Notice ID: 34562d30bcfd4f3a81150bb68249cd8aAward NoticeAwarded
H--INSPECT AND CLEAN EIGHT (8) POTABLE WATER TANKS
Awarded on August 21, 2024. Full description on SAM.gov.
Awarded tounder 140P6224P0050 (source: SAM.gov award notice)• $18.4K
Overview
- Posted
- August 21, 2024
- Notice type
- Award Notice
- NAICS
- 221310: Water Supply and Irrigation Systems
- Agency
- Department of the InteriorNATIONAL PARK SERVICE
Notice details
- Office
- MWR MISSOURI MABO(62000)
- Last updated
- Nov 29, 2025
- Award date
- Aug 21, 2024
- Award amount (SAM.gov award notice)
- $18.4K
Identifiers
- Solicitation number
- 140P6224Q0034
- Notice ID
- 34562d30bcfd4f3a81150bb68249cd8a
- Award number (PIID)
- 140P6224P0050
Description
INSPECT AND CLEAN EIGHT (8) POTABLE WATER TANKS
Award Overview
Award Number
140P6224P0050
Award Amount (SAM.gov award notice)
$18.4K
Award Date
Aug 21, 2024
Awardee
Awardee UEI
EK3ENGRWL829
Original Solicitation
Notice ID: 34562d30bcfd4f3a81150bb68249cd8a
Posted Date: Aug 21, 2024
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $30.0KSigned Aug 27, 2025
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
140P6224Q0034- Combined Synopsis
- Awarded
This opportunity has been awarded.
- 4×Combined SynopsisJul 15, 2024
H--INSPECT AND CLEAN EIGHT (8) POTABLE WATER TANKS
- AwardedCurrentAug 21, 2024
H--INSPECT AND CLEAN EIGHT (8) POTABLE WATER TANKS
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
MN-UPR MS RIV NATL WILDL-WELL REPAIRS | - | Awarded | Open |
GRCA 257282 - Replace Wastewater Plant at South Rim Village | - | Solicitation | 12/18/2026 |
| - | Sole Source / J&A | Open | |
The Federal Bureau of Prisons (FBOP) and the Federal Correctional Institution Oxford located at 350 Elk Avenue, Oxford, Wisconsin, intend to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to remove existing water softeners and install a new centralized water softener for the entire Institution. Awarded Contractor shall provide materials, labor, and equipment to remove existing water softeners, pipe through and install a new centralized water softener and all associated components. FCI Oxford currently has several commercial-grade water softeners which are failing to efficiently reduce water hardness and protect water systems, as well as connected equipment. The new centralized system should improve water quality, minimize calcium buildup, and extend the service life of plumbing infrastructure and appliances. The contractor would place a brine tank and softener to be installed at the water tower. Water would be treated right off the water main, therefore there would be no need for bagged salt to be brought in weekly. | - | Combined Synopsis | 12/04/2026 |
366 CONS is soliciting for quotes for one time services to re-activate the Snake River Water Pump used to feed water the Mountain Home Air Force Base. Site Visit Information: An optional site visit shall be offered to all interested parties on 20 November 2026 at 10 am MDT. If interested in attending please email the Contract Specialist and Contracting Officer to RSVP and receive additional information. Questions and Answers: All Questions will be due 23 November by 5 pm MDT. All questions must be emailed to both the Contract Specialist and Contracting Officer identified on this solicitation | - | Combined Synopsis | 11/30/2026 |
Additional Details
Solicitation Number
140P6224Q0034
Archive Date
Sep 5, 2024
Office Address
Omaha, NE, 68102