GovChime
Notice ID: 2251d48f75cb475a83c46a897942940eAward NoticeAwarded

Z--John W. Keys III Pump-Generating Plant Discharge T

Awarded on August 20, 2020. Full description on SAM.gov.

Awarded tounder 140R1020C0012 (source: SAM.gov award notice)• $33.7M

Overview

Posted
August 21, 2020
Notice type
Award Notice
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of the Interior

Notice details

Last updated
Apr 29, 2026
Award date
Aug 20, 2020
Award amount (SAM.gov award notice)
$33.7M

Identifiers

Solicitation number
140R1020R0003
Notice ID
2251d48f75cb475a83c46a897942940e
Award number (PIID)
140R1020C0012

Description

John W. Keys III Pump-Generating Plant Discharge Tube Coating-Lining Rehabilitation

Full description on SAM.gov

Award Overview

Award Number

140R1020C0012

Award Amount (SAM.gov award notice)

$33.7M

Award Date

Aug 20, 2020

Awardee

Awardee UEI

X9C9L6JMHGV3

Original Solicitation

Notice ID: 2251d48f75cb475a83c46a897942940e

Posted Date: Aug 21, 2020

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • 140R1020C0012
    HARTMAN-WALSH PAINTING COMPANY
    Department of the InteriorNAICS 237110
    $37.7MSigned Aug 24, 2026
  • 140R1020C0012
    HARTMAN-WALSH PAINTING COMPANY
    Department of the InteriorNAICS 237110
    $34.8MSigned Aug 13, 2026
  • 140R1020C0012
    HARTMAN-WALSH PAINTING COMPANY
    Department of the InteriorNAICS 237110
    $34.8MSigned Aug 10, 2026
  • 140R1020C0012
    HARTMAN-WALSH PAINTING COMPANY
    Department of the InteriorNAICS 237110
    $34.8MSigned Jun 2, 2026
  • 140R1020C0012
    HARTMAN-WALSH PAINTING COMPANY
    Department of the InteriorNAICS 237110
    $34.6MSigned Apr 30, 2026

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140R1020R0003
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationNov 12, 2019

    Z--John W. Keys III Pump-Generating Plant Discharge Tube Coating-Lining Rehabilita

    Notice 7bf2b78af86541599a76130a3d1e56de on SAM.gov

  2. SolicitationApr 2, 2020

    John W. Keys III Pump-Generating Plant Discharge T

    Notice 7eb6ca3a0418492bbfb7e1b207201d07 on SAM.gov

  3. 2×
    Pre-SolicitationApr 15, 2020

    Z--John W. Keys III Pump-Generating Plant Discharge Tube Coating-Lining Rehabilita

    Notice 85276c9e19d34424ba27b5181334d383 on SAM.gov

  4. 3×
    SolicitationApr 22, 2020

    Z--John W. Keys III Pump-Generating Plant Discharge T

    Notice d3c703879fdf4d709a0b9f1d4ad2d5c2 on SAM.gov

  5. AwardedCurrentAug 21, 2020

    Z--John W. Keys III Pump-Generating Plant Discharge T

    Notice 2251d48f75cb475a83c46a897942940e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
A. This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654. B. Base work includes the following described below: 1. Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing. 2. Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces. 3. Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces. 4. Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin. Additionally, replacement of an existing galvanized barb fitting with a brass barb fitting is required. C. Optional work includes the following described below: 1. Removal of existing wood decking and foundation piers and fabrication and installation of new expanded metal decking with steps over a metal frame with new foundation piers. D. Quantities associated with these options are identified in the Schedule of Items
-Combined Synopsis11/28/2026
GRTE 237343 - "Rehabilitate 4 Lazy F Ranch Cabins for Employee Housing" UPDATE: See AM 003 for NPS responses to RFI's received. This solicitation is being issued as a Total Small Business Set Aside. Please see the attached solicitation package for details regarding this construction project at Grand Teton National Park. Please contact only the Contracting Officer at anthony_jasper@ios.doi.gov if you have questions pertaining to this project. Thank you for your interest in working with the National Park Service.
-Solicitation11/20/2026
OR-MALHEUR NWR-DOMESTIC WELL
-Solicitation01/05/2027
GRCA 318719 North Rim & Roaring Springs Rehabilitation Program
-Solicitation01/08/2027
NGWSP Turnout Buildings
-Solicitation12/01/2026

Additional Details

Solicitation Number

140R1020R0003

Archive Date

Sep 4, 2020

Office Address

BOISE, ID, 83706