J--GLBA CORRECT MEDIUM VOLTAGE DEFICIENCIES
Archived on January 1, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM EST
- Posted
- December 9, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of the InteriorNATIONAL PARK SERVICE
Notice details
- Office
- ALASKA REGIONAL OFFICE(97000)
- Last updated
- Nov 5, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 140P9725Q0097
- Notice ID
- dc3f1eb14e194a9eb45a206634a2a479
Description
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (26)
- Download
Sol_140P9725Q0097_Amd_0006.pdf
83 KBAdded in Combined Synopsis/Solicitation version 8Posted - Download
B08_Solicitation_-_Combo_Syn-Sol_0006.pdf
752 KBAdded in Combined Synopsis/Solicitation version 8Posted - Download
Sol_140P9725Q0097_Amd_0005.pdf
82 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
B09_Q_As__2_at_Amend_05_0005.pdf
127 KBAdded in Combined Synopsis/Solicitation version 6Posted - Download
Sol_140P9725Q0097_Amd_0004.pdf
82 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
B09_Amend_04_Pic_2_0004.jpg
4.1 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
B09_Amend_04_Pic_1_0004.jpg
5.5 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
B09_Amend_04_Pic_3_0004.jpg
3.8 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
B09_Amend_04_Pic_4_0004.jpg
2.5 MBAdded in Combined Synopsis/Solicitation version 5Posted - Download
B09_Q_As_at_Amend_04_0004.pdf
91 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
Sol_140P9725Q0097_Amd_0003.pdf
87 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Sol_140P9725Q0097_Amd_0002.pdf
82 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Sol_140P9725Q0097_Amd_0001.pdf
82 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
B09_Amend_01_-_Pic_1_0001.jpg
5.5 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
B09_Amend_01_-_2003_as-builts_redlines_0001.pdf
1.9 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
B09_Amend_01_-_PIC_2_0001.jpg
4.1 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
B09_Amend_01_-_Pic_3_0001.jpg
3.8 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
B09_Amend_01_-_Pic_4_0001.jpg
2.5 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
B09_Amend_01_-_PIC_5_0001.jpg
1.9 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
B09_Amend_01_-_Pull_Boxes_0001.pdf
115 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
B09_Amend_01_-_Q_As_0001.pdf
52 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
B09_Amend_01__-_Transformer_0001.pdf
315 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
B09_Amend_01_-_Google_Map_0001.jpg
1.1 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Sol_140P9725Q0097.pdf
165 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
B03_DOL_WD_2015-5685_Rev_26.pdf
47 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
B08_SOW.pdf
429 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
GLBA CORRECT MEDIUM VOLTAGE DEFICIENCIES
- 2Version 2Combined Synopsis/SolicitationArchived
J--GLBA CORRECT MEDIUM VOLTAGE DEFICIENCIES
- 3Version 3Combined Synopsis/SolicitationArchived
J--GLBA CORRECT MEDIUM VOLTAGE DEFICIENCIES
- 4Version 4Combined Synopsis/SolicitationArchived
J--GLBA CORRECT MEDIUM VOLTAGE DEFICIENCIES
- 5Version 5Combined Synopsis/SolicitationArchived
J--GLBA CORRECT MEDIUM VOLTAGE DEFICIENCIES
- 6Version 6Combined Synopsis/SolicitationArchived
J--GLBA CORRECT MEDIUM VOLTAGE DEFICIENCIES
- 8Version 8Combined Synopsis/SolicitationArchivedCurrent
J--GLBA CORRECT MEDIUM VOLTAGE DEFICIENCIES
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This is a solicitation notice for a total small business set aside design build Request for Proposal (RFP) to install power on the southeast of Hangar 1 to accommodate the Black Hawk Aircrew Trainer (BAT) and the Transportable Flight Procedure Simulator (TFPS) including the ECU units for each device. Electrical requirements for each device are: two 120/208v, 200 amp, 60Hz, three phase, 4 wire plus ground services with MS980555C52412S or MS90555C52143S receptacles. The project will connect Simulators to the Fire Alarm System, converting bay areas to a wet pipe sprinkler system, and correct egress deficiencies and other life safety repairs needed to ensure life safety including code required egress/emergency lighting and the like. Finally, the project will also install expanded metal mesh in a prefab arms vault that was installed in the structural repair project (FTW433) to be in compliance with AR190-11 Tab G to be used as an Arms Room. Updates to the existing fire system to meet current building codes may be required. This building has been identified as a historical building. Coordination with the SHPO will be required to ensure project will not violate any laws or regulations. The construction cost limitation for this requirement is $18,000,000. The performance period will be approximately 600 calendar days. | - | Solicitation | 06/25/2026 |
NHOTIC AV SYSTEM REPLACEMENT | - | Solicitation | 11/20/2026 |
GA-OKEFENOKEE NWR-00000-NEW VC ELECTRICA | - | Combined Synopsis | 11/17/2026 |
This is a inviation for bid, for construction services to replace Fire Alarms and Intrusion Systems at SACN. | - | Solicitation | 11/30/2026 |
AK-KENAI NWR-AUDIOVISUAL REPAIR | - | Combined Synopsis | 09/21/2026 |
Additional Details
Solicitation Number
140P9725Q0097
Archive Date
Jan 1, 2026
Office Address
ANCHORAGE, AK, 99501