GovChime
Notice ID: c50a9fb3b7fc486a838eb96b5c01523eAward NoticeAwarded

56--RE-GRAVEL SAGE CREEK RIM RD/OLD NE FY21

Awarded on May 25, 2021. Full description on SAM.gov.

Awarded tounder 140P6321P0029 (source: SAM.gov award notice)• $504.8K

Overview

Posted
May 26, 2021
Notice type
Award Notice
NAICS
212321: Construction Sand and Gravel Mining
Agency
Department of the Interior

Notice details

Last updated
Sep 9, 2025
Award date
May 25, 2021
Award amount (SAM.gov award notice)
$504.8K

Identifiers

Solicitation number
140P6321Q0014
Notice ID
c50a9fb3b7fc486a838eb96b5c01523e
Award number (PIID)
140P6321P0029

Description

Gravel Sage Creek Rim Road for Badlands National Park

Full description on SAM.gov

Award Overview

Award Number

140P6321P0029

Award Amount (SAM.gov award notice)

$504.8K

Award Date

May 25, 2021

Awardee

Awardee UEI

J6HNXF2FYLM8

Original Solicitation

Notice ID: c50a9fb3b7fc486a838eb96b5c01523e

Posted Date: May 26, 2021

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140P6321Q0014
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation
  4. Awarded

This opportunity has been awarded.

  1. Market ResearchJan 13, 2021

    56--Gravel for Sage Creek Rim Road, Badlands National Park

    Notice 90b7c24087494cb3b54f9a0d8cb653bf on SAM.gov

  2. Pre-SolicitationMar 11, 2021

    56--Gravel for Sage Creek Rim Road, Badlands National Park

    Notice ac30ccc8d5b846c4a6f0865ef0b3f31d on SAM.gov

  3. 5×
    SolicitationMar 15, 2021

    56--Gravel for Sage Creek Rim Road, Badlands National

    Notice 97ba553c5da945c4a41d9e3c8b047efd on SAM.gov

  4. AwardedCurrentMay 26, 2021

    56--RE-GRAVEL SAGE CREEK RIM RD/OLD NE FY21

    Notice c50a9fb3b7fc486a838eb96b5c01523e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
BRIDGE MATERIAL for BIA, Chinle Agency, BOT
-AwardedOpen
AMENDMENT 0001: The quotation submission deadline is hereby extended to November 13, 2026 at 6:00 PM Central Time. Summary of Changes include the Q&A responses, SOW revisions, and Special Contract Requirements Updates. This requirement outlines the procurement, hauling, and delivery of various aggregate stone and sand materials to multiple Directorate of Public Works locations to maintain tactical trails, base road infrastructure, and erosion control measures essential for sustained mission readiness. All delivered aggregate and sand must strictly conform to specified gradation, moisture content, and purity standards, with required laboratory certification provided before initial delivery. The contractor is responsible for utilizing properly cleaned, tight-bed dump trucks or semi-trailers that prevent leakage, comply with all posted bridge and culvert weight limits, and operate safely across designated delivery routes. Deliveries must commence within five business days of order issuance, follow a twenty-four-hour advance coordination notice for site access during authorized hours, and include certified weight tickets for inspection and acceptance by the site manager. See the Statement of Work Attachment Questions are due no later than 7 calendar days prior to the solicitation deadline date. Any questions received after the deadline will not receive a response.
-Combined Synopsis11/13/2026
GAOA Gravel Delivery Bloomington Lake Caribou-Targhee National Forest
-AwardedOpen
Rev 1 See Attached A07_Revision 1_ChampionPitCrushing - 11/02/2026 Champion Creek Pit Rock Crushing Description: This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Choose an item. are being requested and a separate written solicitation will not be issued. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 212321 - Construction Sand and Gravel Mining. The small business standard is No more than 500 employees. This acquisition is Firm Fixed Price. All responsible sources may submit a quotation which will be considered by the agency. General Information: 1.0 Scope of Work This project will develop the Champion Creek Pit for crushed aggregate surfacing material for use on forest roads. This work includes all required clearing, grubbing, topsoil stripping, overburden removal, material processing/crushing, material stockpiling, and restoration activities when finished. The Champion Creek Pit is located on the Sawtooth National Recreation Area of the Sawtooth National Forest. Project Location: From the Sawtooth NRA Ranger Station, travel south along State Highway 75 for approximately 13.5 miles. Turn left on Forest Road 70458, veer left, and continue about IAW: Solicitation and all applicable specifications, attachments and any amendments to include but not limited to; A04_Section C Champion Pit Crushing A04a_Schedule Of Items Section Champion Pit Crushing A04b_FP14 Supplemental Specs Champion Pit Crushing A04c_Design Drawings Champion Pit Crushing A06_Fire Precautions Plan Award Schedule: Posting: 10/16/2026 Site Visit: 10/28/2026 @ 1300 MST Q&A Due Date: 10/30/2026 Quotes Due Date: 11/05/2026 Anticipated Award Date: 11/16/2026 POP: 05/03/2027 – 06/30/2027 = 58 days
-Combined Synopsis11/12/2026
Road Rock and Ditch Lining
-Combined Synopsis10/27/2026

Additional Details

Solicitation Number

140P6321Q0014

Archive Date

Jun 9, 2021

Office Address

Rapid City, SD, 57701