GovChime
Notice ID: 3019a95d66f64418aec37edd01017395Combined Synopsis/SolicitationArchived

M--TRAIL BRIDGE BLACKLAND PRAIRIE

Archived on July 16, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM CDT
Posted
July 16, 2025
Notice type
Combined Synopsis/Solicitation
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of the InteriorNATIONAL PARK SERVICE

Notice details

Office
SER WEST(52000)
Last updated
Nov 10, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
140P5225R0018
Notice ID
3019a95d66f64418aec37edd01017395

Description

Amendment 0002: Amendment 0002 We had a few questions so we are sharing the answers below. All other terms, conditions, and times remain the same. BIDS ARE DUE JULY 17,2025 AT 2:00CT. One question, I noticed the highlighted area regarding delegated design on pdf page 2. Does this mean that minor design details can be delegated to the contractor? The delegated design would be for the pre-fabricated bridges. Those are the only elements that are not ¿designed¿ since they will be built by a manufacturer. Can the diaphragms be bolted instead of welded to the girders? Yes they can. Does the diaphragm connection bracket need to be on both sides of the diaphragm in addition to each end of the diaphragm? Yes Do the bearing plates need to be welded to the girders? Yes they do. Do the hardware, girders, bearing plates, diaphragms, nailer angle need to be coated in any way? It would be best if they were to minimize corrosion over time. They can be galvanization (zinc coated), epoxy coated, or powder coated Do we need to include the steel angle nailer bracket if so please provide the spacing? The nailers are spaced a maximum of 5¿ oc along the length of the bridge. They can be less than 5¿ to allow for them to be evenly spaced along the length. Would these minor design alterations fall within that delegated design? Or should we maintain no deviation from the design we have now? Typically, not. It would be best to maintain no deviation from the plans

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (6)

  • Sol_140P5225R0018_Amd_0002.pdf

    88 KBAdded in Combined Synopsis/Solicitation version 4Posted
    Download
  • Sol_140P5225R0018_Amd_0001.pdf

    83 KBAdded in Combined Synopsis/Solicitation version 2Posted
    Download
  • Sol_140P5225R0018.pdf

    124 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • A04_SOW_NATT_Bridge_Construction_Blackland_Prairie_Section_near_Milepost_261_1.pdf

    1.9 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • Solicitation_Clauses.pdf

    390 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • B03_Wages_Lee_County.pdf

    203 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    TRAIL BRIDGE BLACKLAND PRAIRIE

    Notice 7fcc7fe4f9e24c43a30661317cf90981 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    M--TRAIL BRIDGE BLACKLAND PRAIRIE

    Notice d4b016f52ce24fd387070d6bd22f003d on SAM.gov

  3. 4
    Version 4Combined Synopsis/SolicitationArchivedCurrent

    M--TRAIL BRIDGE BLACKLAND PRAIRIE

    Notice 3019a95d66f64418aec37edd01017395 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

140P5225R0018

Archive Date

Jul 16, 2026

Office Address

TUPELO, MS, 38804