Z--PIPE - REHAB VISITOR CENTER RESTROOMS
Awarded on January 12, 2026. Full description on SAM.gov.
Overview
- Posted
- January 12, 2026
- Notice type
- Award Notice
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of the InteriorNATIONAL PARK SERVICE
Notice details
- Office
- MWR NEKOTA(63000)
- Place of performance
- Pipestone, Minnesota
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
- Award date
- Jan 12, 2026
- Award amount (SAM.gov award notice)
- $151.5K
Identifiers
- Solicitation number
- 140P6326Q0001
- Notice ID
- 1f38f4421c7b4029ad24ecdd542cc3e5
- Award number (PIID)
- 140P6326P0004
Description
Award Overview
Award Number
140P6326P0004
Award Amount (SAM.gov award notice)
$151.5K
Award Date
Jan 12, 2026
Awardee
Awardee UEI
WC2FYGT96W66
Awardee CAGE Code
9ZAG3
Awardee Address
7512 CARNIVAL PL NW, Bremerton, WA 98311, UNITED STATES
Original Solicitation
Notice ID: 1f38f4421c7b4029ad24ecdd542cc3e5
Posted Date: Jan 12, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Files (10)
- Download
Sol_140P6326Q0001_Amd_0002.pdf
84 KBAdded in Solicitation version 4Posted - Download
B09_Solicitation_Amendment_2_Attach_1_Q_and_A_0002.pdf
137 KBAdded in Solicitation version 4Posted - Download
B09_Solicitation_Amendment_2_Attach_2__Site_Visit_0002.pdf
3.0 MBAdded in Solicitation version 4Posted - Download
Sol_140P6326Q0001_Amd_0001.pdf
84 KBAdded in Solicitation version 2Posted - Download
B09_Solicitation_attach_1_Specifications_0001.pdf
2.4 MBAdded in Solicitation version 2Posted - Download
B09_Solicitation_attach_4_Specifications_SubmittalList_0001.xlsx
114 KBAdded in Solicitation version 2Posted - Download
B09_Solicitation_attach_5_Experience_Questionaire_0001.xls
38 KBAdded in Solicitation version 2Posted - Download
B09_Solicitatoin_attach_2_WD__0001.pdf
46 KBAdded in Solicitation version 2Posted - Download
B09_Solicitatoin_attach_3_Drawings__0001.pdf
4.6 MBAdded in Solicitation version 2Posted - Download
Sol_140P6326Q0001.pdf
502 KBAdded in Solicitation version 1Posted
Lifecycle
- 2Version 2SolicitationArchived
Z--PIPE - REHAB VISITOR CENTER RESTROOMS
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
Z--PIPE - REHAB VISITOR CENTER RESTROOMS
Other notices for this solicitation
- SolicitationRelated noticeNov 17, 2025
PIPE - REHAB VISITOR CENTER RESTROOMS
- SolicitationRelated noticeNov 18, 2025
Z--PIPE - REHAB VISITOR CENTER RESTROOMS
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
WV-CANAAN VLY NWR-VC ADA DOORS | - | Solicitation | 10/28/2026 |
438-21-403, Renovate First Floor Kitchen | - | Solicitation | 11/12/2026 |
***Amendment 0004 is issued to PHASE II SELECTED OFFERORS ONLY on 28 August 2026. The due date is extended to 4 September 2026 at 1:00 PM EDT***Amendment 0003 is issued to PHASE II SELECTED OFFERORS ONLY on 4 August 2026*** ***Amendment 0002 is issued to PHASE II SELECTED OFFERORS ONLY on 29 July 2026**** Request for Proposal (RFP), Solicitation No. W912QR26RA035 is issued for the Design-Build of the Maintenance Support Activity (AMSA) and Equipment Concentration Site (ECS) in Arden Hills, MN. All documents are available for download from the Procurement Integrated Enterprise Environment (PIEE) website. Go to the Attachments/Links section of the SAM notice and access the hyperlink titled PIEE Solicitation Module Link for W912QR26RA035. Once at the site, scroll down to the Attachments section of the PIEE Solicitation Module to locate the documents. | - | Solicitation | 09/04/2026 |
Amendment 0001 incorporates a copy of the ICRA, Site Visit attendance sheet, responses to the Site Visit questions and a revised DBA Wage Determination. This project includes all labor, management, and materials to replace the existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base in Building 1,on the 3rd and 2nd Floors. All measurements/dimensions existing blueprints are approximate. Contractor must verify all measurements/dimensions. The Contractor shall inspect the area under contract prior to commencing work and identify any pre-existing damage and provide an Existing Site Conditions report with related photos to the Contracting Officer for review and approval. The Contractor shall match existing conditions at each location. The contractor will be responsible for and shall repair any excessive damage caused by the removal/demolition of existing materials or the installation of new materials. | - | Solicitation | 09/02/2026 |
This is a Pre-Solicitation Notice regarding project: 438-21-403, Renovate First Floor Kitchen at the Sioux Falls VA Health Care System, Sioux Falls, South Dakota. The Department of Veterans Affairs, Network Contracting Office 23 (NCO 23), is preparing to issue a solicitation for a Firm-Fixed-Price contract for this project. Note: This is a Pre-Solicitation Notice only, the Solicitation will not be posted for at least 15 days from the date of this notice. This is NOT a request for proposal. Estimated SOLICITATION DATE: on or about 08/20/2026 Estimated AWARD DATE: 10/31/2026 SET-ASIDE: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) NAICS: 236220, Commercial and Institutional Building Construction $45.0 Million PROJECT MAGNITUDE: Between $10,000,000 and $20,000,000. THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE. In accordance with Public Law 109-461 and VAAR 819.7003 (b), bidders must be registered, certified, and listed in the SBA certification database at  https://veterans.certify.sba.gov/ as a SDVOSB/VOSB. Only bids from verified SDVOSB s at SBA certification database at the time of proposal submission shall be deemed responsive. All non-responsive bids shall be rejected and ineligible for award. SCOPE OF WORK 438-21-403, Renovate First Floor for New Kitchen Sioux Falls VA Healthcare System GENERAL INFORMATION Base Bid: The Contractor must provide all supervision, tools, labor, materials, equipment, services, and testing necessary to accomplish the Renovate First Floor for New Kitchen project per the construction drawings and specifications. The project must be accomplished by the contract drawings and specifications for the project 438-21-403. Follow OSHA and all VA regulations as outlined in specifications 01 00 00. This work includes but is limited to: Demolition as described on the design plans and specifications. The contractor is responsible for locating all the existing utilities within the project site before any excavation or site work begins. Contractor shall remove from the VA site and dispose of all equipment and materials not scheduled to be reused. Construction consists of, but is limited to: Site work includes fencing, excavation, grading, paving, and protection of existing utilities. Demolition of walls, floors, ceilings, equipment, heating/cooling ventilation, and electrical. Construction consists of architectural, structural, mechanical and electrical improvements. Installation of owner furnished equipment The existing kitchen is located on the 2nd floor of building 5. The project consists of renovating first floor of building 5. There are phases to ensure the kitchen and VA staff provide meals for the impatient staff during the construction. Phasing is required to keep the existing kitchen operational. Additional construction projects will be occurring at the same time and near the kitchen renovation space. Contractors are expected to coordinate with the other contractors to minimize the disruption to the hospital. Owner furnished equipment will be provided for contractor installation. Once the equipment is received the contractor must store the equipment on site in a humidity and temperature-controlled storage unit. Maintain 50% relative humidity and a temperature of 60 - 70 degrees Fahrenheit. VA will be badging all construction employees. Badging requires background checks and personal information on each contract employee that will be on site. Forms to be filled out by the contractors and submitted for the badging process. Submittal exchange shall be procured and managed by the contractor for all submittals; Phasing is required to ensure the hospital is functional throughout the request for information (RFI), architectural supplemental information (ASI), VA purchased contractor installed equipment, shop drawings, and other project tracking needs for the duration of the project. Specification section 11 40 00 and plan sheet FS101 and plan sheet FS103 include the owner furnished kitchen equipment for a line item to be included in submittal exchange for review and acceptance. Night and weekend work will be expected to keep the campus fully functional during the construction activities that cannot be accomplished during business hours. After-hours are typically 5:00pm and before 6:00am. A dedicated site superintendent managing the construction effort and a site safety health officer shall be present during all construction activities. A dedicated quality control manager for the quality of the construction effort must be provided by the contractor per specification 01 45 00. Other construction will be occurring during the project. Coordination with other contractors is expected to ensure no disruption to the hospital s daily functions. Accuracy of the Planned Information: Bidders are highly encouraged to conduct a thorough site visit to investigate all as-built conditions of the project area in this SOW. Discrepancies in Planning Information: The prime contractor must promptly report to the Contracting Officer in writing any discrepancies between plans and specifications and as-built conditions. The Prime Contractor shall make no adjustments to their work due to discrepancies prior to review by the Contracting Officer. Ownership of Drawings: All designs, drawings, specifications, notes, and other work developed in the performance of this contract shall be the sole property of the US Government. The Prime Contractor shall provide a list of all items specified for which no substitutions will be accepted. This list shall identify each item with the specification section in which the item is defined. Performance Period:  The contractor shall complete the work required under this SOW, Monday through Friday in 550 calendar days or less from Notice to Proceed, unless otherwise directed by the Contracting Officer (CO). Construction at the Government site shall not take place on Federal holidays or weekends unless approved by the project engineer. Tentative Schedule:  Contract Award A Pre-construction Conference A+7 Notice to Proceed D (A+12) Construction Start D+22 Construction Completion D+550 | - | Pre-Solicitation | 09/01/2026 |
Additional Details
Solicitation Number
140P6326Q0001
Archive Date
Jan 27, 2026
Office Address
Rapid City, SD, 57701