GovChime
Notice ID: 88a1c52ce03c44bb9a0216214f677f22Award NoticeAwarded

Z--PR STINSON BEACH LIFEGUARD

Awarded on September 26, 2024. Full description on SAM.gov.

Awarded tounder 140P8624C0014 (source: SAM.gov award notice)• $266.0K

Overview

Posted
September 27, 2024
Notice type
Award Notice
NAICS
236210: Industrial Building Construction
Agency
Department of the Interior

Notice details

Last updated
Sep 9, 2025
Award date
Sep 26, 2024
Award amount (SAM.gov award notice)
$266.0K

Identifiers

Solicitation number
140p8624r0011
Notice ID
88a1c52ce03c44bb9a0216214f677f22
Award number (PIID)
140P8624C0014

Description

PR STINSON BEACH LIFEGUARD

Full description on SAM.gov

Award Overview

Award Number

140P8624C0014

Award Amount (SAM.gov award notice)

$266.0K

Award Date

Sep 26, 2024

Awardee

Awardee UEI

ENH2ALXFPGV5

Original Solicitation

Notice ID: 88a1c52ce03c44bb9a0216214f677f22

Posted Date: Sep 27, 2024

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140p8624r0011
  1. Awarded

This opportunity has been awarded.

  1. AwardedCurrentSep 27, 2024

    Z--PR STINSON BEACH LIFEGUARD

    Notice 88a1c52ce03c44bb9a0216214f677f22 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
To explore the possibility of a Multiple Award Construction Contract (MACC) at Travis Air Force Base, California the 60th Contracting Squadron is publishing this SOURCES SOUGHT NOTICE to gather relevant industry information. This Multiple Award Construction Contract (MACC) represents a significant opportunity for qualified construction firms. This Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract, awarded to multiple vendors, facilitates the procurement of a variety of construction projects. Task Orders, each up to $10,000,000, will be firm-fixed-price and awarded through a competitive process among the MACC holders. The contract has a total potential value of $100,000,000 over five or more years with a five year ordering period and potentially up to five 12-month option periods to be determined once the duration is final. Contractors under this contract will perform a wide variety of construction tasks, including: design-build projects; progress design build; renovation and upgrade projects; new construction requiring integration of multiple trades; and repair/replacement of infrastructure such as roadways, airfield taxiways, and runways. These tasks will span a broad range of trades, including carpentry, demolition, mechanical, electrical, plumbing, concrete masonry, welding, and paving. Design capabilities are essential, with contractors expected to provide full-project design services from concept or performance-based requirements. The anticipated North American Industrial Classification System (NAICS) code for this Request for Information (RFI) is 236220 (Commercial and Institutional Building Construction), with a size standard of $45 million. No solicitation is being issued at this time. This is not a Request for Proposal (RFP) and shall not be construed as a commitment by the government to issue a solicitation or ultimately award a contract. 60 CONS is seeking capabilities from businesses classified as Small, 8(a), Women Owned Small Business (WOSB), Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), or Historically Underutilized Business Zone (HUBZone) for the purposes of determining the appropriate level of competition for a Multiple Award Construction Contract (MACC). Depending upon the response to this notice and other market research, 60 CONS may limit the competition to a specific category of small business with the exclusion of all other potential business concerns. If adequate responses are not received from the previously mentioned concerns, the acquisition may be solicited on an unrestricted basis. Additionally, the Government may consider additional subsets of work for specific small business category set asides if the data provided indicates there would be enough competition for those specific set asides. Interested and qualified firms are invited to respond to this sources sought notice by submitting a capability statement. The capability statement should provide a clear and concise overview of your firm's qualifications and experience, similar in format and content to your standard marketing materials. Please note that oral communications will not be accepted. Your written response should include the following information: Company Information (e.g. name, business address, point of contact, telephone number, e-mail address). Also include UEI number or CAGE Code; Socio-economic Status (e.g., Small, 8(a), WOSB, VOSB, SDVOSB, HUBZone, and any associated documentation of such status, certification or approvals). Also include business size in relation to the NAICS code size standard assigned to this acquisition. Summarize how your company is capable and qualified to handle this type of work. Include ability to manage 2-4 concurrent construction projects of similar size and scope anticipated under this MACC. Include information such as finance capability. Summarize projects that show your capabilities and past performance. The list of relevant projects should include names of project team members and firm, customer or agency and their point of contact (Contracting Officer and Quality Assurance Evaluator/Inspector) with titles, email and phone numbers, project scope, project value and type of contract. Bonding: provide your bonding capacity per contract and aggregate. Please limit submission of your information capability statement and data to twelve (12) pages. The information capability statement and data noted above must be submitted in written format via e-mail to the following addresses: TSgt Stephen Platt email stephen.platt.2@us.af.mil. The information requested by this notice will be used within the DoD and SBA to facilitate decision making and will not be disclosed outside the agencies. Please note that this is a Sources Sought announcement intended solely for information gathering and acquisition planning. This notice does not obligate the government to issue a contract, nor does it guarantee reimbursement for any expenses incurred in preparing a response. No solicitation is currently available. Any future solicitation will be posted on the SAM website (https://sam.gov). It is the responsibility of interested parties to monitor SAM for solicitation updates and releases. To receive award from any resultant solicitation, should one be issued, the successful offeror must be registered in the System for Award Management (SAM). The SAM website is https://sam.gov. The successful offeror must also have active certifications within the SAM system.
-Market Research12/10/2026
The U.S. Army Corps of Engineers (USACE) issues this special notice to announce an upcoming competition for a design and construction solicitation for F35 Composite Repair and Training Facility / F35 Maintenance Facility issued under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release. The U.S. Army Corps of Engineers intends to conduct an Industry Day on 17 November 2026 at 1:00 PM Pacific Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the anticipated Progressive Design-Build (PDB) or Construction Manager at Risk (CMAR) approach under an Other Transaction (OT) framework. General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute commitment, authorization, or binding guidance related to the future Program Solicitation. Official Questions and Answers (Q&A) will be accepted and addressed following the release of the Program Solicitation. This Industry Day will be conducted virtually, please use the following link, https://forms.osi.apps.mil/Pages/ResponsePage.aspx?id=unZN_HzxUEy5p48xY9J1gi8JCtDtBtdNhw_4_id_LMZUMzVXWTFTU0tCRUwxVVAwVlhUWlJXNFpRUi4u, to sign up to attend this industry day by 12 November 2026 4:00PM Pacific Time. Virtual link will be provided two days prior to the Virtual event. Project Overview Project Title: F-35 Composite Repair and Training Facility / F3-5 Maintenance Facility Location: HAFB, UT Agency: USACE, District Sacramento (SPK) NAICS Code: 236210 – Industrial Building Construction Total Program Funding: F-35 Composite Repair and Training Facility - $157,886,000 and F-35 Maintenance Facility - $213,716,000.00 Project Description F-35 Composite Repair and Training Facility: Construct a medium bay F-35 training facility for personnel assigned to repair composite components for F-35 fighter aircraft. There will also be an attached, medium-bay industrial facility to perform the composite repairs. The scope of the repair area includes a covered loading dock, clean rooms, cryogenic tanks, walk-in freezer, overhead cranes, offices, break areas, restrooms, and conference rooms. The training area will be operationally separated from the repair area. The scope of the training area includes clean rooms, sanding areas, autoclave areas, virtual spray booth rooms, spray paint booths, soldering labs, classrooms, testing center, administration area, conference rooms, instructor's offices, and a common area including restrooms and a break room. The construction will consist of reinforced concrete footings, foundation, floor slab, structural steel frame, insulated masonry walls, and insulated roof. Sensitive Access Program spaces shall comply with the Intelligence Community Directive 705 criteria and standards. The immediate area surrounding the anechoic chambers and the associated security office has been determined to be a SAPF level security area and will require ICD 705 protection. The project will include heating, ventilation, air conditioning, industrial ventilation, compressed air, emergency back-up power generators, intrusion detection, fire detection/suppression, utilities, site improvements, communication support, and all other interior and exterior features for a complete and usable F-35 composite repair and training facility. Generators are authorized in accordance with Air Force Manual 32-1062, Electrical Systems, Power Plants, and Generators. Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. F-35 Maintenance Facility: Construct a multi-dock medium bay fighter aircraft maintenance hangar with parts storage/equipment areas, back shop, and administrative areas. Project scope includes composite aircraft corrosion control capability to include one paint bay and one de-paint bay. The proposed facility will have reinforced concrete footings, foundation, floor slab, structural steel frame, insulated walls, insulated roof, lightning protection, fire detection/suppression, and intrusion detection. The project will include pavements, site improvements, communication support, utilities and all required supporting facilities for a complete and usable facility to fulfill mission requirements. Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Acquisition Strategy (Pre-Award) The USACE will use a streamlined competitive selection process: Step 1 –White Papers: Interested parties will submit a Statement of Qualifications. The government intends to down-select up to three Companies to proceed to Step 2. Step 2 – Pitches: Selected Companies will participate in pitch meetings. One company will be selected as the Design-Build team for award of the initial design and preconstruction services with a modification for design completion and construction award. Award The agreement will be awarded to the most qualified progressive design-build entity (PDBE) to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes Design and Pre-construction services and Post-award Phase 2 includes the final design and construction. Key Security Requirements General Requirement and Authority Required Level: The Government has determined that this project requires a Cybersecurity Maturity Model Certification (CMMC) Status of Level 1 (Self-Assessment). Performance under the resulting Agreement will require the handling of Federal Contract Information (FCI). Interested parties must have achieved a Final Level 1 (Self-Assessment) Status and, at the time of award, affirm completion of the required self-assessment and attestation. All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Program Solicitation.
-Special Notice11/12/2026
Award Announcement for PROJECT TITLE: T7A DEPOT MAINTENANCE COMPLEX (DMC) DB, PROJECT LOCATION: HILL AFB, UTAH
-AwardedOpen
Amendment 0003 - The reason for this amendment is to update Division 01 LMTF RRF HILL AFB FINAL DIV01 Spec 24JULY2026 269A001 and provide information regarding the site visit. Amendment 0002 - The reason for this amendment is to incorporate the RFIs and provided additional attachments under Project Specific Requirements. Amendment 0001 - The reason for this amendment is to update DIV 01 Specs, file name: LMTF_RRF_HILL_AFB_FINAL_DIV01_Specs_08JULY2026_269A001. This is the Official Posting of the Program Solicitation for Little Mountain Testing Facility (LMTF) Progress-Design-Build OT.The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK) is issuing Program Solicitation No. W91238-26-9-A001 as an Initial Announcement for the Little Mountain Test Facility (LMTF) Radiation Research Facility at Hill Air Force Base, Utah. The project will be awarded under the authority of Title 10 U.S.C. ? 2808a using a Progressive Design-Build (PDB) Other Transaction (OT) Agreement. The selected Design-Builder will perform Phase 1 Design and Pre-Construction Services, with the potential for Phase 2 Final Design and Construction through modification upon successful negotiation of a Fixed-Price (FP) or Guaranteed Maximum Price (GMP), subject to required approvals and funding availability. The project, classified under NAICS 236210 and PSC Y1AZ, has an estimated Not-to-Exceed (NTE) value of $111.5 million. The new Radiation Research Facility is required to modernize testing capabilities and provide dedicated space for critical equipment supporting the Sentinel weapon system while ensuring uninterrupted testing operations for the existing Minuteman III system. The Government intends to make a single OT award but reserves the right to select, not select, or continue discussions with any Design-Builder at any stage of the solicitation process. Bidding Inquiry System: All questions regarding this Program Solicitation must be submitted through the ProjNet Suite Bidder Inquiry System at https://www.projnet.org/projnet. Solicitation Number: W91238-26-9-A001 Bidder Inquiry Key: DSK6IU-VBHJM5 See all attachments in PIEE.
-Solicitation08/12/2026
The proposed acquisition is for the establishment of a "MACC BOA" for construction requirements on Travis Air Force Base, CA. The intent is to establish two pools of contractors, Pool 1 is for minor non-complex construction, while Pool 2 is contemplated to be for design-build requirements or major construction. Pool 1: Minor Construction will consist of non-complex construction contracts that do not include design. Pool 2: Major Construction will be used for more complex requirements that require design. The SF 1442 used in the attachments is for infomrational use only. It is there to demonstrate the clauses that are being proposed in the future agreements. Amendment 1: Changes the date the applications are due. It also incorporates responses to the RFIs. 19 May 2025: Synopsis for Anticipated Orders for FY25 has been added. The synopsis does not guarantee the government will award the projects included. 5 June 2025: Updated list of synopsis for potential pool 1 awards added. 11 August 2025: Updated list of synopsis for potential pool 1 awards added. 23 Sep 2025: Pool 1 and Pool 2 are open for applications until 15 May 2030. 15 Dec 2025: Synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included. 31 Dec 2025: 2nd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included. 7 Jan 2026: 3rd, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included. 22 Jan 2026: 4th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included. 28 Jan 2026: 5th, additional synopsis for Anticipated Pool 2 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included. 5 Feb 2026: 6th, additional synopsis for Anticipated Pool 1 Orders for FY26 has been added. The synopsis does not guarantee the government will award the projects included. 18 Feb 2026: 7th, additional synopsis for Anticipated Pool 1 Orders has been added to include B4 Sewer & Manhole Relining, and B381 Room 510 A Server Room AC Split Replacement Phase 2. 19 Feb 2026: Amendment 2 updates the Consolidated RFI Responses and revises Attachments 6 and 7. 26 Feb 2026: 8th, amended synopsis for Anticipated Pool 1 Order has been added to include B859 Carpet Replacement with Interior Paint Building and Window Replacement 10 Mar 2026: 9th, additional synopsis for Anticipated Pool 1 Orders has been added to include B380A Chiller Replacement and B383 Boiler Replacement. 27 Mar 2026: Amendment 3 updates the Consolidated RFI responses and amends Attachments 6 and 7. 21 Apr 2026: 10th, additional synopsis for Anticipated Pool 1 Orders has been added to include Renovation of Travis Fisher House 2 and 11th, additional synopsis for Anticipated Pool 2 Orders has been added. 22 Apr 2026: 12th, additional synopsis for Anticipated Pool 1 Orders has been added to include B920 Fencing. 4 May 2026: 13th, additional synopsis for Anticipated Pool 1 Orders has been added to include Dog Park Installation and P1 Power Pro Office Renovation. 14 July 2026: 14th, additional synopsis for Anticipated Pool 1 Orders has been added. 15 July 2026: 15th, additional synopsis for Anticipated Pool 1 Orders has been added.
-Solicitation05/16/2025

Additional Details

Solicitation Number

140p8624r0011

Archive Date

Oct 11, 2024

Office Address

SAN FRANCISCO, CA, 94123