Notice ID: 23e7ff25b95e489e92e7140c95e7c7b7Combined Synopsis/Solicitation
61--REPLACE MELROSE BACKUP GENERATOR
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM CDT
- Posted
- May 11, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238290: Other Building Equipment Contractors
- Agency
- Department of the InteriorNATIONAL PARK SERVICE
Notice details
- Office
- SER WEST(52000)
- PSC
- 6115: GENERATORS AND GENERATOR SETS, ELECTRICAL
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 140P5226R0006
- Notice ID
- 23e7ff25b95e489e92e7140c95e7c7b7
Description
Amendment 0002: Extend Bid due date to May 13,2026 2:00 PM CT.
1. Consider a quote for materials only.
No. The Government will not consider a materials-only quote for this requirement.
The solicitation is for a complete firm-fixed-price generator replacement, including all labor, materials, tools, equipment, supervision, removal of existing equipment, installation, electrical integration, commissioning, load testing, training, and closeout documentation.
Offerors must submit a complete turnkey quote that satisfies the full Statement of Work. Materials-only pricing will not be considered responsive to the solicitation.
All other terms and conditions of the solicitation and Statement of Work remain unchanged.
2. Please advise if replacing the roof structure and new generator exhaust shall be included in the SOW as an alternate.
The existing generator roof/cover structure is not identified in the Statement of Work for replacement. The Government does not intend to add replacement of the roof/cover structure as an alternate at this time.
The existing roof/cover structure is bolted to the supporting steel posts and can be temporarily unbolted and removed, if necessary, to allow removal of the existing generator and installation of the new generator. The contractor shall field-verify existing conditions and determine the means and methods necessary to perform the work. If the contractor determines that temporary removal of the existing roof/cover structure is necessary, the contractor shall include temporary removal and reinstallation of the existing roof/cover structure in its price. If temporarily removed, the existing roof/cover structure shall be protected from damage and reinstalled in its current configuration unless otherwise directed by written solicitation amendment.
Replacement of the roof/cover structure is not included in the current scope.
The new generator exhaust shall be provided and installed in accordance with the generator manufacturer¿s requirements, applicable codes, and the Statement of Work. The contractor may reuse existing exhaust routing/components only if compatible with the new generator, manufacturer requirements, and applicable code. Any required exhaust modifications necessary for a complete, operational, code-compliant installation shall be included in the contractor¿s price.
3. Is there a requirement to replace the wire from the building electrical panel to the transfer switch?
Replacement of the existing wire from the building electrical panel to the transfer switch is not included in the Statement of Work.
The existing underground/building feeder route is located within the historic site context and is not intended to be removed, replaced, or re-routed under this contract. The contractor shall not disturb historic ground or replace the existing building-to-transfer-switch wiring unless specifically directed by written solicitation amendment.
The contractor remains responsible for making the required exterior equipment connections, terminations, grounding/bonding, and code-compliant installation of the new generator and automatic transfer switch using the existing service conditions provided. Any work shall be limited to the generator/ATS replacement scope identified in the Statement of Work.
4. Sherwin-Williams is asking what the exact color number is that the end-user is looking for, if they have a specific manufacturer's color in mind.
The contractor should submit actual color samples or manufacturer color documentation for review before ordering. The color needs to be reviewed in context with the Melrose setting and existing site conditions before final approval.
Of the colors listed, Bottle Green 6007, Moss Green 6005, and Pine Green 6028 appear to be the closest options for consideration. Emerald Green 6001 appears less appropriate based on the name and general color tone, but final determination should be based on actual samples.
The Government is not identifying a specific manufacturer¿s color at this time. Final color approval should remain subject to COR review of submitted color samples/documentation prior to ordering.
1. Consider a quote for materials only.
No. The Government will not consider a materials-only quote for this requirement.
The solicitation is for a complete firm-fixed-price generator replacement, including all labor, materials, tools, equipment, supervision, removal of existing equipment, installation, electrical integration, commissioning, load testing, training, and closeout documentation.
Offerors must submit a complete turnkey quote that satisfies the full Statement of Work. Materials-only pricing will not be considered responsive to the solicitation.
All other terms and conditions of the solicitation and Statement of Work remain unchanged.
2. Please advise if replacing the roof structure and new generator exhaust shall be included in the SOW as an alternate.
The existing generator roof/cover structure is not identified in the Statement of Work for replacement. The Government does not intend to add replacement of the roof/cover structure as an alternate at this time.
The existing roof/cover structure is bolted to the supporting steel posts and can be temporarily unbolted and removed, if necessary, to allow removal of the existing generator and installation of the new generator. The contractor shall field-verify existing conditions and determine the means and methods necessary to perform the work. If the contractor determines that temporary removal of the existing roof/cover structure is necessary, the contractor shall include temporary removal and reinstallation of the existing roof/cover structure in its price. If temporarily removed, the existing roof/cover structure shall be protected from damage and reinstalled in its current configuration unless otherwise directed by written solicitation amendment.
Replacement of the roof/cover structure is not included in the current scope.
The new generator exhaust shall be provided and installed in accordance with the generator manufacturer¿s requirements, applicable codes, and the Statement of Work. The contractor may reuse existing exhaust routing/components only if compatible with the new generator, manufacturer requirements, and applicable code. Any required exhaust modifications necessary for a complete, operational, code-compliant installation shall be included in the contractor¿s price.
3. Is there a requirement to replace the wire from the building electrical panel to the transfer switch?
Replacement of the existing wire from the building electrical panel to the transfer switch is not included in the Statement of Work.
The existing underground/building feeder route is located within the historic site context and is not intended to be removed, replaced, or re-routed under this contract. The contractor shall not disturb historic ground or replace the existing building-to-transfer-switch wiring unless specifically directed by written solicitation amendment.
The contractor remains responsible for making the required exterior equipment connections, terminations, grounding/bonding, and code-compliant installation of the new generator and automatic transfer switch using the existing service conditions provided. Any work shall be limited to the generator/ATS replacement scope identified in the Statement of Work.
4. Sherwin-Williams is asking what the exact color number is that the end-user is looking for, if they have a specific manufacturer's color in mind.
The contractor should submit actual color samples or manufacturer color documentation for review before ordering. The color needs to be reviewed in context with the Melrose setting and existing site conditions before final approval.
Of the colors listed, Bottle Green 6007, Moss Green 6005, and Pine Green 6028 appear to be the closest options for consideration. Emerald Green 6001 appears less appropriate based on the name and general color tone, but final determination should be based on actual samples.
The Government is not identifying a specific manufacturer¿s color at this time. Final color approval should remain subject to COR review of submitted color samples/documentation prior to ordering.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (7)
- Download
Sol_140P5226R0006_Amd_0002.pdf
201 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Sol_140P5226R0006_Amd_0001.pdf
202 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Q_As_0001.docx
17 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Sol_140P5226R0006.pdf
302 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
A04_NATC_347974_Melrose_Generator_SOW_2_0.pdf
9.1 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
B03_Wages.pdf
337 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Solicitation_Clauses.pdf
345 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/Solicitation
REPLACE MELROSE BACKUP GENERATOR
- 2Version 2Combined Synopsis/Solicitation
61--REPLACE MELROSE BACKUP GENERATOR
- 3Version 3Combined Synopsis/SolicitationCurrent
61--REPLACE MELROSE BACKUP GENERATOR
Similar Opportunities
- Elevator Control System Modernization – FCC Yazoo City (Low II)
Department of Justice · Posted 10/20/2026
- R--STRI REPLACE PLUMBING AND MOLD REMEDIATI
Department of the Interior · Posted 05/26/2026
- J--REPLACE BACK FLOW PREVENTER NATC VC
Department of the Interior · Posted 02/02/2026
- Z--ID- KOOSKIA NFH-OVERHEAD DOOR REPLACE
Department of the Interior · Posted 10/27/2026
- Z--Repair Fire Suppression Deficiencies at Parkwide L
Department of the Interior · Posted 08/25/2026
Additional Details
Solicitation Number
140P5226R0006
Archive Date
May 11, 2027
Office Address
TUPELO, MS, 38804