Notice ID: 769bea0bde904753928a0e7080e16dcaSolicitation
56--SUPPLY AND INSTALL SHINGLE ROOF AT THOMAS COLE NAT
Archived on September 10, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM UTC−05:00
- Posted
- August 20, 2021
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238160: Roofing Contractors
- Agency
- Department of the InteriorNATIONAL PARK SERVICE
Notice details
- Office
- WASHINGTON CONTRACTING OFFICE
- Last updated
- Sep 9, 2025
Identifiers
- Solicitation number
- 140P2121R0042
- Notice ID
- 769bea0bde904753928a0e7080e16dca
Description
SUPPLY AND INSTALL SHINGLE ROOF AT THOMAS COLE NATIONAL HISTORIC SITE
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
140P2121R0042- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJul 9, 2021
56--SUPPLY AND INSTALL SHINGLE ROOF AT THOMAS COLE NATIONAL HISTORIC SITE
- 2×SolicitationCurrentJul 26, 2021
56--SUPPLY AND INSTALL SHINGLE ROOF AT THOMAS COLE NAT
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The U.S. Army Corps of Engineers (USACE) - Tulsa District (SWT) is conducting market research for an anticipated Design-Build (D-B) contract for roofing replacement with all design and construction work being performed by the Contractor. The Contractor shall provide all investigation, verification of site conditions and dimensions, design, research, travel, plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management to complete all work required. See attached for details. | 61% | Market Research | 01/09/2026 |
The U.S. Army Corps of Engineers (USACE) - Tulsa District (SWT) is conducting market research for an anticipated Design-Build (D-B) contract for roofing replacement with all design and construction work being performed by the Contractor. The Contractor shall provide all investigation, verification of site conditions and dimensions, design, research, travel, plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management to complete all work required by the contract documents. See attachment for further details. | 57% | Market Research | 12/19/2025 |
LIRI EMERGENCY ROOF REPAIR Adding revised Statement of Work 08.03.26 | 47% | Combined Synopsis | 08/07/2026 |
ROOF REPAIR OR REPLACEMENT | 46% | Solicitation | 11/16/2026 |
NY MONTEZUMA NWR MAIN SHOP ROOF | 42% | Solicitation | 11/23/2026 |
Additional Details
Solicitation Number
140P2121R0042
Archive Date
Sep 10, 2021
Office Address
LAKEWOOD, CO, 80225