Notice ID: 96bc2c759db2455f9d3c81d3fc2e09a8Award NoticeAwarded
7B--SCADA DC & App Servers for Hoover Dam
Awarded on September 9, 2026. Award Notice posted by INTERIOR, DEPARTMENT OF THE (BUREAU OF RECLAMATION) on September 9, 2026. Solicitation 140R3026Q0122.
NAICS 334111 (Electronic Computer Manufacturing). Full description on SAM.gov.
Awarded tounder NNG15SC05B (source: SAM.gov award notice)• $69.6K
Description
SCADA DC & App Servers for Hoover Dam
Overview
Agency:
Department of the InteriorBUREAU OF RECLAMATION
Office:LOWER COLORADO REGIONAL OFFICE
Posted:September 9, 2026
NAICS:334111: Electronic Computer Manufacturing
Last Updated:Oct 6, 2026
PSC:7B22: IT AND TELECOM - COMPUTE: SERVERS (HARDWARE AND PERPETUAL LICENSE SOFTWARE)
Response Deadline:
Not specified
Set-Aside:Not specified
Type:Award Notice
Place of Performance:Not specified
Award Date:Sep 9, 2026
Award Amount (SAM.gov award notice):$69.6K
Award Overview
Award Number
NNG15SC05B
Award Amount (SAM.gov award notice)
$69.6K
Award Date
Sep 9, 2026
Awardee
Awardee UEI
CN4KSKX2UQY5
Awardee CAGE Code
0J699
Original Solicitation
Notice ID: 96bc2c759db2455f9d3c81d3fc2e09a8
Posted Date: Sep 9, 2026
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
140R3026Q0122- Awarded
This opportunity has been awarded.
- AwardedCurrentSep 9, 2026
7B--SCADA DC & App Servers for Hoover Dam
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Forensic Workstation & Laptops for OJS PCU | Sole Source / J&A | 334111 | No Set-Aside | 09/23/2026 | Open | - | |
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||X|ISO 9001 OR HIGHER||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD||TBD|TBD|TBD|TBD|TBD|TBD||||||||| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Robyn Grinarml| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10||||||||||| FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (DEV 2026-O0042)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||| This solicitation is being issued under Emergency Acquisition Flexibilities (EAF) Authority formally known as Special Emergency Procurement Authority (SEPA). THIS IS A CRITICAL APPLICATION ITEM (CAI). Please email copy of quote/proposal to kenneth.lauber@dla.mil Drawings are not available. ALL PAR (POST AWARD REQUESTS) MUST BE SUBMITTED THROUGH THE NAVSUP WSS VENDOR PORTAL. PLEASE SEE CLAUSE WSSTERMHZ17 FOR DETAILED INSTRUCTIONS. PROCEDURES FOR CONTRACTORS TO REQUEST ACCESS TO WORKFLOW PRO (WFP) MOD ASSIST Please use the following address to open the NAVSUP WSS Workflow Pro (WFP) Mod Assist Vendor page: https://mynavsup.nag.navy.mil/apps/ops$workflow_pro.home To request an account, navigate to the bottom of the page and click Request Account. Fill in the information to create the user profile, you must select Robyn Grinarml as the POC from the drop-down menu. Select Privacy Act Agreement; after reading the statement, click Agree. When all data has been entered on the form, click the blue Submit button. Notification will be sent when the account is established. Should the Contractor experience concerns with the use of Mod Assist, the Contractor must contact Robyn Grinarml, robyn.grinarml@dla.mil \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;3429AS6920; drawing number ( ;(30003); ) ;REVSION NONE; , Revision ;NAWC LAKEHURST; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=NAWCADLKE-MISC-482300-0480 |30003| D| |D| | | | DRAWING DATA=NAWCADLKE-MISC-482300-0546 |30003| -| |D| | | | DRAWING DATA=3429AS4108 |30003| C| |D| | | | DRAWING DATA=3429AS4900 |30003| D| |D| | | | DRAWING DATA=3429AS4914 |30003| C| |D| | | | DRAWING DATA=3429AS4918 |30003| C| |D| | | | DRAWING DATA=3429AS4960 |30003| A| |D| | | | DRAWING DATA=3429AS4961 |30003| B| |D| | | | DRAWING DATA=3429AS6920 |30003| -| |D| | | | DRAWING DATA=3429AS6924 |30003| -| |D| | | | DRAWING DATA=3429AS6926 |30003| -| |D| | | | DRAWING DATA=3429AS6927 |30003| -| |D| | | | DRAWING DATA=3429AS6928 |30003| -| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS 1.The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4 d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as de-fined by ANSI Z1.4. 2. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications. Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing "Requirements" paragraph above and satisfactorily demonstrating100% conformance to the test and evaluation elements cited in the First Article Testing "Testing and evaluation" paragraph above shall constitute acceptance of the First Article: ii. Failure to meet any of the conditions in the First Article Testing "Requirements" paragraph above or the First Article Testing "Testing and evaluation" paragraph above shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's. 3.Production Lot Special Tests: N/A 4.N/A 5.N/A 4.1 Review documentation as provided under DD 1423 requirements. 4.2 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.2.1 Dimensional test (special) ;APPLIES; 4.2.2 Requirements of: ;NAWC LAKEHURST; 4.2.3 Form ;APPLIES; 4.2.4 Fit ;N/A; 4.2.5 Function ;N/A; 4.2.6 Compliance with drawing ( ;(30003); ) ;3429AS6920; , Revision ;REVISION NONE; and specifications referenced therein. 4.3 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.4 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.5 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.5.1 The QAR shall be present to witness all First Article Testing. 4.5.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR; 4.6 Disposition of FAT samples 4.6.1 ; ; Sample(s) may be destroyed during testing. 4.6.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.7 Test Sample Coating Instructions 4.7.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.8 Notice to Government of Testing at the contractors facility. 4.8.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;(30003); ; ), Part Number ;3429AS6920-1; ; , Revision ;REVISION NONE; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;P.C.O; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.10 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;DCMA QAR; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.11 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;DCMA QAR; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10143): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked "INSPECTION/CERTIFICATION DATA INCLUDED". Data Requirements: a. Copies of all approved requests for variations. b. Material properties per Drawing 3429AS6920. c. Identification, including photos of all identifiers on the part, per Drawing 3429AS6920, 3429AS4108, 3429AS4900, 3429AS4918, 3429AS4960, 3429AS4961, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. d. Assembly/installation per Drawing 3429AS6920, 3429AS4900, 3429AS4914, 3429AS4960, 3429AS4961. e. Software installation per Drawing 3429AS6920. f. Testing per Drawing 3429AS6920. g. Dimensional inspection per Drawing 3429AS6920, 3429AS4961. h. Handling and storage per Drawing 3429AS4918. i. Environmental requirements per Drawing 3429AS4918. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection Data Requirements a. Copies of all approved requests for variations. b. Material properties per Drawing 3429AS6920. c. Identification, including photos of all identifiers on the part, per Drawing 3429AS6920, 3429AS4108, 3429AS4900, 3429AS4918, 3429AS4960, 3429AS4961, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. d. Assembly/installation per Drawing 3429AS6920, 3429AS4900, 3429AS4914, 3429AS4960, 3429AS4961. e. Software installation per Drawing 3429AS6920. f. Testing per Drawing 3429AS6920. g. Dimensional inspection per Drawing 3429AS6920, 3429AS4961. h. Handling and storage per Drawing 3429AS4918. i. Environmental requirements per Drawing 3429AS4918. j. Plating per Drawing 3429AS4918. | Solicitation | 334111 | No Set-Aside | 10/09/2026 | 10/19/2026 | - | |
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||X|ISO 9001 OR HIGHER||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD||TBD|TBD|TBD|TBD|TBD|TBD||||||||| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Robyn Grinarml| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| This solicitation is being issued under Emergency Acquisition Flexibilities (EAF) Authority formally known as Special Emergency Procurement Authority (SEPA). Please email copy of quote/proposal to kenneth.lauber@dla.mil Drawings are not available. ALL PAR (POST AWARD REQUESTS) MUST BE SUBMITTED THROUGH THE NAVSUP WSS VENDOR PORTAL. PLEASE SEE CLAUSE WSSTERMHZ17 FOR DETAILED INSTRUCTIONS. PROCEDURES FOR CONTRACTORS TO REQUEST ACCESS TO WORKFLOW PRO (WFP) MOD ASSIST Please use the following address to open the NAVSUP WSS Workflow Pro (WFP) Mod Assist Vendor page: https://mynavsup.nag.navy.mil/apps/ops$workflow_pro.home To request an account, navigate to the bottom of the page and click Request Account. Fill in the information to create the user profile, you must select Robyn Grinarml as the POC from the drop-down menu. Select Privacy Act Agreement; after reading the statement, click Agree. When all data has been entered on the form, click the blue Submit button. Notification will be sent when the account is established. Should the Contractor experience concerns with the use of Mod Assist, the Contractor must contact Robyn Grinarml, robyn.grinarml@dla.mil \ | Solicitation | 334111 | No Set-Aside | 10/09/2026 | 10/19/2026 | - | |
CONTACT INFORMATION|4|N762.34|T8X|771-229-0399|christopher.campellone.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving report combo type|N/A|TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: 60 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of 0 per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. THIS SOLICITATION IS FOR THE REPAIR OF: COMPUTER SYSTEM,DIG NIIN: 016480392 PN: NCA7-3-53333 QUANTITY: (2) EA PLEASE SUBMIT QUOTE VIA EMAIL TO christopher.campellone.civ@us.navy.mil BY THE DUE DATE SPECIFIED ON PAGE 1, BLOCK 10. IF A FIRM FIXED. PRICE (FFP) CANNOT BE DETERMINED, PLEASE INFORM THE PCO. THESE ITEMS REQUIRE GOVERNMENT SOURCE APPROVAL PRIOR TO AWARD. IF YOU ARE NOT AN APPROVED SOURCE, YOU MUST SUBMIT, TOGETHER WITH YOUR PROPOSAL, THE INFORMATION DETAILED IN THE NAVSUP WSS SOURCE APPROVAL BROCHURE WHICH CAN BE OBTAINED ONLINE AT https://www.navsup.navy.mil/public/navsup/wss/business_opps/ UNDER "COMMODITIES." OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE CONSIDERED FOR AWARD UNDER THIS SOLICITATION. PLEASE NOTE, IF EVALUATION OF A SOURCE APPROVAL REQUEST SUBMITTED HEREUNDER CANNOT BE PROCESSED IN TIME AND / OR APPROVAL REQUIREMENTS PRECLUDE THE ABILITY TO OBTAIN SUBJECT ITEMS IN TIME TO MEET GOVERNMENT REQUIREMENTS, AWARD OF REQUIREMENT MAY BE CONTINUED BASED ON FLEET SUPPORT NEEDS. EARLY AND INCREMENTAL DELIVERIES ARE ACCEPTED AND PREFERRED. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: COMPUTER SYSTEM,DIG ;7010016480392; NSN , ;nca7-3-53333; Part Number, Shall be performed IAW: COMPUTER SYSTEM,DIG ;latest; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: COMPUTER SYSTEM,DIG ;nca7-3-53333; P/N, ;7010016480392; NSN, ;latest; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. COMPUTER SYSTEM,DIG ;hexagon mfg intelligence inc.; Company Name , ;250 circuit dr, north kingstown, ri 02852-7441; Address , ;1wuk4; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE | Solicitation | 334111 | No Set-Aside | 10/01/2026 | 11/02/2026 | - | |
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||x|AS/EN/JISQ 9100 or equivalent||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|Invoice 2in1|TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD|TBD|TBD|TBD|||||| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ROBYN.GRINARML@DLA.MIL | VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|45 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|1|LOT 0001|14|360 days or sooner|DLA Weapons Support Philadelphia kaileigh.blaker@dla.mil|TBD|0001|30||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||X| As applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference. THIS SOLICITATION IS BEING ISSUED UNDER EMERGENCY ACQUISITION FLEXIBILITIES AUTHORITY; Synopsis is waived based on urgency (FAR 5.202(a)(2)). All potential offers shall provide newly manufactured spares only. Refurbished, remanufactured, or repaired material will not be acceptable;Offers for such are ineligible for award. Drawings are not available for this request for quotation. Offerors are advised that offers received from sources which are not government-approved sources of supply will be deemed technically unacceptable, and therefore ineligible for award. Any distributors of approved source(s) MUST submit a copy of their authorized distributor letter, on the source's letterhead, to the buyer point of contact indicated on the solicitation via email, at time of proposal submittal. Any clauses that do not apply are hereby self deleting. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;3429AS6923; drawing number ( ;(30003); ) ;Rev. None; , Revision ;NAWC LAKEHURST; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=NAWCADLKE-MISC-482300-0480 |30003| D| |D| | | | DRAWING DATA=NAWCADLKE-MISC-482300-0546 |30003| -| |D| | | | DRAWING DATA=3429AS4108 |30003| C| |D| | | | DRAWING DATA=3429AS4900 |30003| D| |D| | | | DRAWING DATA=3429AS4914 |30003| C| |D| | | | DRAWING DATA=3429AS4918 |30003| C| |D| | | | DRAWING DATA=3429AS6920 |30003| -| |D| | | | DRAWING DATA=3429AS6922 |30003| -| |D| | | | DRAWING DATA=3429AS6923 |30003| -| |C| | | | DRAWING DATA=3429AS6924 |30003| -| |D| | | | DRAWING DATA=3429AS6926 |30003| -| |D| | | | DRAWING DATA=3429AS6927 |30003| -| |D| | | | DRAWING DATA=3429AS6928 |30003| -| |D| | | | DRAWING DATA=3429AS6929 |30003| -| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS 1. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4. d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4. 2. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications. Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing "Requirements" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing "Testing and evaluation" paragraph above shall constitute acceptance of the First Article; ii. Failure to meet any of the conditions in the First Article Testing "Requirements" paragraph above or the First Article Testing "Testing and evaluation" paragraph above shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's. 3. Production Lot Special Tests: N/A 4. N/A 5. N/A 4.1 Review documentation as provided under DD 1423 requirements. 4.2 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.2.1 Dimensional test (special) ;APPLIES; 4.2.2 Requirements of: ;NAWC LAKEHURST; 4.2.3 Form ;APPLIES; 4.2.4 Fit ;N/A; 4.2.5 Function ;N/A; 4.2.6 Compliance with drawing ( ;(30003); ) ;3429AS6923; , Revision ;REVISION NONE; and specifications referenced therein. 4.3 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.4 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.5 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.5.1 The QAR shall be present to witness all First Article Testing. 4.5.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR; 4.6 Disposition of FAT samples 4.6.1 ; ; Sample(s) may be destroyed during testing. 4.6.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.7 Test Sample Coating Instructions 4.7.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.8 Notice to Government of Testing at the contractors facility. 4.8.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;(30003); ; ), Part Number ;3429AS6923-1; ; , Revision ;REVISON NONE; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;P.C.O; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10146): REPAIR TDR (26-10052) THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUESTAS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS; DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked "INSPECTION/CERTIFICATION DATA INCLUDED". Data Requirements: a. Copies of all approved requests for variations. b. Identification, including photos of all identifiers on the part, per Drawing 3429AS6923, 3429AS4108, 3429AS4900, 3429AS4918, 3426AS6920, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928, 3429AS6929. c. Assembly/installation per Drawing 3429AS6923, 3429AS4900, 3429AS4914, 3426AS6920, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928, 3429AS6929. d. Cleaning per Drawing 3429AS6923, 3426AS6920. e. Testing per Drawing 3429AS6923, 3426AS6920. f. Dimensional inspection per Drawing 3429AS6923, 3426AS6920, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. g. Handling and storage per Drawing 3429AS4918. h. Environmental requirements per Drawing 3429AS4918. i. Electrical requirements per Drawing 3429AS4918. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS; DATE OF FIRST SUBMISSION: Concurrently with Final Inspection Data Requirements a. Copies of all approved requests for variations. b. Identification, including photos of all identifiers on the part, per Drawing 3429AS6923, 3429AS4108, 3429AS4900, 3429AS4918, 3426AS6920, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928, 3429AS6929. c. Assembly/installation per Drawing 3429AS6923, 3429AS4900, 3429AS4914, 3426AS6920, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928, 3429AS6929. d. Cleaning per Drawing 3429AS6923, 3426AS6920. e. Testing per Drawing 3429AS6923, 3426AS6920. f. Dimensional inspection per Drawing 3429AS6923, 3426AS6920, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. g. Handling and storage per Drawing 3429AS4918. h. Environmental requirements per Drawing 3429AS4918. i. Electrical requirements per Drawing 3429AS4918. j. Plating per Drawing 3429AS4918. | Solicitation | 334111 | No Set-Aside | 09/29/2026 | 10/26/2026 | - |
Additional Details
Solicitation Number
140R3026Q0122
Archive Date
Sep 24, 2026
Office Address
BOULDER CITY, NV, 89005