Notice ID: 1fcad8a7299e4ff19d307656977a1149Award NoticeAwarded
B--Lab Analysis of Low-Level Selenium in Water
Awarded on November 15, 2024. Full description on SAM.gov.
Awarded tounder 140R2022A0001 (source: SAM.gov award notice)• $64.5K
Overview
- Posted
- November 15, 2024
- Notice type
- Award Notice
- NAICS
- 541380: Testing Laboratories and Services
- Agency
- Department of the InteriorBUREAU OF RECLAMATION
Notice details
- Office
- MP-REGIONAL OFFICE
- Last updated
- Dec 5, 2025
- Award date
- Nov 15, 2024
- Award amount (SAM.gov award notice)
- $64.5K
Identifiers
- Solicitation number
- 140R2022A0001
- Notice ID
- 1fcad8a7299e4ff19d307656977a1149
- Award number (PIID)
- 140R2022A0001
Description
Lab Analysis of Low-Level Selenium in Water - Grassland Sediment, DMC/DMCNP/DMCSL, Baseline, Grassland Bypass Autosamplers and Bypass Waters
Award Overview
Award Number
140R2022A0001
Award Amount (SAM.gov award notice)
$64.5K
Award Date
Nov 15, 2024
Awardee
Awardee UEI
PJFLDVNSEBQ3
Original Solicitation
Notice ID: 1fcad8a7299e4ff19d307656977a1149
Posted Date: Nov 15, 2024
Original Response Deadline: Not specified
Task Orders Under This IDV
Top 10 by total obligated
- $147.5KSigned May 9, 2023
- $138.4KSigned Aug 3, 2023
- $138.4KSigned Nov 24, 2021
- $129.8KSigned Apr 9, 2025
- $129.8KSigned Aug 5, 2026
- $117.6KSigned Nov 12, 2024
- $116.6KSigned Jan 15, 2025
- $116.6KSigned Nov 1, 2023
- $83.6KSigned Mar 3, 2026
- $78.4KSigned Sep 12, 2024
More From This Vendor
Top 5 most recent
- $177.2KSigned Sep 1, 2026
- $129.8KSigned Aug 5, 2026
- —Signed Jul 23, 2026
- $83.6KSigned Mar 3, 2026
- $67.5KSigned May 12, 2025
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
140R2022A0001- Awarded
This opportunity has been awarded.
- 2×AwardedCurrentNov 1, 2023
B--Lab Analysis of Low-Level Selenium in Water
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
X:NOGRN, SERVICE, WELL WATER QUALITY SAMPLING AND MONITORING SERVICES for SANTA MONICA MOUNTAINS NRA (SAMO). | - | Combined Synopsis | 07/17/2026 |
Laboratory Analysis of Water Samples (i) This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued. (ii) Solicitation number 140RR027Q0021 is issued as a Request for Quote (RFQ). (iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01, as of March 1, 2026. (iv) This acquisition is open market, with no small business set aside. The NAICS code is 541380 ¿ Testing Laboratories and Services and the size standard is $19 million. (v) The contract line items are listed in the price schedule of the solicitation package. Please provide your rate for each test. (vi) This requirement is to acquire contractor services to provide laboratory analysis of water samples for the Central California Area Office - New Melones, as identified in this PWS. (vii) The period of performance is expected to be 5 years, a base year and 4 option years, from Jan 2027 ¿ Jan 2032. (viii) Provision 52.212-1, Instructions to Offerors - Commercial Products and Commercial Services, applies to this acquisition. The quote package will consist of the vendor¿s pricing information, capability statement, ELAP Certification, and past performance references. (ix) Provision 52.212-2, Evaluation - Commercial Products and Commercial Services, applies to this acquisition. Refer to this provision for information. (x) Clause 52.212-4, Contract Terms and Conditions - Commercial Products and Commercial Services, applies to this acquisition. There are not any addenda to this clause. (xi) All additional contract clauses and provisions are included in the attached solicitation package. (xii) The Defense Priorities and Allocations System (DPAS) do not apply to this acquisition. (xii) Quotes are due December 2, 2026 by 3:00 PM (Pacific Standard Time) and should be emailed to sherry_heibeck@ios.doi.gov. | - | Combined Synopsis | 12/02/2026 |
| - | Awarded | Open | |
36C26227Q0022 ******* The purpose of this amendment is to: 1. Respond to questions asked regarding this solicitation. 2. Change the Period of Performance (POP) start date from 11/20/2026 to 12/01/2026. Base: 12/01/2026 09/30/2027 OY 1: 10/01/2027 09/30/2028 OY 2: 10/01/2028 09/30/2029 OY 3: 10/01/2029 09/30/2030 OY 4: 10/01/2030 09/30/2031 3. Change the response due date from 11/09/2026 to 11/12/2026. Questions and Answers: Q. Can you please let me know the total number of outlets to be tested. A. 3,000 Total. Q. # vacuum inlets A. 3,000 Q. # of medical gas system source equipment & location Bulk Oxygen, Med air, Vacuum, Nitrogen, WAGD, Dental Air, Dental Vacuum, Carbon Dioxide. Locations Main Hospital and Building 32 (cancer center) Q. # of medical gas booms/columns A. 38, Please see attachment named BOOM INVENTORY . Q. Could you please clarify whether the prime contractor must independently hold the ASSE 6020 Medical Gas Inspector and ASSE 6030 Medical Gas Verifier certifications, or whether these requirements can be satisfied through a qualified subcontractor whose personnel possess the required certifications? A. ASSE 6020 and ASSE 6030 certifications are required. Q. What are the manufacturer, model, and serial number of the boom equipment, source equipment, vacuum and air system? At a minimum, we need a manufacturer, model #, serial number for each system and each motor/compressor. Would providing photos of the source equipment be possible? A. We do not have the serial numbers or photos of the boom equipment but please see Exell spreadsheet attached Boom Inventory which has the Make, Model and location. Q. The Government provide the most recent annual medical gas inspection report, or an inventory showing quantities of outlets/inlets by gas type, zone valve boxes, area alarm panels, master alarm panels and source equipment? A. No, we cannot provide the inspection report but we are providing the boom inventory. Please see Exell spreadsheet attached Boom Inventory . Q. Can the Government provide the most recent annual medical gas inspection report, or an inventory showing quantities of outlets/inlets by gas type, zone valve boxes, area alarm panels, master alarm panels and source equipment? A. No Q. If this is a follow-on requirement, what is the prior contract number? A. Prior Contract No. : 36C26222C0020 Q. Which gases and systems are in scope (oxygen, medical air, vacuum, nitrous oxide, nitrogen, carbon dioxide, WAGD, instrument air)? A. Please refer to statement of work section V. Scope Q. Is the bulk oxygen tank owned and maintained by the gas supplier, with the contractor s scope limited to the pipeline side? A. The bulk oxygen is owned and maintained by the supplier. Q. Are Category 3 systems, such as dental air and vacuum, in scope? A. Yes Q. Does the Government expect only annual periodic inspection and testing, or a full NFPA 99 system verification each year? A. Only Annual. Q. Does each annual CLIN cover a single inspection event per year? A. Yes Q. May the ASSE 6020 and 6030 credentials be held by subcontractor personnel instead of the prime s employees? A. Certs. Must be held by the prime and subcontractor. Q. Must the field team include both a 6020 inspector and a 6030 verifier, or is credential acceptable for annual testing? A. Yes Q. Should pricing assume evening or weekend work for the ICU, OR, SICU and ED zones? A. Yes. Q. If a master alarm sensor is not on a demand check fitting, will the VA allow a brief isolation to test it, or is that test excluded? A. Yes, a brief moment. Q. Are photos required for every outlet/inlet, or only for sources, alarm panels, zone valves and deficiencies? A. Only deficiencies. Q. How many particulate and dewpoint sample points are expected, based on the number of floors in the Main Hospital and Buildings 30, 31 and 32? A. No. This test will only to be performed for installation, repair, or modification of any medical gas piping systems, Building 29, 30 has no medical gas. Q. When was the last annual inspection done, and when was the first inspection due under this contract? A. The last inspection was completed on 11/24/25 - 2026 inspection needs to be completed before 12/21/26. Q. Oxygen particulate analysis: This filter test is typically performed as a pre-test during construction projects under NFPA 99. The results would generally be expected to remain unchanged unless the pipeline is breached during construction. Please confirm whether this test is required as part of the annual inspection. A. No particulate test performed during verification of newly installed or modified medical gas piping systems only. Q. ASSE 6010 certification: Please confirm whether ASSE 6010 certification is required. Our understanding is that this is a medical gas installer certification, rather than an annual inspection requirement under NFPA 99. A. No, only if repairs need to be performed, contractor shall be 6010 certified to make repairs. Q. Boom testing frequency: Please confirm whether boom testing is required annually. Our understanding is that NFPA 99 recommends testing every 18 months. A. VA requires this test to be performed annually. Q. Boom testing scope: Please confirm whether the testing includes disassembly of the booms to inspect for leaks and dry rot. A. Yes Q. Boom testing report: Please confirm whether the detailed report should include photographs of disassembled booms and a comprehensive list of recommended repairs. A. Yes, if any deficiencies are found. Q. Building confirmation: Mr. Stockman indicated that Eye Clinic Building 32 and Audiology Building 30 should be excluded from the proposal. Please confirm. A. Only main Hospital and building 31 (cancer center) will be tested annually. Q. Could you please clarify what repair work, if any, must be included in the annual fixed price? Specifically, should the contractor include any routine repairs or corrective maintenance, or will all repairs, replacement parts, and installation services be treated as separately authorized work under Section VI? A. This solicitation is only for Inspection, not for repairs. In the Statement of Work (Section VII) we have to include "Over and Above Repair" to clarify that the contractor must notify the POC immediately if any repairs needs to be made. | - | Combined Synopsis | 11/12/2026 |
Provide the services of an ABS approved ESP Hull Gauging firm to take and record ultrasonic thickness readings on ship's hull, bulkheads, deck plating, scantlings, piping, and in other areas throughout the ship as required by the MSCREP, USCG, and ABS Surveyor. The requirements of the ABS Special Hull Survey No.8 for Single Hull Tankers in the Enhanced Survey Program shall form the basis for this item. See solicitation documents for additional details and submission requirements. | - | Combined Synopsis | 11/18/2026 |
Additional Details
Solicitation Number
140R2022A0001
Archive Date
Nov 30, 2024