GovChime
Notice ID: 458c8fdd0ead47148033d7c8f496483aAward NoticeAwardedArchived

Z--Rehab Bear Valley School Foundation, NPS-PINN

Awarded on June 26, 2026. Full description on SAM.gov.

Awarded tounder 140P8426C0003 (source: SAM.gov award notice)• $419.4K

Overview

Posted
June 26, 2026
Notice type
Award Notice
NAICS
238110: Poured Concrete Foundation and Structure Contractors
Agency
Department of the InteriorNATIONAL PARK SERVICE

Notice details

Office
PWR PORE MABO (84000)
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov
Award date
Jun 26, 2026
Award amount (SAM.gov award notice)
$419.4K

Identifiers

Solicitation number
140P8426R0001
Notice ID
458c8fdd0ead47148033d7c8f496483a
Award number (PIID)
140P8426C0003

Description

Rehabilitate the Bear Valley School Foundation, Pinnacles National Park, San Benito County, California

Full description on SAM.gov

Award Overview

Award Number

140P8426C0003

Award Amount (SAM.gov award notice)

$419.4K

Award Date

Jun 26, 2026

Awardee

Awardee UEI

JSBKBH78G5E7

Awardee CAGE Code

4LHZ4

Original Solicitation

Notice ID: 458c8fdd0ead47148033d7c8f496483a

Posted Date: Jun 26, 2026

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

1
  • 140P8426C0003
    TREELINE CONSTRUCTION, INC.
    Department of the InteriorNAICS 238110
    $419.4KSigned Jun 26, 2026

Contacts

Contracting Officer

Primary Contact

Documents

Files (12)

  • Sol_140P8426R0001_Amd_0003.pdf

    203 KBAdded in Solicitation version 6Posted
    Download
  • B08_Attachment_6_PINN_331043_Site_Visit_Sign_In_Sheet_(Apr_23)_0003.pdf

    2.0 MBAdded in Solicitation version 6Posted
    Download
  • B08_Attachment_7_PINN_331043_Q-A_Amendment_3_Summary_0003.pdf

    227 KBAdded in Solicitation version 6Posted
    Download
  • B08_Attachment_8_PINN_331043_Spec_01_50_00_omitted_sections_0003.pdf

    217 KBAdded in Solicitation version 6Posted
    Download
  • Sol_140P8426R0001_Amd_0002.pdf

    204 KBAdded in Solicitation version 4Posted
    Download
  • Sol_140P8426R0001_Amd_0001.pdf

    203 KBAdded in Solicitation version 3Posted
    Download
  • B08_Attachment_5_PINN_331043_Site_Visit_Sign_In_Sheet_(Apr_13)_0001.pdf

    129 KBAdded in Solicitation version 3Posted
    Download
  • Sol_140P8426R0001.pdf

    648 KBAdded in Solicitation version 2Posted
    Download
  • B08_Attachment_2_PINN_331043_Drawings.pdf

    12 MBAdded in Solicitation version 2Posted
    Download
  • B08_Attachment_1_PINN_331043_Specifications.pdf

    15 MBAdded in Solicitation version 2Posted
    Download
  • B08_Attachment_3_PINN_331043_Wage_Rates.pdf

    3.3 MBAdded in Solicitation version 2Posted
    Download
  • B08_Attachment_4_Proposal_Submission_Package.pdf

    978 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 2
    Version 2SolicitationArchived

    Z--Rehab Bear Valley School Foundation, NPS-PINN

    Notice 78c2d93468f04fa5a2f795464cd24deb on SAM.gov

  2. 5
    Version 5Award NoticeArchivedCurrent

    Type changed from Solicitation to Award Notice

    Z--Rehab Bear Valley School Foundation, NPS-PINN

    Notice 458c8fdd0ead47148033d7c8f496483a on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeMar 2, 2026

    Z--Rehab Bear Valley School Foundation, NPS-PINN

    Notice c627835704e44584a6d39438fdd3776d on SAM.gov

  2. SolicitationRelated noticeMar 30, 2026

    Rehab Bear Valley School Foundation, NPS-PINN

    Notice 9e4f40b362ec48f4908c2d4eaf4e04ed on SAM.gov

  3. SolicitationRelated noticeApr 14, 2026

    Z--Rehab Bear Valley School Foundation, NPS-PINN

    Notice bbcae6109e514f7fb8b9b303a93f5b8c on SAM.gov

  4. SolicitationRelated noticeApr 29, 2026

    Z--Rehab Bear Valley School Foundation, NPS-PINN

    Notice f800c291eca242e687c3de6e538c6c36 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Irrigation Canal Lining Maintenance and Repair for Colorado River - Irrigation
49%
Combined Synopsis11/30/2026
Sources Sought: Irrigation Canal Lining Maintenance and Repair - Colorado River Indian Irrigation Project (CRIIP) THIS IS A SOURCES SOUGHT NOTICE ONLY. This notice is issued solely for market research and ISBEE (Indian Economic Enterprise) planning purposes. It does not constitute a solicitation, Request for Proposal (RFP), or a commitment by the Government to issue a solicitation or award a contract. The Government is not requesting quotes at this time, and no awards will be made because of this notice. The Bureau of Indian Affairs (BIA), Colorado River Agency is conducting market research to identify qualified ISBEE/IEE business concerns capable of providing maintenance and repair of the approximately 140 miles of existing canal lining; to repair or replace broken or missing segments of the concrete lining. The CRIIP diverts irrigation water year-round except for the dry-up periods. The Lateral 90 dry-up is one week in early December, the Main Canal dry-up is two weeks in mid-January, and Lateral 73 dry-up is one week in mid-February. The majority of lining repair work is done during the dry-up periods. This contract will be for a full year so that the vendor can respond to any unplanned lining repair emergency. The process for repairing existing lining includes the identification of the damaged concrete site, removal of the damaged concrete, preparation of the canal bank for the placement of the new Dry Processed Gunite Material (Gunite), and area clean-up. There may be as many as 30 locations per day. The CRIIP will purchase the Gunite and have it delivered to the vendor on the canal bank at each site. The vender will purchase the 4'X4" wire and have it available at the CRIP Poston Yard for the vendor to transport to the Gunite repair site. The contract will be in force for 12 months and requires the vendor to be on call to make any emergency repairs that may occur on the CRIIP. The vendor shall agree to move equipment and personnel to the CRIIP within 48 hours of notification by CRIIP of an emergency Repair. This Sources Sought seeks to identify whether two or more capable ISBEEs are available to support CRIIP with the maintenance and repair of the irrigation canal lining. Interested vendors (ISBEE, IEE) are invited to submit a capability statement addressing the following: 1. Company name, address, and point of contact information 2. CAGE code and UEI 3. Business size/status under NAICS 238110 (or recommended alternative) 4. Capabilities statement tailored to the scope of this requirement 5. Past performance for similar projects 6. Logistics capabilities including emergency processes 7. Ability to meet daily, weekly, and emergency requirements Submission Details: Responses are due: November 11, 2026 Submit via email to: Melanie.Schiaveto@bia.gov Subject Line: Sources Sought Response-Irrigation Canal Lining Maintenance and Repair Responses should not exceed 10 pages. - No pricing is required at this stage. Disclaimer: This Sources Sought is for planning purposes only and does not commit the Government to any contract or BPA. No reimbursement will be made for any costs associated with responding.
49%
Market Research11/11/2026
The purpose of this amendment 0003 is as follows: A) To extend due date for proposals from November 13, 2026, by 10 AM.MT to November 20, 2026 by 10 AM.MT. B) All other items and conditions remain the same. ------------------------------------------------------------------------- The purpose of this amendment 0002 is as follows: Post answers to RFI’s from Site Visit and add attachments related to answers from RFI’s : Attachment F-Self Compacting file.pdf Specifications 554-27-117 Conduct concrete and civil repairs v1.pdf Attachment H- 00CG352.pdf Attachment G-ACAD-DVAMC Off site irrigation plan.pdf Attachment J-Overall site vault plan.pdf Attachment B - Repair List 11226.xls Attachment B - Repair List 11226_01.xls All other items and conditions remain the same. A.1 List of Attachments See attached document: Concrete RFI's Responses. See attached document: Attachment B - Repair List 11226. See attached document: Attachment B - Repair List 11226_01. See attached document: Attachment G - ACAD-DVAMC Off Site Irrigation Plan. See attached document: Attachment H - 00CG352. See attached document: Attachment J - Overall site vault plan. See attached document: Specifications 554-27-117 Conduct Concrete and Civil Repairs v1. ----------------------------------------------------------------- The purpose of this amendment 0001 is as follows: A) Post site visit documentation. B) To extend due date for proposals from October 30, 2026, 10:00 AM. MT to November 13, 2026, 10 AM. MT. All offers please email them to Elia L Ruiz Manzo at Elia-Laritza.Ruiz-Manzo@va.gov. C) Answers to questions will be responded in a second amendment at later date before Solicitation closes . D) All other items and conditions remain the same. A.1 List of Attachments See attached document: S04 - Site Visit Meeting Doc. See attached document: 554-27-117 Concrete Repair Signing sheet. --------------------------------------------------------------------------------------------------------------------------------------------------------- This is a solicitation number 36C25926Q0826 for the Concrete and Civil Site Repair at the Rokcy Mountain VAMC: A site visit shall be held on October 6, 2026, at 10 AM MT, please meet at the front of the Patriot Brew Coffee Shop, entrance. All questions in relation to this solicitation should be submitted in writing before October 20, 2026, by 10 AM. MT via e-mail to: Elia-Laritza.Ruiz-Manzo@va.gov. All submitted proposals must be received in email by the closing date and time. This solicitation closes October 30, 2026, by 10 AM MT.
45%
Solicitation11/20/2026
45%
AwardedOpen
The Central Virginia VA Health Care System is requesting loading dock concrete repair at the Richmond VA Medical Center (VAMC). The loading dock treads and risers are damaged and is a safety concern. Period of Performance: project should take approximately 90 days to complete.
45%
Solicitation11/24/2026

Additional Details

Solicitation Number

140P8426R0001

Archive Date

Jul 11, 2026

Office Address

POINT REYES STATION, CA, 94956