GovChime
Notice ID: 615ee56af59cc16f915c84461ec5e66dAward NoticeAwarded

Y--Hungry Horse Rock Scaling

Awarded on May 23, 2019. Full description on SAM.gov.

Awarded tounder 140R1019C0010 (source: SAM.gov award notice)• $997.9K

Overview

Posted
May 28, 2019
Notice type
Award Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of the Interior

Notice details

Place of performance
Hungry Horse Dam<br />2501 Colorado Blvd<br />Hungry Horse<br />MT<br />59919<br />USA<br /> 59919 USA
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Sep 10, 2025
Award date
May 23, 2019
Award amount (SAM.gov award notice)
$997.9K

Identifiers

Solicitation number
140R1019B0002
Notice ID
615ee56af59cc16f915c84461ec5e66d
Award number (PIID)
140R1019C0010

Description

IGF::OT::IGF Hungry Horse Rock Scaling

Full description on SAM.gov

Award Overview

Award Number

140R1019C0010

Award Amount (SAM.gov award notice)

$997.9K

Award Date

May 23, 2019

Awardee

Awardee UEI

M9J8CSRPDZM1

Original Solicitation

Notice ID: 615ee56af59cc16f915c84461ec5e66d

Posted Date: May 28, 2019

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140R1019B0002
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Special NoticeDec 10, 2018

    Y--Hungry Horse Rock Scaling

    Notice 8b2b649bbf58c1305d5050793a835877 on SAM.gov

  2. 5×
    Pre-SolicitationFeb 13, 2019

    Y--Hungry Horse Rock Scaling

    Notice eb88063b4709ecabba3af9754ee90e5c on SAM.gov

  3. SolicitationApr 26, 2019

    Y--Hungry Horse Rock Scaling

    Notice 1c46e0a2dbf213b348bad31cfae325c0 on SAM.gov

  4. AwardedCurrentMay 28, 2019

    Y--Hungry Horse Rock Scaling

    Notice 615ee56af59cc16f915c84461ec5e66d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Cableway Crane Refurbishment - Hoover Dam
56%
Solicitation12/18/2026
The California Great Basin Region of the Bureau of Reclamation intends to issue an Invitation for Bid (IFB) for a firm fixed-price construction contract for Folsom Dam Vessel Exclusion Barrier and Debris Boom. This procurement will be advertised as a Total Small Business set aside. Solicitation will be issued as an Invitation for Bid (IFB) using FAR Part 14, Sealed Bidding procedures. The work to be performed is described below. The applicable North American Industry Classification System (NAICS) Code is 237990 and the related small business size standard is $45M. This notice is not a request for proposal and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. All responsible sources may submit a bid which will be considered by the agency. The estimated cost of this project is between $5 Million and $10 Million. This procurement will require 100% performance and payment bonds. The work is located at U.S. Bureau of Reclamation, Folsom, California. PRINCIPAL COMPONENTS OF WORK: • Remove and salvage part of the existing barrier on the Folsom dam as shown on the contract drawings. • Design, furnish and install a new vessel exclusion barrier and debris curtain and its components listed on this specification. • Furnish and install onshore anchor on the right-wing side of the dam. • Removal of obstruction along the path of the barrier to the onshore anchor and filling the large gaps on the existing riprap with smaller rocks on the right wing dam. • Furnish and install necessary warning lights and signage. • Design, furnish and installation of necessary anchors, clump anchors, buoys and moorings. • Provide certification of the new barrier according to the requirements set forth on this specification. • Provide one (1) spare module and two (2) spare module-to-module connectors and the required hardware for use. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. Solicitation 140R2026B0001 will be posted electronically via www.sam.gov on or about June 29, 2026. The date for receipt of offers will be approximately July 30, 2026. The solicitation must be downloaded at the above website; no paper copy of this solicitation will be distributed. Prospective contractors MUST be actively registered in the System for Award Management (SAM) database at http://www.sam.gov to be eligible for award. Questions concerning this solicitation should be directed to Rosana Yousef Goarji via email at rosana_yousefgoarji@ios.doi.gov . Construction Contraction Administration: Revolutionary Federal Acquisition Regulation Overhaul (RFO) 36.101-4 requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: https://www.doi.gov/pam/acquisition/policy/constructioncontract.
56%
Pre-SolicitationOpen
DK Heart Butte Dam Safety Modification PRE - SOLICITATION NOTICE 140R6026R0004 The Bureau of Reclamation (hereinafter referred to as Reclamation) Missouri Basin Regional Office intends to solicit a Request for Proposals (RFP) on or around April 10, 2026, as described in this Pre-Solicitation Notice. The RFP will be issued via the Sam.Gov web page at https://sam.gov Reclamation Dakotas Area Office (DKAO) has a need for a comprehensive suite of civil, geotechnical, and structural construction activities designed to enhance the long-term safety, stability, and performance of the Heart Butte dam infrastructure as described below. The solicitation will be issued under full and open competition. In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the Reclamation Missouri Basin Regional Office previously hosted an Industry Day Event for the Heart Butte Dam Safety of Dams Modification project located near Elgin, North Dakota. Please see special notice number DOIRFB0240024 on sam.gov for additional information regarding the industry day previously held in relation to this pre-solicitation notice. This procurement will utilize Far Part 15 procedures. The government intends to award a Firm Fixed Price purchase order to one contractor to accomplish this scope of work. Heart Butte Dam Safety Modification (HBSDM) Project Scope of Work The scope of work includes, but is not limited to, the following major components: 1. Dewatering and Unwatering Systems Design, installation, operation, and maintenance of temporary dewatering and unwatering systems to facilitate dry working conditions within the outlet works and adjacent excavation zones. Systems shall be capable of managing both surface water and groundwater inflows throughout all phases of construction. 2. Cofferdam Works Engineering design, construction, and subsequent removal of temporary cofferdams to isolate work areas from reservoir and tailwater influences. Cofferdams shall meet all applicable safety and hydraulic performance criteria and be coordinated with dewatering operations. 3. Foundation Void Remediation Injection grouting to fill and stabilize voids or discontinuities within the foundation materials, accessed from within the outlet works conduit. Grouting operations shall be performed using low-mobility or chemical grout, as specified, to ensure compatibility with existing geologic conditions. 4. Outlet Works Conduit Rehabilitation Selective demolition of deteriorated concrete sections using saw cutting and hydro-demolition techniques. Installation of temporary structural shoring to support conduit integrity during repair operations. Reinforcement repair and reconstruction of the conduit to restore structural capacity and hydraulic performance. 5. Jet Grouting Operations Execution of jet grouting from both interior and exterior access points of the outlet works conduit to improve ground strength and reduce permeability. Grouting shall be performed in accordance with engineered patterns and quality control protocols to ensure uniform treatment. 6. Embankment Excavation Controlled excavation of designated portions of the existing dam embankment to facilitate installation of new filter and drainage systems. Excavation shall be staged and supported to maintain embankment stability and minimize risk to existing structures. 7. Filter and Drainage System Construction Construction of a new sand filter trench to intercept and manage seepage flows. Installation of a zoned filter and drain system, including sand filter layers, gravel drainage zones, and protective berms, designed to meet modern dam safety standards. 8. Toe Drain System Installation Placement of high-density polyethylene (HDPE) toe-drain piping systems, including associated observation wells and cleanouts, to enhance seepage monitoring and control. All components shall be installed to specified grades and alignments to ensure long-term functionality. 9. Earth Retaining Structures Furnishing and installation of pre-fabricated earth retaining wall systems to support excavation faces and permanent embankment features. Retaining walls shall be designed for site-specific loading conditions and integrated with adjacent structures. 10. Outlet Conduit Joint Sealing Application of chemical grouting techniques to seal joints within the outlet works conduit, preventing internal leakage and mitigating potential piping pathways. Please see Attachment #1 (00 00 01_Specifications_2.23.26) for a copy of the current Reclamation specifications for more information. The government intends to award a Firm Fixed Price contract for the forthcoming solicitation with discussions. The government is seeking a waiver from the requirements for the implementation of a Project Labor Agreement (PLA). Working hours are anticipated to be 24 hours a day for 6 days a week. The government is requesting responses to this pre-solicitation announcement no later than March 31, 2026 at 1700MT. Please send all correspondence related to this pre-solicitation announcement to Mitchell Frost at mfrost@usbr.gov. It is incumbent upon contractors to monitor the Sam.Gov for RFP release and all subsequent amendments, if applicable. Effective October 26, 2018, all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database when submitting an offer or quotation. Note: Registering in ¿SAM¿ does not constitute an automatic award of any contract or agreement to the registering contractor. SAM is centralized database for consolidating the Central Contractor Registration (CCR), the online Representation and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Additionally, the contractors Unique Entity Identifier (UEI) is required for the SAM registration and annual confirmation requirements must be accomplished through the SAM website at https://www.sam.gov. For assistance with registering in SAM, contact the Federal Services Desk at 1-866-606-8220. Training videos are also available on the SAM.gov website under Learning Center; to help users understand the features and functionality of the site. Payment Requests for the anticipated contract must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform (IPP) system. The IPP website is located at https://www.ipp.gov. The contractor must use the IPP website to register access and submit requests for payment. Contractors may obtain assistance by contacting the IPP Production Helpdesk via e-mail ippgroup@bos.frb.org or phone 1-866-973-3131. If the contractor is unable to comply with the requirements to use IPP for invoice submission, the contractor must submit a waiver request in writing to the Contracting Officer with its proposal. The estimated price of this construction effort is more than $10,000,000. This pre-solicitation notice is not a RFP and does not in any way authorize vendors to incur costs on behalf of the Government.
56%
Pre-Solicitation03/31/2026
Heart Butte Dam Modification Sources Sought Notice December 18, 2025 This announcement is being used for market research and advanced planning purposes. Proposals are not requested and will not be accepted from this Sources Sought Notice. THIS IS NOT A SOLICITATION FOR PROPOSALS AND A CONTRACT WILL NOT BE AWARDED AS A RESULT OF THIS NOTICE. In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the United States Bureau of Reclamation (Reclamation), Missouri Basin Regional Office, previously hosted an Industry Day Event for the Heart Butte Dam Safety of Dams Modification (HBSDM) project located near Elgin, North Dakota. Please see special notice number DOIRFB0240024 on sam.gov for additional information regarding the industry day previously held in relation to this Sources Sought notice. Heart Butte Dam Safety Modification (HBSDM) Project ¿ Scope of Work The Heart Butte Dam Safety Modification project encompasses a comprehensive suite of civil, geotechnical, and structural construction activities designed to enhance the long-term safety, stability, and performance of the dam infrastructure. The scope of work includes, but is not limited to, the following major components: 1. Dewatering and Unwatering Systems ¿ Design, installation, operation, and maintenance of temporary dewatering and unwatering systems to facilitate dry working conditions within the outlet works and adjacent excavation zones. ¿ Systems shall be capable of managing both surface water and groundwater inflows throughout all phases of construction. 2. Cofferdam Works ¿ Engineering design, construction, and subsequent removal of temporary cofferdams to isolate work areas from reservoir and tailwater influences. ¿ Cofferdams shall meet all applicable safety and hydraulic performance criteria and be coordinated with dewatering operations. 3. Foundation Void Remediation ¿ Injection grouting to fill and stabilize voids or discontinuities within the foundation materials, accessed from within the outlet works conduit. ¿ Grouting operations shall be performed using low-mobility or chemical grout, as specified, to ensure compatibility with existing geologic conditions. 4. Outlet Works Conduit Rehabilitation ¿ Selective demolition of deteriorated concrete sections using saw cutting and hydro-demolition techniques. ¿ Installation of temporary structural shoring to support conduit integrity during repair operations. ¿ Reinforcement repair and reconstruction of the conduit to restore structural capacity and hydraulic performance. 5. Jet Grouting Operations ¿ Execution of jet grouting from both interior and exterior access points of the outlet works conduit to improve ground strength and reduce permeability. ¿ Grouting shall be performed in accordance with engineered patterns and quality control protocols to ensure uniform treatment. 6. Embankment Excavation ¿ Controlled excavation of designated portions of the existing dam embankment to facilitate installation of new filter and drainage systems. ¿ Excavation shall be staged and supported to maintain embankment stability and minimize risk to existing structures. 7. Filter and Drainage System Construction ¿ Construction of a new sand filter trench to intercept and manage seepage flows. ¿ Installation of a zoned filter and drain system, including sand filter layers, gravel drainage zones, and protective berms, designed to meet modern dam safety standards. 8. Toe Drain System Installation ¿ Placement of high-density polyethylene (HDPE) toe-drain piping systems, including associated observation wells and cleanouts, to enhance seepage monitoring and control. ¿ All components shall be installed to specified grades and alignments to ensure long-term functionality. 9. Earth Retaining Structures ¿ Furnishing and installation of pre-fabricated earth retaining wall systems to support excavation faces and permanent embankment features. ¿ Retaining walls shall be designed for site-specific loading conditions and integrated with adjacent structures. 10. Outlet Conduit Joint Sealing ¿ Application of chemical grouting techniques to seal joints within the outlet works conduit, preventing internal leakage and mitigating potential piping pathways. This scope of work is intended to address critical dam safety concerns through a combination of structural rehabilitation, seepage control, and foundation improvement measures. All work shall be executed in accordance with applicable federal, state, and local regulations, as well as project-specific technical specifications and quality assurance requirements. The government intends on awarding a Firm Fixed Price contract with a period of performance of approximately December 31, 2026, to June 30, 2030, or 1,277 calendar days. The Government is seeking interest from large businesses, 8(a) and small businesses, small-disadvantaged businesses, woman-owned small businesses, HubZone small businesses and/or service-disabled veteran owned small business concerns who have the specialized knowledge, experience, and resources necessary to successfully complete a project of this size, scope, and complexity. The NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction with a business size standard of $45.0 million. The Government will not reimburse any costs associated with responding to this Sources Sought Notice. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The Government will not be bound by this information if a solicitation is issued. Responses to this Sources Sought notice may include capability statements, past performance information, and any additional details that respondents believe demonstrate their company's capacity to undertake the size, scope, complexity, and magnitude of this effort. All responses should be submitted to Contracting Officer Mitchell Frost at mfrost@usbr.gov by 1700 EST on January 4, 2026.
56%
Market Research01/04/2026
MOD/MODE/US BYPASS CANAL REPAIRS
54%
Solicitation12/14/2026

Additional Details

Solicitation Number

140R1019B0002

Archive Date

Jun 7, 2019

Office Address

DENVER, CO, 80225