by Negotiation. This will be a Firm Fixed Priced Contract and Award will be based on Lowest Price Technically Acceptable. The complete Solicitation will be posted to https://sam.gov/ under Contract Opportunities on or about November 3, 2026. Interested contractors must be registered in SAM (System for Award Management, www.sam.gov) and complete Online Representations and Certifications. A pre-proposal site visit and instructions will also be announced with the solicitation. The NAICS code is 237110 – Water and Sewer Line and Related Structures Construction and the size standard is $45 million. The project magnitude is between $250,000 and $500,000. The work will commence within 10 days of Notice to Proceed and be completed by the agreed upon date at the time of award. Bonding Requirements: 20% Bid Bond, 100% Payment Bond, 100% Performance Bond Direct questions in writing via email ONLY to Samantha LaGue at Samantha_LaGue@ios.doi.gov | 70% | Pre-Solicitation | 12/03/2026 |
Additional Details
Solicitation Number
140P1426R0013
Archive Date
Sep 25, 2026
Office Address
Yellowstone National Park, WY, 82190