Notice ID: 93f55fa1f1d34e33829028ce13b9af84JustificationAwardedArchived
J--YAO Building HVAC Control System Upgrades
Awarded on May 29, 2026. Full description on SAM.gov.
Overview
- Posted
- June 3, 2026
- Notice type
- Justification
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of the InteriorBUREAU OF RECLAMATION
Notice details
- Office
- LOWER COLORADO REGIONAL OFFICE
- Last updated
- Oct 30, 2026
- First published
- Last updated on SAM.gov
- Award date
- May 29, 2026
- Award amount (SAM.gov award notice)
- Not specified
Identifiers
- Solicitation number
- 140R3026Q0082
- Notice ID
- 93f55fa1f1d34e33829028ce13b9af84
Description
YAO Building HVAC Control System Upgrades
Award Overview
Award Number
GS07F190CA
Award Amount (SAM.gov award notice)
Not specified
Award Date
May 29, 2026
Awardee
Not specified
Delivery Order Number
140R3026F0036
Original Solicitation
Notice ID: 93f55fa1f1d34e33829028ce13b9af84
Posted Date: Jun 3, 2026
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Task Orders Under This IDV
Top 10 by total obligated
- 75D30121F10917JOHNSON CONTROLS BUILDING SOLUTIONS, LLCDepartment of Health and Human ServicesNAICS 334290$15.7MSigned Jun 9, 2026
- 75D30121F10917JOHNSON CONTROLS BUILDING SOLUTIONS, LLCDepartment of Health and Human ServicesNAICS 334290$15.7MSigned Jul 27, 2026
- $15.6MSigned May 31, 2025
- $15.6MSigned Aug 20, 2024
- $15.5MSigned Sep 11, 2023
- $13.4MSigned Jun 15, 2023
- $13.4MSigned Aug 12, 2022
- $9.9MSigned Jun 2, 2026
- $9.9MSigned Feb 13, 2026
- $9.9MSigned Feb 17, 2026
More From This Vendor
Top 5 most recent
- $160.9KSigned Sep 1, 2026
- $146.7KSigned Aug 20, 2026
- $487.51Signed Jul 8, 2026
- $2.4MSigned Jun 30, 2026
- $489.37Signed May 14, 2026
Contacts
Contracting Officer
Primary Contact
Documents
Files (1)
- Download
140R3026Q0082_WBR-1408_405_Limited-Sources-J-and-A_FAR_8_Redacted_1.pdf
253 KBAdded in Justification version 3Posted
Lifecycle
- 3Version 3JustificationArchivedCurrent
J--YAO Building HVAC Control System Upgrades
Other notices for this solicitation
- AwardedRelated noticeMay 29, 2026
J--YAO Building HVAC Control System Upgrades
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Construct and install two maintenance pads to house all condensing units and provide single line as built drawings, install a two sided screen block at the front of the building matching the existing CMU block color and style, use solid and vented CMU blocks to ensure sufficient airflow around all condensing units, and build screen block walls two rows higher than the condensing units; the contractor shall supply a weatherproof 120V maintenance receptacle for each pad, core drill the existing wall of Building 119, install a 3 inch PVC pipe sealed with acoustical seal to maintain ICD 705 compliance per Tech Spec 1.5.1, install insulation on all line sets entering Building 119, run all electrical from Room 119s electrical mechanical room using panel EDH 1 3 rated at 480/277V and 800 amps, tie all new HVAC systems to the existing generator for backup power, surface mount electrical conduits in Room 119 and the exterior HVAC yard, run conduits underground to each maintenance pad, and supply a weatherproof disconnect for each condensing unit; the contractor shall install new cassette type HVAC systems in Rooms 112, 113, 114, and 132 using the existing suspended ceiling grid with added support, provide a 1 ton HVAC system with a separate controller for Room 112, provide 2 ton HVAC systems with separate controllers for Rooms 113 and 114, and provide a 4 ton HVAC system with a separate controller for Room 132; all design and construction shall comply with the current International Building Code, UFC standards, all applicable public laws, executive orders, CFR requirements, DOD instructions and directives, Nellis ID2 standards, and Clark County, Nevada, and federal codes and laws, and any discrepancies between codes or standards and contract documents shall be immediately reported to the Contracting Officer, with the more stringent requirement applying unless otherwise directed. 26 WPS request this HVAC installation and testing be accomplish within, 160 days, period of performance. Proposals will be evaluated using lowest price, technically acceptable. A site visit will take place on 8/4/2026 at 0830 AM PDT, meeting in front of building 119 main entrance. Please ensure your base pass request has been submitted to me by 2PM PDT on 7/24/2026 if you do not have base access to Nellis AFB to ensure you have access by the date of the site visit. Proposals are due by 8/18/2026 at 2:00 PDT. Answers will be provided via a solicitation amendment. | - | Solicitation | 08/20/2026 |
MO - MINGO NATIONAL WILDLIFE REFUGE - Building Automation System Monitoring Reimbursement | - | Awarded | Open |
OR-BANDON MARSH NWR-BANDON HVAC | - | Awarded | Open |
Amendment three - HVAC Replacement - MI | - | Combined Synopsis | 12/02/2026 |
WY-JACKSON NFH-GEOTHERMAL HVAC RPLCMNT | - | Awarded | Open |
Additional Details
Solicitation Number
140R3026Q0082
Archive Date
Jul 3, 2026
Office Address
BOULDER CITY, NV, 89005