Z--Stampede Penstock and Butterfly Valve Rehab
Awarded on September 22, 2026. Full description on SAM.gov.
Overview
- Posted
- September 22, 2026
- Notice type
- Award Notice
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of the InteriorBUREAU OF RECLAMATION
Notice details
- Office
- MP-REGIONAL OFFICE
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
- Award date
- Sep 22, 2026
- Award amount (SAM.gov award notice)
- $4.1M
Identifiers
- Solicitation number
- 140R2026R0006
- Notice ID
- e6ce738a9f174051b70b824bccb22e67
- Award number (PIID)
- 140R2026C0011
Description
Award Overview
Award Number
140R2026C0011
Award Amount (SAM.gov award notice)
$4.1M
Award Date
Sep 22, 2026
Awardee
Awardee UEI
GDL7K7FPEC13
Awardee CAGE Code
1NVJ0
Awardee Address
4505 NE 68TH DR, Vancouver, WA 98661, UNITED STATES
Original Solicitation
Notice ID: e6ce738a9f174051b70b824bccb22e67
Posted Date: Sep 22, 2026
Original Response Deadline: Not specified
Contacts
Contracting Officer
Primary Contact
Documents
Files (32)
- Download
Sol_140R2026R0006_Amd_0005.pdf
203 KBAdded in Solicitation version 7Posted - Download
Amdt_0005-Section_J-Attch-6-Yaskawa_650_KW_Generator_Drawings_0005.pdf
988 KBAdded in Solicitation version 7Posted - Download
Amdt_0005-Attch_1-Questions_and_Answers_0005.pdf
139 KBAdded in Solicitation version 7Posted - Download
Sol_140R2026R0006_Amd_0004.pdf
204 KBAdded in Solicitation version 5Posted - Download
Attch_12-Section_52_00_00-Drawings_0004.pdf
214 KBAdded in Solicitation version 5Posted - Download
Attch_11-Section_31_03_33-Removal_and_Control_of_Water_0004.pdf
182 KBAdded in Solicitation version 5Posted - Download
Attch_2-Section_00_00_50-Section_B___0004.pdf
152 KBAdded in Solicitation version 5Posted - Download
Attch_1_-_Revised_Specifications_0004.pdf
975 KBAdded in Solicitation version 5Posted - Download
Attch_13-New_For_Information_Only_(FIO)_Drawings_0004.pdf
13 MBAdded in Solicitation version 5Posted - Download
Attch_3-Section_00_01_10-Table_of_Contents_0004.pdf
107 KBAdded in Solicitation version 5Posted - Download
Attch_8-Section_01_57_30-Water_Pollution_Control_0004.pdf
182 KBAdded in Solicitation version 5Posted - Download
Attch_9-Section_01_57_70-Fire_Protection_and_Prevention_0004.pdf
176 KBAdded in Solicitation version 5Posted - Download
Attch_10-Section_26_05_20-Grounding_and_Bonding_0004.pdf
115 KBAdded in Solicitation version 5Posted - Download
Attch_6-Section_01_35_20-Safety_and_Health_0004.pdf
222 KBAdded in Solicitation version 5Posted - Download
Attch_14-Questions_and_Answers_0004.pdf
236 KBAdded in Solicitation version 5Posted - Download
Attch_7-Section_01_35_50-Site_Security_0004.pdf
126 KBAdded in Solicitation version 5Posted - Download
Attch_4-Section_01_14_10-Use_of_Site_0004.pdf
138 KBAdded in Solicitation version 5Posted - Download
Attch_5-Section_01_33_00-Submittals_0004.pdf
371 KBAdded in Solicitation version 5Posted - Download
Sol_140R2026R0006_Amd_0003.pdf
203 KBAdded in Solicitation version 4Posted - Download
Att__1_Site_Visit_Attendance_Record_0003.pdf
63 KBAdded in Solicitation version 4Posted - Download
Sol_140R2026R0006_Amd_0002.pdf
203 KBAdded in Solicitation version 3Posted - Download
C05_04_Solicitation_140R2026R00006_0002.pdf
25 MBAdded in Solicitation version 3Posted - Download
Sol_140R2026R0006_Amd_0001.pdf
203 KBAdded in Solicitation version 2Posted - Download
Section_L_Amendment_0001_0001.pdf
318 KBAdded in Solicitation version 2Posted - Download
Non-Disclosure_Agreement_(NDA_-_Stampede_Penstock_and_Butterfly_Valve_Rehab_0001.pdf
1.5 MBAdded in Solicitation version 2Posted - Download
Sol_140R2026R0006.pdf
281 KBAdded in Solicitation version 1Posted - Download
Past_Performance_Questionnaire.pdf
261 KBAdded in Solicitation version 1Posted - Download
Solicitation_140R2026R00006.pdf
26 MBAdded in Solicitation version 1Posted - Download
General_Decision_Number_CA20260007_Dated_01232026.pdf
155 KBAdded in Solicitation version 1Posted - Download
Release_of_Claims.pdf
133 KBAdded in Solicitation version 1Posted - Download
Offeror_Responsibility_Information.pdf
246 KBAdded in Solicitation version 1Posted - Download
Notice_to_Contractors.pdf
101 KBAdded in Solicitation version 1Posted
Lifecycle
- 2Version 2SolicitationArchived
Z--Stampede Penstock and Butterfly Valve Rehab
- 5Version 5Award NoticeArchivedCurrent
Type changed from Solicitation to Award Notice
Z--Stampede Penstock and Butterfly Valve Rehab
Other notices for this solicitation
- SolicitationRelated noticeMar 30, 2026
Stampede Penstock and Butterfly Valve Rehab
- SolicitationRelated noticeMar 31, 2026
Z--Stampede Penstock and Butterfly Valve Rehab
- SolicitationRelated noticeApr 8, 2026
Z--Stampede Penstock and Butterfly Valve Rehab
- SolicitationRelated noticeApr 28, 2026
Z--Stampede Penstock and Butterfly Valve Rehab
- SolicitationRelated noticeMay 4, 2026
Z--Stampede Penstock and Butterfly Valve Rehab
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Yosemite Valley Sewer Line and Manhole Repairs - Yosemite NP - Mariposa County, CA | - | Awarded | Open |
The purpose of amendment 1 is to provide answers to questions. See attached QA. LAKE25-101-CC LIFT STATION PUMP REPAIR | - | Solicitation | 06/06/2029 |
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS Code: 237110 – Water and Sewer Line and Related Structures Construction (Note: While Other Transaction Authority is not subject to FAR-based small businesIntells regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and construction of a project to restore and modernize the potable water system and wastewater collection system throughout the Fort Hunter Liggett Installation. The scope of work consists of furnishing all necessary design services, equipment, materials, labor, construction management, supervision, quality control, and supplies to deliver a fully functional and modernized potable water and wastewater systems on the Installation. The Fort Hunter Liggett water distribution system dates back to the 1950’s with a few areas believed to be even older and includes a three (3) well configuration that has sufficient pumping capacity to serve current supply demands, however, the water transmission system is undersized to satisfy the demand of the system. While the current water system storage may be sufficient for normal operation, it cannot sustain the system for more than one day in the event of a pump outage and/or fire flow event during maximum day conditions; therefore, additional system storage is necessary. A new Tank Farm with adequate storage capacity (estimated to be a minimum of 2 million gallons) to be determined and validated in accordance with NSPC, UFC, and NFPA criteria, should be in vicinity of security fence gate 10 (Lat: 35.997638° , Long: -121.224355°). Currently the primary storage tank for the potable water system is on the opposite side of the cantonment from the wells and the transmission main and distribution are combined causing significant pressure variations far in excess of industry standard, causing accelerated deterioration of system components. Many pipelines, valves, and hydrants within the distribution system have currently exceeded their useful life expectancy and have failed or failing. High operating pressures place additional strain on this aging system, requiring operational improvements as well as rehabilitation/replacement of existing assets. Modernizing SCADA components are necessary to increase efficiency and updated to cover any system revisions and future improvements. SCADA infrastructure improvements shall integrate into the existing SCADA infrastructure. Fort Hunter Liggett’s wastewater collection system was installed around the same time as the water potable system. Due to the age of the system and deterioration, replacement and rehabilitation of sanitary sewer lines, manholes, and the waste treatment plant lagoon are needed to return the system to be fully functional and code compliant. The wastewater treatment plant relies on a series of lagoons to treat sewage. There are lagoons that have operational deficiencies and require the replacement of the impermeable liner. In addition, the lagoon currently lacks baffles, which are essential for directing the flow of wastewater in a way that maximizes treatment time and prevents "short circuiting". Estimated Acquisition Magnitude: $70-$80M PRIMARY ACQUISITION STRATEGY UNDER EVALUATION: Progressive Design Build (PDB) via Other Transaction Authority (OTA). The Louisville District is evaluating a Progressive Design Build (PDB) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a. This authority authorizes transactions other than standard contracts to carry out facility repair and construction projects – including planning, design, engineering, piloting and execution – enabling early contractor involvement, commercial pricing transparency, and schedule and cost efficiencies. Currently, the Government has advanced a conceptual design for the following potable water system features below. New transmission main to connect the existing well field to the main distribution system within the cantonment area. New storage infrastructure as required to satisfy requirements for fire safety, emergency needs, and operational storage. Upgrades to existing water supply wells to enhance water-supply reliability and redundancy. A Technical Assessment Report of the condition of Fort Hunter Liggett’s utilities systems and modernization recommendations of the water and sanitary sewer systems was completed in June 2024. The onsite assessments used in developing the Technical Assessment Report were conducted November 28-December 7, 2023. Therefore, the Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing PDB utilizing an OT Agreement under the authority of 10 U.S.C. § 2808a. The PDB Course of Action (10 U.S.C. § 2808a): The evaluation process for selection of the most highly qualified design-builder would be qualifications based. A streamlined, two-step Qualifications-Based Selection would occur: Step 1: White Papers/Statement of Qualifications submission. Step 2: Down selected design builders would be invited to Pitch Meetings/Presentations. Most highly qualified firm following pitch meetings would be selected to enter into negotiations. The OT Award would be two phases: Phase 1 (Design & Pre-Construction): The Government team will negotiate the price of Agreement Phase I – Design and Pre-Construction Services with the selected design-builder. work collaboratively to advance the design, conduct open-book cost estimating, and mitigate project risks. Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods INFORMATION REQUESTED Interested parties are requested to respond to the following questions to help shape the final acquisition strategy. Responses shall be made using the link or QR code in the attachment: Company Profile: Q1. Firm Name Q2. Address Q3. Point of Contact (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. CAGE code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Collaborative Delivery Experience: Q10. OTA Experience: Describe your firm's previous experience (if any) executing projects utilizing OTA. Q11. Collaborative Delivery Experience: Describe your experience executing Construction Management at Risk (CM@Risk), Progressive Design Build (PDB), Integrated Design and Construction (IDAC), Early Contractor Involvement (ECI) or other highly collaborative delivery methods. Fort Hunter Liggett Waterline Q12. Describe your experience/expertise with water and wastewater utility construction. Q13. What are the greatest supply chain, scheduling, or technical risks you foresee on a project of this type at Fort Hunter Liggett, and how could the PDB delivery method help mitigate? Feedback on the Acquisition Strategy & Alternatives: Q14. What project characteristics make PDB particularly advantageous or disadvantageous for this requirement? Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would yield a better facility, faster delivery, or lower cost? Q17. Differentiating Evaluation Criteria: To differentiate high-performing collaborative design builders from traditional low-bid general contractors, what evaluation criteria (e.g., past collaborative-delivery, technical approach, key personnel/superintendent experience, trade-partner/subcontractor open-book engagement strategy, or proposed General Conditions fees) should carry the greatest weight in the Government's evaluation? Bonding Capability: Q18. Project Bonding Capacity: Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture. SUBMISSION INSTRUCTIONS Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Intelligence Response Form can be accessed at: https://forms.osi.apps.mil/r/Lmjbdft8rU or via the QR Code provided in the attachment. Please submit your responses by 03 November 2026 at 1:00 PM Eastern Time. The questionnaire is the Government's primary mechanism for obtaining detailed market intelligence and addresses industry capability, experience, technical capabilities, construction considerations, and recommended OTA and commercial practices. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach. | - | Market Research | 11/03/2026 |
Login at https://piee.eb.mil and search for 'N6247322RX011' to obtain more details.* | - | Solicitation | 10/27/2026 |
This Sources Sought Notice is being issued for market research purposes to determine the availability, capability, and interest of small business firms for a potential Government requirement. NO SOLICITATION IS AVAILABLE; requests for the solicitation will go unanswered. No award will be made from this Notice. Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources. The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for Design-Bid-Build (DBB) construction services to conduct Copper Cove Wastewater Treatment Plant (CCWTP) Improvements in collaboration with the Calaveras County Water District (CCWD) in Calaveras County, California (CA). The project is anticipated to include installation of a new continuous backwash filtration system to replace an existing filter system; electrical improvements to include upgrading the existing PG&E service size to the main switchboard located in the Control Building, installing a new transformer, raceways, metering panel, new Motor Control Center (MCC), and associated wiring and components; interconnection with a pre-existing CCWD-installed suspended air floatation (SAF) filter pretreatment system; installation of a new continuous backwash filter system to include excavation, shoring, and backfill for a partially buried cast-in-place concrete tank with three (3) equipped filter cells (modules), air control panel, grating and handrailing over the filter cells and feed channel; inlet and outlet piping, valves, and connection to existing ultraviolet (UV) inlet piping; and power and control tie-ins. The project is also anticipated to include construction of a new masonry compressor building on a concrete slab foundation, housing a duplex air compressor with space for an additional unit, along with appurtenant equipment on the compressed air piping including a refrigerated air dryer, oil-water separator, and air filter; a new wet well and submersible pump station to include a new buried precast wet well with an adjacent valve vault housing a duplex submersible pump station, valves and appurtenances, piping, and power control conduits constructed adjacent to the new SAF to convey filter backwash waste flow to the SAF. Finally, the project is anticipated to include demolition and disposal of the existing adsorption clarifier and mixed media filter equipment, dewatering of sludge handling facility solids in three (3) containerized, polymer-assisted gravity sludge dewatering systems that will be positioned on a concrete pad with containment walls and drainage systems to capture drained water and return it to Pond 6 through three (3) quick coupler hose connection points (one (1) per bin), and all associated yard pipe modifications to connect the new components to the existing WWTP, generally buried in suitable native or engineered backfill at depths of approximately three (3) to ten (10) feet of cover. The potential requirement may result in a firm-fixed-price construction solicitation issued approximately December 2026. If solicited, the Government intends to award the anticipated requirement by approximately March 2027. The Government estimates that construction of the anticipated requirement can be completed within three-hundred-sixty-five (365) calendar days from Contractor receipt of the Notice to Proceed. Work may also be impacted by bird nesting season, which runs from 1 February through 31 August. If market conditions indicate the estimated period of performance may be unrealistic, Respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration when responding to this Sources Sought Notice. The Government currently estimates the target price range for the anticipated project may be between $5,000,000.00 and $10,000,000.00. The North American Industrial Classification System (NAICS) code identified for the anticipated requirement is 237110, Water and Sewer Line and Related Structures Construction. The small business size standard for the NAICS, as established by the U.S. Small Business Administration, is $45,500,000.00 annual revenue. The Product or Service Code (PSC) for the anticipated requirement is Y1PD, Construction of Waste Treatment and Storage Facilities. If there is a reasonable expectation that two (2) or more responsible small business concerns under the NAICS can provide the anticipated services, the Contracting Officer is required to set the acquisition aside for small business concerns. If competition is set-aside for competition limited to small businesses, Federal Acquisition Regulation (FAR) 52.219-14, Limitations on Subcontracting (Deviation), requires that construction small business Contractors self-perform at least twenty-five percent (25%) of the cost of the contract, excluding the cost of materials. If no set aside is made, the requirement is competed with full and open competition, and the awarded Contractor is not a small business, the Contractor may be required to self-perform a percentage of work if required in the solicitation. Contractors with the skill, capabilities, workload capacity, and ability to obtain bonding to complete the project described above (either through self-performance and/or Subcontractor management) are invited to provide capability statements to the primary point of contact listed below. Other than small businesses are also encouraged to submit Capability Statements. CAPABILITY STATEMENT: Responses must be limited to ten (10) 8.5 x 11 inch pages with a minimum font size of point 10. Please provide the following information: 1) Company name, System for Award Management (SAM) Unique Entity Identification (UEID) number or Employer Identification Number (EIN), address, point of contact name, contact phone number, contact e-mail address, and statement identifying whether the company employs union or non-union workers. 2) Experience and capability to complete contracts of similar magnitude and complexity to the potential requirement, including at least three (3) examples of comparable work performed within the past six (6) years. Each example should include a brief description of the project, description of the work performed (identification of self-performance and/or Subcontractor management), customer name, customer satisfaction, timeliness of performance, dollar value of the project, and whether there were any challenges experienced during the project (delays, investigations, health and safety issues, labor shortages, management / organizational issues, etc.). 3) Business size and socioeconomic type for the applicable NAICS (ex: Woman-Owned Small Business, Serviced-Disabled Veteran-Owned Small Business (SDVOSB), Veteran-Owned Small Business (VOSB), certified Historically Underutilized Business Zone (HUBZone), 8(a) Participant, small business, or other than small business (large business)). 4) Bonding capability (in the form of a Surety letter). Please submit all capabilities statements, information, brochures, and/or marketing material as one (1) document, limited to the page quantity above. Responses will not be considered an offer, proposal, or bid for any solicitation that may result from this Notice. Moreover, responses will not restrict the Government to an acquisition approach. This Notice is for information and planning purposes only. Respondents will not be notified of the results of any review conducted or the capability statements received. Please provide responses and/or questions by e-mail to the Contract Specialist, Costa Laliotitis, at (Constantinos.Laliotitis@usace.army.mil) by 0800 / 8:00 a.m. Pacific Time on Monday, 7 December 2026. Please include the Sources Sought Notice number W9123827X1CHG in the e-mail subject line. | - | Market Research | 12/07/2026 |
Additional Details
Solicitation Number
140R2026R0006
Archive Date
Oct 7, 2026
Office Address
SACRAMENTO, CA, 95825