GovChime
Notice ID: 3813a67217fd47ebbb0ace904af603f3Award NoticeAwarded

Z--SHASTA HANGER ROD EMERGENCY INSTALLATION

Awarded on November 15, 2023. Full description on SAM.gov.

Awarded tounder 140R2024C0004 (source: SAM.gov award notice)• $323.0K

Overview

Posted
November 15, 2023
Notice type
Award Notice
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of the Interior

Notice details

Last updated
Sep 9, 2025
Award date
Nov 15, 2023
Award amount (SAM.gov award notice)
$323.0K

Identifiers

Solicitation number
140R2024C0004
Notice ID
3813a67217fd47ebbb0ace904af603f3
Award number (PIID)
140R2024C0004

Description

The temperature control device (TCD) is a steel structure consisting of a shutter structure and low level intake structure that are attached to the upstream face of Shasta Dam. The device encloses all five existing power penstock intakes and permits selective level withdrawal of reservoir water. High level withdrawal is controlled by the 250 ft-wide by 300 ft-high shutter structure. Construction of the TCD started in December 1994 and was substantially complete in December 1996. A special climb inspection was performed March 6-8, 2023. Following the climb inspection, engineering analysis was completed on the hanger rod group located at the right side, downstream corner of Shutter No. 3. The inspection and analysis have confirmed that the Left Side Upstream (LS-US) hanger rod assembly no longer has the ability to provide structural support. With the loss of the LS-US hanger rod assembly, the entire hanger rod group at the right side, downstream corner of Shutter No. 3 is at risk of failure. These hanger rod assemblies are considered critical structural components because the loss of one of these corner hanger rod groups would likely lead to the failure of Shutter No. 3, and adjacent Shutter Nos 2 and 4.

Full description on SAM.gov

Award Overview

Award Number

140R2024C0004

Award Amount (SAM.gov award notice)

$323.0K

Award Date

Nov 15, 2023

Awardee

Awardee UEI

PNF1UVJ6YE96

Original Solicitation

Notice ID: 3813a67217fd47ebbb0ace904af603f3

Posted Date: Nov 15, 2023

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

4
  • 140R2025C0001
    SHIMMICK CONSTRUCTION COMPANY, INC.
    Department of the InteriorNAICS 236220
    $6.3MSigned Sep 3, 2026
  • 140R2025C0001
    SHIMMICK CONSTRUCTION COMPANY, INC.
    Department of the InteriorNAICS 236220
    $6.3MSigned Jul 27, 2026
  • 140R2025C0001
    SHIMMICK CONSTRUCTION COMPANY, INC.
    Department of the InteriorNAICS 236220
    $6.3MSigned Apr 14, 2026
  • 140R2025C0001
    SHIMMICK CONSTRUCTION COMPANY, INC.
    Department of the InteriorNAICS 236220
    $6.3MSigned Dec 3, 2024

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140R2024C0004
  1. Awarded

This opportunity has been awarded.

  1. AwardedCurrentNov 15, 2023

    Z--SHASTA HANGER ROD EMERGENCY INSTALLATION

    Notice 3813a67217fd47ebbb0ace904af603f3 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This project consists of providing all materials, equipment, labor, transportation, and incidentals for completion of the repair storm damage sustained on three buildings at this site. The repairs are to include roof replacement, dry wall and insulation replacement, a door replacement, ceiling and insulation replacement, installation of gutters and downspouts, and to replace a portion of the side of the Chino Yard Office; to perform maintenance to the metal roofs on the Supervisor’s office and the Chino Shop; to repair window frames on upper windows, to caulk ALL of windows, and to install a Z bar at the roof line on the Supervisor’s Office; and to gutters and downspouts on the Chino Shop. This project could also include, if additional funds are available, optional bid items. The optional bid items are exterior painting on the Yard Office; replace the weather stripping on two garage doors and a door sweep on a manway; and if mold is found in the Supervisor’s Office to replace the dry wall and insulation.
60%
Combined Synopsis11/09/2026
The Smithsonian Institution (“Smithsonian”) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560. Note: This is a revised RFP. Do not use previous posted documents from SOL# 33330226RF0010007. The applicable North American Industry Classification Codes (“NAICS”) are: 236220 - Commercial and Institutional Building Construction size standard is $45.0 million. 238210 – Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million. Construction Budget: Over $10M. Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum’s lower level, which has exceeded its operational lifespan. This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance. Specifically, work under this project includes but is not limited to: a. Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS’s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level. b. Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout. c. Existing conditions documentation early in the construction phase for implementation into BIM models. d. Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study. e. A short circuit study of the proposed project prior to equipment submittals. f. Protection of existing finishes in the areas of work. g. Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up. h. Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building. Removal of existing conduit, panelboards, and pull-boxes throughout the building. i. Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation. j. Two switchover events: One from existing to temporary emergency power supplies and one for temporary to new emergency power supplies. k. Reinforcement of existing structure to support the new generators. l. Removal of the existing diesel generator in the lower level. m. Testing for lead and asbestos on existing piping at new points of connection. n. Mechanical work in the lower level to provide new fuel oil pumps. o. Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort. p. Work within and adjacent to sensitive 5th floor spaces including the Library and the Director’s Suite. q. All work is within an operational Museum with both staff and the public present. r. Ceiling removals and installation on the 4th and 5th floors. s. Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane. t. Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction. u. Integration and coordination of new mechanical and generator control systems into existing Siemens BAS. v. Initial testing, commissioning and black start of new electrical emergency generator systems. The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff. Construction Schedule: Total period of performance allowed for construction is 680 calendar days from the Notice to Proceed. This is not the requst for Proposals. The full solicitation, request for proposals and supporting documents will be released on or about beginning of December 2026; however, there is no guarantee or implication of a guarantee this this project will be solicited. Electronic copies will be uploaded to SAM.gov site. This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response. THIS IS NOT A REQUEST FOR PROPOSAL. DO NOT SUBMIT ANY DOCUMENTS.
57%
Pre-Solicitation02/10/2027
WI-NECEDAH NWR-ALBREIT LATERAL DITCH FILL
57%
Solicitation12/01/2026
EO 14398 ID-KOOTENAI NWR-Strip and Paint Exterior of EE Building
49%
AwardedOpen
THIS IS A NOTICE OF AWARD. The National Park Service is awarding Vintage Building & Restoration Inc; a small business, the contract to provide Siding Replacement for Pictured Rocks National Lakeshore, which is being purchased for $71,136.00.
49%
AwardedOpen

Additional Details

Solicitation Number

140R2024C0004

Archive Date

Nov 30, 2023

Office Address

SACRAMENTO, CA, 95825