Notice ID: 199f6ce64922449db658ab211866acb3Award NoticeAwarded
Z--Rehab Fuel System at Mammoth Cave National Park
Awarded on April 19, 2022. Full description on SAM.gov.
Awarded tounder 140P5222P0031 (source: SAM.gov award notice)• $190.7K
Overview
- Posted
- April 19, 2022
- Notice type
- Award Notice
- NAICS
- 238290: Other Building Equipment Contractors
- Agency
- Department of the Interior
Notice details
- Place of performance
- P O Box 7 NPS Warehouse, 61 Maintenance Rd, Mammoth Cave, KY, 42259
- Last updated
- Dec 4, 2025
- Award date
- Apr 19, 2022
- Award amount (SAM.gov award notice)
- $190.7K
Identifiers
- Solicitation number
- 140P5222Q0034
- Notice ID
- 199f6ce64922449db658ab211866acb3
- Award number (PIID)
- 140P5222P0031
Description
G:EPACT, EPEAT, REHAB FUEL SYSTEM (Cyclic Replacement) LOCATION: Mammoth Cave National Park, 61 Maintenance Rd, Mammoth Cave KY 42259 CONTRACT TYPE: Firm fixed price construction PERIOD OF PERFORMANCE: 365 Days after Notice To Proceed PROJECT MAGNITUDE: This project entails upgrade the fueling station system. Work elements include, but not limited to: A. Removal and disposal of the existing fuel tanks: 1. Tank 1 2. Tank 2 B. Removal and disposal of the fuel dispensers, pumps, and piping: 1. E-10 2. Diesel 3. Gasoline 4. Propane C. Removal and disposal of the existing Fuel Island Terminal. D. Purchase and installation of a new 4,000-gallon fuel tank (divided into a 3,000 diesel and a 1,000-gallon gasoline compartments). E. Purchase and installation of a dual hose dispenser, pumps, piping, and wiring for gasoline and diesel fuels. F. Purchase and installation of a new propane dispenser, pumps, and wiring with hoses for fueling vehicles and equipment. G. Purchase and installation of a new Fuel Island Terminal. H. Installation and setup of a new fuel management system.
Award Overview
Award Number
140P5222P0031
Award Amount (SAM.gov award notice)
$190.7K
Award Date
Apr 19, 2022
Awardee
Awardee UEI
NL67JTPRBV36
Awardee CAGE Code
3NYD5
Original Solicitation
Notice ID: 199f6ce64922449db658ab211866acb3
Posted Date: Apr 19, 2022
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
140P5222Q0034- Solicitation
- Awarded
This opportunity has been awarded.
- 2×SolicitationMar 22, 2022
Z--Rehab Fuel System at Mammoth Cave National Park
- AwardedCurrentApr 19, 2022
Z--Rehab Fuel System at Mammoth Cave National Park
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 0002: Extend Bid due date to May 13,2026 2:00 PM CT. 1. Consider a quote for materials only. No. The Government will not consider a materials-only quote for this requirement. The solicitation is for a complete firm-fixed-price generator replacement, including all labor, materials, tools, equipment, supervision, removal of existing equipment, installation, electrical integration, commissioning, load testing, training, and closeout documentation. Offerors must submit a complete turnkey quote that satisfies the full Statement of Work. Materials-only pricing will not be considered responsive to the solicitation. All other terms and conditions of the solicitation and Statement of Work remain unchanged. 2. Please advise if replacing the roof structure and new generator exhaust shall be included in the SOW as an alternate. The existing generator roof/cover structure is not identified in the Statement of Work for replacement. The Government does not intend to add replacement of the roof/cover structure as an alternate at this time. The existing roof/cover structure is bolted to the supporting steel posts and can be temporarily unbolted and removed, if necessary, to allow removal of the existing generator and installation of the new generator. The contractor shall field-verify existing conditions and determine the means and methods necessary to perform the work. If the contractor determines that temporary removal of the existing roof/cover structure is necessary, the contractor shall include temporary removal and reinstallation of the existing roof/cover structure in its price. If temporarily removed, the existing roof/cover structure shall be protected from damage and reinstalled in its current configuration unless otherwise directed by written solicitation amendment. Replacement of the roof/cover structure is not included in the current scope. The new generator exhaust shall be provided and installed in accordance with the generator manufacturer¿s requirements, applicable codes, and the Statement of Work. The contractor may reuse existing exhaust routing/components only if compatible with the new generator, manufacturer requirements, and applicable code. Any required exhaust modifications necessary for a complete, operational, code-compliant installation shall be included in the contractor¿s price. 3. Is there a requirement to replace the wire from the building electrical panel to the transfer switch? Replacement of the existing wire from the building electrical panel to the transfer switch is not included in the Statement of Work. The existing underground/building feeder route is located within the historic site context and is not intended to be removed, replaced, or re-routed under this contract. The contractor shall not disturb historic ground or replace the existing building-to-transfer-switch wiring unless specifically directed by written solicitation amendment. The contractor remains responsible for making the required exterior equipment connections, terminations, grounding/bonding, and code-compliant installation of the new generator and automatic transfer switch using the existing service conditions provided. Any work shall be limited to the generator/ATS replacement scope identified in the Statement of Work. 4. Sherwin-Williams is asking what the exact color number is that the end-user is looking for, if they have a specific manufacturer's color in mind. The contractor should submit actual color samples or manufacturer color documentation for review before ordering. The color needs to be reviewed in context with the Melrose setting and existing site conditions before final approval. Of the colors listed, Bottle Green 6007, Moss Green 6005, and Pine Green 6028 appear to be the closest options for consideration. Emerald Green 6001 appears less appropriate based on the name and general color tone, but final determination should be based on actual samples. The Government is not identifying a specific manufacturer¿s color at this time. Final color approval should remain subject to COR review of submitted color samples/documentation prior to ordering. | - | Combined Synopsis | 05/13/2026 |
Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Revolutionary FAR Overhaul (RFO) (FAR) subpart 12.2, Solicitation, Evaluation, and Award as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2026-01 (eff. 03/13/2026) FAR Deviation JAN 2026 (eff. 01/22/2026) VAAR DEVIATION FEB 2026 (eff. 03/17/2026) VAAM Alert 26-02 (eff. 10/28/2025) Acquisition Policy Flash 26-26 eff. 03/17/2026) 4. This solicitation is for Roll Up Door Replacement and the solicitation number is 36C25627Q0092. This solicitation is a 100% SDVOSB set-aside, and the Government anticipates awarding a firm-fixed price contract from this solicitation. The associated North American Industrial Classification System (NAICS) code for this procurement is 238290, with a small business size standard of $22M. The FSC/PSC is N099 Installation Of Equipment- Misc. The Central Arkansas Veterans Healthcare System is seeking to purchase the service for isolation Valves installed for steam and condensate lines IAW with attached statement of work. All interested companies shall provide quotations for the following: Supplies/Services: See Section B.2, Cost/Price Schedule Place of Performance/Place of Delivery Address: Eugene J. Towbin Healthcare Center Central Arkansas Veterans Healthcare System 2200 Fort Roots Drive North Little Rock, AR 72114 Site visit is scheduled for November 06, 2026, time 10am . Location of site visit is stated in attached SOW. POC is Justin Harper, Justin.Harper2@va.gov All questions are due by November 10, 2026 3PM CST. All quoters shall submit the following: Quotes should be emailed to joseph.warren@va.gov and received no later than 3:00 PM CST, November 18, 2026. Email subject line shall include, RFQ 36C25627Q0092 Roll Up Door Replacement . Quotes shall be submitted IAW Provision 52.212-1 Instruction to Offerors. Point of Contact Joseph Warren Contracting Officer joseph.warren@va.gov | - | Combined Synopsis | 11/20/2026 |
This is a combined synopsis/solicitation for commercial services prepared in accordance with FAR Subpart 12.6. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. This solicitation is issued as a Request for Quote (RFQ). | - | Combined Synopsis | 11/06/2026 |
AMENDMENT 0003. Updated Statement of Work - correction of French Drain lineal feet. Page 6 STRI Replace Plumbing, Mold Remediation, HVAC Installation, and Crawlspace Encapsulation | - | Combined Synopsis | 05/29/2026 |
FY26 Replace Backflow Preventers at the Natchez National Historical Park Amendment 002: ****REVISED STATEMENT OF WORK **** 02.02.26 | - | Combined Synopsis | 02/05/2026 |
Additional Details
Solicitation Number
140P5222Q0034
Archive Date
May 4, 2022
Office Address
TUPELO, MS, 38804