GovChime
Archived

Y--Conconully Dam, WA, Safety of Dams Modification

Overview

Response deadline
5:00 PM MDT
Posted
September 10, 2026
Notice type
Sources Sought
Agency
Department of the InteriorBUREAU OF RECLAMATION

Notice details

Office
PACIFIC NW REGION PN 6615
Place of performance
Conconully, Washington, 98819
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
140R1026R0004
Notice ID
91528f8fda2d4834ba2e3dbbfa1c0e19

Description

NOTICE TYPE: Sources Sought / Industry Day Invite

SUBJECT: Bureau of Reclamation Safety of Dams, Conconully Dam Seismic Modifications, Industry Day Invite

1. DISCLAIMER: This is a Sources Sought Notice/Industry Day Invitation only. This notice is issued solely for market research, information, and planning purposes. It does not constitute a Request for Proposals (RFP), a Request for Qualifications (RFQ), or a commitment by the Government to write, issue, or award an agreement or contract. The Government will not pay for any information or administrative costs incurred in response to this notice. All response costs will be borne solely by the interested party. Any future solicitations will be announced under a different solicitation number. Solicitation number 140R1026R0004 will be rendered obsolete after September 30th, 2026.

2. PROJECT OVERVIEW: The Department of Interior, Bureau of Reclamation is conducting a Sources Sought Notice/Industry Day Invitation for the Conconully Dam Seismic Modification project.

3. SCOPE OF WORK: Critical components of work for the project are anticipated to include:
A. Coordinate power, fiber, and telecommunications to the site including temporary and permanent installations.
B. Clearing, grubbing, and stripping of the work area and borrow areas.
C. Abandoning and removing existing site instrumentation including piezometers, weirs, shear strips, and seismic installations.
D. Earthwork for construction preparation and embankment construction.
E. Deep soil mixing of foundation materials.
F. Preparation of outlet works tunnel for outlet works lining and extension.
G. Performing bypass pumping or providing siphon flows over the spillway to meet in channel flow requirements during non-irrigation season to allow outlet work construction.
H. Excavation of outlet works alignment and Salmon Creek Access Road on the left abutment including rock excavation, cleaning, and rock slope stabilization.
I. Construction of outlet works piping including grout encasement and concrete encasement, drainage system, backfill, and inspection well.
J. Construction of a new outlet works valve house structure including placement of piping, valves, miscellaneous metalwork, retaining structures, and backfill.
K. Rock excavation and channel construction from the new valve house to connection with the existing Salmon Creek channel.
L. Construction of the stability berm including:
1. Foundation and bedrock cleaning and preparation,
2. Furnishing and installing filter and gravel blanket and chimney drains,
3. Furnishing and installing perforated and non-perforated high-density polyethylene (HDPE) toe drainpipes, cleanouts, inspection wells, flow measurement weirs, and associated outfall structures.
4. Furnishing and installing the upper and lower Fiber Optic Sensing Cables.
5. Excavating, screening, and transporting borrow material for the embankment berm fill.
6. Furnishing and installing new embankment piezometers and embankment measurement points.
M. Installation and construction of relief wells, vaults, and associated piping.
N. Final grading and construction of new dam access roads, security gates, and site fencing.
O. Final grading and construction of the boat ramp within the Graveyard Flat borrow area.
P. Preparing all disturbed areas for future restoration through tracking with equipment to leave rough surfaces.

4. Acquisition Information:

- Rough Order of Magnitude (ROM): The Government anticipates a ROM of $80,000,000 to $100,000,000.
- Projected Solicitation Date: The Government target solicitation period is late Fiscal Year (FY) 2027 or early FY 2028.
- Period of Performance (POP): Approximately 3 years

5. ACTION REQUIRED & SUBMISSION INSTRUCTIONS: Interested industry partners are requested to review the Attachment a. Industry Day Invitation to Industry Partners for action requirements and coordinating information.

6. Attachments:

a) Industry Day Invitation
b) Reclamation FIST 1-1 Hazardous Energy Control Program
c) Non-Disclosure Agreement (NDA)

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Fleming, Lance
Fax: 208378

Documents

Files (6)

  • Att_A__Industry_Day_Invitation_2.pdf

    145 KBAdded in Sources Sought version 6Posted
    Download
  • 2__RFI_Questions_1.pdf

    250 KBAdded in Special Notice version 3Posted
    Download
  • Att_B__Reclamation_FIST_1-1_Hazardous_Energy_Control_Program_2.pptx

    4.5 MBAdded in Sources Sought version 6Posted
    Download
  • 1__Project_Overview_Conconully_Dam_Modification_1.pdf

    234 KBAdded in Special Notice version 3Posted
    Download
  • Att_C__7-2577_FEDERAL_NON-DISCLOSURE_AGREEMENT_2.pdf

    1.5 MBAdded in Sources Sought version 6Posted
    Download
  • 3__21-D-T001_Location_and_Vicinity_Map_RS_1.pdf

    83 MBAdded in Special Notice version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Special NoticeArchived

    Y--Department of Interior, Bureau of Reclamation, Conconully Dam, WA, Safety of Da

    Notice bc8cd531c4314cb6a7348bb6088c2047 on SAM.gov

  2. 6
    Version 6Sources SoughtArchivedCurrent

    Type changed from Special Notice to Sources Sought

    Y--Conconully Dam, WA, Safety of Dams Modification

    Notice 91528f8fda2d4834ba2e3dbbfa1c0e19 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

140R1026R0004

Archive Date

Oct 15, 2026

Office Address

BOISE, ID, 83706