GovChime
Notice ID: 09ee28f560fd4bfbbff5e15cf7607f3dSolicitationArchived

GUIS CYCLIC REPAIR VC EXHIBITS

Archived on September 17, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM CDT
Posted
August 5, 2025
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238390: Other Building Finishing Contractors
Agency
Department of the InteriorNATIONAL PARK SERVICE

Notice details

Office
SER WEST(52000)
Place of performance
DAVIS BAYOU VISITOR CENTER 3500 PARK ROAD, Ocean Springs, 39564
Last updated
Nov 9, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
140P5225Q0041
Notice ID
09ee28f560fd4bfbbff5e15cf7607f3d

Description

GUIS CYCLIC REPAIR VC EXHIBITS Gulf Islands National Seashore in Ocean Springs, MS Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform minor repair of exhibits, and fabricate/install 1 new exhibit panel.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (5)

  • Sol_140P5225Q0041.pdf

    1.8 MBAdded in Solicitation version 3Posted
    Download
  • SCOPE_OF_WORK_051325_Davis_Bayou_Exhibit_Project.pdf

    727 KBAdded in Solicitation version 3Posted
    Download
  • Attachment_4_WAGE_DETERMINATION_MS20250052_04112025.pdf

    32 KBAdded in Solicitation version 3Posted
    Download
  • Davis_Bayou_Exhibit_Project_Recommendations_photos_Attachment_B.pdf

    5.6 MBAdded in Solicitation version 3Posted
    Download
  • Atch_A_DWGS_-_Davis_Bayou_VC_Exhibits_Final_Design.pdf

    17 MBAdded in Solicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3SolicitationArchivedCurrent

    GUIS CYCLIC REPAIR VC EXHIBITS

    Notice 09ee28f560fd4bfbbff5e15cf7607f3d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 0001: SITE VISIT DATE changed to August 28th 2026 at 0900 CT. FY26 Cyclic Overlay of West Jackson Street Parking Lot on the Natchez Trace Parkway. The National Park Service, Contracting Operations East, hereby issues a combined synopsis/solicitation for the Natchez Trace Parkway. It is the intent of this service contract is to provide all material, labor, mobilization and supervision to pave, mill and overlay necessary to maintain a suitable pacing surface at the West Jackson Street Parking Area on the Natchez Trace Parkway. Please see the Statement of Work for more details. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The NAICS code for this acquisition is 238990. It is the contractor's responsibility to be familiar with applicable clauses and provisions. This acquisition shall result in award of a firm fixed price contract. **A highly suggested site visit is scheduled for August 28th, 2026 at 9:00 CT at West Jackson Street Parking lot, Tupelo MS. The selection will be made by evaluating proposals based on cost, technical approach, and relevant experience. Bidders must be able to provide a registered UEI# and references of applicable experience in order to receive the award. Bids must arrive by electronical to tclark@ios.doi.gov by the closing date noted in this solicitation. Brett Johnson, COR Civil Engineer Natchez Trace Parkway 662-891-7233 joshua_b_johnson@nps.gov Tara H Clark Contracting Specialist Contracting Operations (ConOps) East National Park Service, DOI 662-372-0363 Tclark@ios.doi.gov
-Combined Synopsis09/01/2026
LIRI EMERGENCY ROOF REPAIR Adding revised Statement of Work 08.03.26
-Combined Synopsis08/07/2026
AMENDMENT 0003. Updated Statement of Work - correction of French Drain lineal feet. Page 6 STRI Replace Plumbing, Mold Remediation, HVAC Installation, and Crawlspace Encapsulation
-Combined Synopsis05/29/2026
Amendment 0002: Extend Bid due date to May 13,2026 2:00 PM CT. 1. Consider a quote for materials only. No. The Government will not consider a materials-only quote for this requirement. The solicitation is for a complete firm-fixed-price generator replacement, including all labor, materials, tools, equipment, supervision, removal of existing equipment, installation, electrical integration, commissioning, load testing, training, and closeout documentation. Offerors must submit a complete turnkey quote that satisfies the full Statement of Work. Materials-only pricing will not be considered responsive to the solicitation. All other terms and conditions of the solicitation and Statement of Work remain unchanged. 2. Please advise if replacing the roof structure and new generator exhaust shall be included in the SOW as an alternate. The existing generator roof/cover structure is not identified in the Statement of Work for replacement. The Government does not intend to add replacement of the roof/cover structure as an alternate at this time. The existing roof/cover structure is bolted to the supporting steel posts and can be temporarily unbolted and removed, if necessary, to allow removal of the existing generator and installation of the new generator. The contractor shall field-verify existing conditions and determine the means and methods necessary to perform the work. If the contractor determines that temporary removal of the existing roof/cover structure is necessary, the contractor shall include temporary removal and reinstallation of the existing roof/cover structure in its price. If temporarily removed, the existing roof/cover structure shall be protected from damage and reinstalled in its current configuration unless otherwise directed by written solicitation amendment. Replacement of the roof/cover structure is not included in the current scope. The new generator exhaust shall be provided and installed in accordance with the generator manufacturer¿s requirements, applicable codes, and the Statement of Work. The contractor may reuse existing exhaust routing/components only if compatible with the new generator, manufacturer requirements, and applicable code. Any required exhaust modifications necessary for a complete, operational, code-compliant installation shall be included in the contractor¿s price. 3. Is there a requirement to replace the wire from the building electrical panel to the transfer switch? Replacement of the existing wire from the building electrical panel to the transfer switch is not included in the Statement of Work. The existing underground/building feeder route is located within the historic site context and is not intended to be removed, replaced, or re-routed under this contract. The contractor shall not disturb historic ground or replace the existing building-to-transfer-switch wiring unless specifically directed by written solicitation amendment. The contractor remains responsible for making the required exterior equipment connections, terminations, grounding/bonding, and code-compliant installation of the new generator and automatic transfer switch using the existing service conditions provided. Any work shall be limited to the generator/ATS replacement scope identified in the Statement of Work. 4. Sherwin-Williams is asking what the exact color number is that the end-user is looking for, if they have a specific manufacturer's color in mind. The contractor should submit actual color samples or manufacturer color documentation for review before ordering. The color needs to be reviewed in context with the Melrose setting and existing site conditions before final approval. Of the colors listed, Bottle Green 6007, Moss Green 6005, and Pine Green 6028 appear to be the closest options for consideration. Emerald Green 6001 appears less appropriate based on the name and general color tone, but final determination should be based on actual samples. The Government is not identifying a specific manufacturer¿s color at this time. Final color approval should remain subject to COR review of submitted color samples/documentation prior to ordering.
-Combined Synopsis05/13/2026
FY26 Replace Backflow Preventers at the Natchez National Historical Park Amendment 002: ****REVISED STATEMENT OF WORK **** 02.02.26
-Combined Synopsis02/05/2026

Additional Details

Solicitation Number

140P5225Q0041

Archive Date

Sep 17, 2025