Notice ID: fe56ef8f66d341a78d5b79e6007f767bAward NoticeAwarded
P--TRRP River Acres Property Demolition
Awarded on March 6, 2024. Full description on SAM.gov.
Awarded tounder 140R2024P0040 (source: SAM.gov award notice)• $75.9K
Overview
- Posted
- March 6, 2024
- Notice type
- Award Notice
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of the Interior
Notice details
- Last updated
- Sep 9, 2025
- Award date
- Mar 6, 2024
- Award amount (SAM.gov award notice)
- $75.9K
Identifiers
- Solicitation number
- 140R2024Q0031
- Notice ID
- fe56ef8f66d341a78d5b79e6007f767b
- Award number (PIID)
- 140R2024P0040
Description
TRRP River Acres Property Demolition
Award Overview
Award Number
140R2024P0040
Award Amount (SAM.gov award notice)
$75.9K
Award Date
Mar 6, 2024
Awardee
Awardee UEI
FNGXJVEJ2BB8
Original Solicitation
Notice ID: fe56ef8f66d341a78d5b79e6007f767b
Posted Date: Mar 6, 2024
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
140R2024Q0031- Market Research
- Solicitation
- Awarded
This opportunity has been awarded.
- Market ResearchDec 13, 2023
P--TRRP River Acres Property Demolition
- 2×SolicitationJan 16, 2024
P--TRRP River Acres Property Demolition
- AwardedCurrentMar 6, 2024
P--TRRP River Acres Property Demolition
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This project includes all work to demolish the existing fuel system. The existing fuel system consists of, but is not limited to, a 5,000-gallon diesel tank, diesel dispenser, concrete containment, light poles, and Automatic Tank Gauge. | 69% | Market Research | 10/01/2026 |
***This amendment is hereby issued to the above-referenced solicitation to provide revised Specifications, Bid Schedule, Technical Approach Drawings and Government Responses to ProjNet Bidder Inquiries. All other terms and conditions remain unchanged.***Amendment 0001 The purpose of this amendment is to correct the Cumulative Max Capacity for this project. The response date remains unchanged. The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform the repair, installation, demolition, removal/disposal, flood control, rehabilitation and/or restoration of U.S. Government lands and facilities and/or U.S. Government Sponsored work on and to structures, roads, parking lots, access areas, levees, drainage ditches, drainage features, creeks, wetlands, watersheds, shorelines, boat ramps, locks and dams infrastructure, and other construction and/or rehabilitation as specified in accordance with the contract specifications. Contract Areas and Construction Limits for the primary contract areas consist of alluvial floodplains, federal owned grounds, lock and dams, facilities, recreational sites, and watersheds in the following Missouri Counties of Ralls, Pike, Lincoln, St. Charles, St. Louis, Franklin, Jefferson, Ste Genevieve, Perry, Cape Girardeau, Scott, and Illinois Counties of Madison, Jersey, Calhoun, Green, Pike, Scott, Cass, Morgan St. Clair, Monroe, Randolph, Jackson, Alexander, and Union. During emergency circumstances as directed by the Contracting Officer the contractor may be required to perform work within the Missouri Counties of Ralls, Pike, Lincoln, St. Charles, and Illinois Counties of Jersey, Calhoun, Green, Pike, Scott, and Cass. Specific contract areas and construction limits will be specified within each task order. | 59% | Solicitation | 06/18/2026 |
The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform the repair, installation, demolition, removal/disposal, flood control, rehabilitation and/or restoration of U.S. Government lands and facilities and/or U.S. Government Sponsored work on and to structures, roads, parking lots, access areas, levees, drainage ditches, drainage features, creeks, wetlands, watersheds, shorelines, boat ramps, locks and dams infrastructure, and other construction and/or rehabilitation as specified in accordance with the contract specifications. Contract Areas and Construction Limits for the primary contract areas consist of alluvial floodplains, federal owned grounds, lock and dams, facilities, recreational sites, and watersheds in the following Missouri Counties of Ralls, Pike, Lincoln, St. Charles, St. Louis, Franklin, Jefferson, Ste Genevieve, Perry, Cape Girardeau, Scott, and Illinois Counties of Madison, Jersey, Calhoun, Green, Pike, Scott, Cass, Morgan St. Clair, Monroe, Randolph, Jackson, Alexander, and Union. During emergency circumstances as directed by the Contracting Officer the contractor may be required to perform work within the Missouri Counties of Ralls, Pike, Lincoln, St. Charles, and Illinois Counties of Jersey, Calhoun, Green, Pike, Scott, and Cass. Specific contract areas and construction limits will be specified within each task order. | 59% | Pre-Solicitation | 06/15/2026 |
The Tonto National Forest is looking to achieve a more sustainable recreation program. Through this project, several recreation areas will be decommissioned in the Tonto Basin Ranger District (RD), and Globe RD. The decommission of campgrounds at the Tonto Bassin RD is the base bid and at Globe RD, it is an option bid. The intent of this work is to remove and safely dispose outside of the National Forest boundaries, recreational accommodations that include but not limited to Entry station buildings, toilets buildings, sidewalks, asphalt pavement, fish cleaning stations, septic system, and parking lots. | 59% | Combined Synopsis | 11/30/2026 |
Amendment 0005 to add Questions and Answers, Attachment 18_ECS-000 - Construction Plans - Specifications and As-built Record Drawings, Attachment 19_BDA-Aviation-II-As-Built-Drawings-vol-1, and update PWS Paragraph 5.3.1 from (5.3.1. The BRK facilities, 1-25 are two story structures that are approximately 28-7 in height and approximately 97-4 in width, with metal siding and roofing panels. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a concrete slab on grade mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 3, 4 and 5 for structural information) to (5.3.1. The BRK Facilities 1 through 25 are two-story structures measuring approximately 97?4 wide, 33 long, and 28?7 high. Constructed with metal siding and roofing, each facility is built on a 4,400 sq ft concrete slab. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 1, 2 and 3 for structural information.) | 47% | Combined Synopsis | 06/15/2026 |
Additional Details
Solicitation Number
140R2024Q0031
Archive Date
Mar 21, 2024
Office Address
SACRAMENTO, CA, 95825