GovChime
Notice ID: 342d02fac03a4bc49fa0f1ca5b09593aAward NoticeAwarded

F--HH SOUTH FORK RIVER MONITORING

Awarded on March 22, 2021. Full description on SAM.gov.

Awarded tounder 140R1721P0012 (source: SAM.gov award notice)• $19.9K

Overview

Posted
March 22, 2021
Notice type
Award Notice
NAICS
541380: Testing Laboratories and Services
Agency
Department of the InteriorBUREAU OF RECLAMATION

Notice details

Office
GRAND COULEE POWER OFFICE
Last updated
Nov 29, 2025
Award date
Mar 22, 2021
Award amount (SAM.gov award notice)
$19.9K

Identifiers

Solicitation number
140R1721Q0034
Notice ID
342d02fac03a4bc49fa0f1ca5b09593a
Award number (PIID)
140R1721P0012

Description

HH SOUTH FORK RIVER MONITORING

Full description on SAM.gov

Award Overview

Award Number

140R1721P0012

Award Amount (SAM.gov award notice)

$19.9K

Award Date

Mar 22, 2021

Awardee

Awardee UEI

E3C2X74KTN38

Original Solicitation

Notice ID: 342d02fac03a4bc49fa0f1ca5b09593a

Posted Date: Mar 22, 2021

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140R1721Q0034
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationFeb 16, 2021

    F--HH SOUTH FORK RIVER MONITORING

    Notice ee12bd313a8c4307b59f0fc7b595e36e on SAM.gov

  2. SolicitationMar 1, 2021

    HH SOUTH FORK RIVER MONITORING

    Notice 90bd7ce492a24f4c983e22c143d2d8e6 on SAM.gov

  3. AwardedCurrentMar 22, 2021

    F--HH SOUTH FORK RIVER MONITORING

    Notice 342d02fac03a4bc49fa0f1ca5b09593a on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
X:NOGRN, SERVICE, WELL WATER QUALITY SAMPLING AND MONITORING SERVICES for SANTA MONICA MOUNTAINS NRA (SAMO).
77%
Combined Synopsis07/17/2026
The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section.
73%
Solicitation11/18/2026
71%
AwardedOpen
59%
Solicitation11/20/2026
Water Testing Durham VA Medical Center and CBOCs
59%
Pre-Solicitation11/09/2026

Additional Details

Solicitation Number

140R1721Q0034

Archive Date

Apr 6, 2021

Office Address

GRAND COULEE, WA, 99133