Notice ID: ffd082e654714a1db66428643f574045JustificationAwarded
R--SLV-CB HYDRO DATA COLLECTION
Awarded on September 19, 2023. Full description on SAM.gov.
Overview
- Posted
- September 21, 2023
- Notice type
- Justification
- NAICS
- 541690: Other Scientific and Technical Consulting Services
- Agency
- Department of the InteriorBUREAU OF RECLAMATION
Notice details
- Office
- UPPER COLORADO REGIONAL OFFICE
- Last updated
- Sep 9, 2025
- Award date
- Sep 19, 2023
- Award amount (SAM.gov award notice)
- Not specified
Identifiers
- Solicitation number
- 140R4023Q0062
- Notice ID
- ffd082e654714a1db66428643f574045
Description
SLV-CB HYDRO DATA COLLECTION
Award Overview
Award Number
140R4023P0076
Award Amount (SAM.gov award notice)
Not specified
Award Date
Sep 19, 2023
Awardee
Not specified
Original Solicitation
Notice ID: ffd082e654714a1db66428643f574045
Posted Date: Sep 21, 2023
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
140R4023Q0062- Solicitation
- Awarded
This opportunity has been awarded.
- Special NoticeJun 27, 2023
R--SLV-CB HYDRO-DATA COLLECTION
- SolicitationSep 1, 2023
SLV-CB HYDRO-DATA COLLECTION
- AwardedSep 19, 2023
R--SLV-CB HYDRO DATA COLLECTION
- Sole Source / J&ACurrentSep 21, 2023
R--SLV-CB HYDRO DATA COLLECTION
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The requirement outlines contractor service support for one upcoming flight test. The test durationwill be three days, and a representative will be required to assist with test planning. The contractoris responsible for the refurbishment of three (3) existing UGVs and six (6) trailers, along with thetransport of UGVs, trailers, and support equipment to operate the vehicles/trailers. All vehicles andtrailers must be built laser safe and able to operate in remote/austere environments. At thecompletion of the test, contractor personnel will be responsible for the removal of all UGV, trailers,and debris from the test range. Additional requirements include the ability of the UGVs and trailersto operate on a dirt runway (smooth unimproved surface) and must be able to maneuver 90 degreeturns and rapidly accelerate and decelerate. Trailers and UGVs must have mounting positions forGo Pro Cameras (cameras are owned/operated by the test center) and easily replaceable materialon the top and sides of the trailers. UGV may be four-wheel drive (preferred) or front wheel drive.The contractor is responsible for providing all personnel (including a mechanic), services, facilities,and materials to accomplish the effort. | - | Awarded | Open |
MRG RGSM SPAWNING AND EGG MONITORING | - | Pre-Solicitation | Open |
The requirement outlines contractor service support for one upcoming flight test. The test durationwill be three days, and a representative will be required to assist with test planning. The contractoris responsible for the refurbishment of three (3) existing UGVs and six (6) trailers, along with thetransport of UGVs, trailers, and support equipment to operate the vehicles/trailers. All vehicles andtrailers must be built laser safe and able to operate in remote/austere environments. At thecompletion of the test, contractor personnel will be responsible for the removal of all UGV, trailers,and debris from the test range. Additional requirements include the ability of the UGVs and trailersto operate on a dirt runway (smooth unimproved surface) and must be able to maneuver 90 degreeturns and rapidly accelerate and decelerate. Trailers and UGVs must have mounting positions forGo Pro Cameras (cameras are owned/operated by the test center) and easily replaceable materialon the top and sides of the trailers. UGV may be four-wheel drive (preferred) or front wheel drive.The contractor is responsible for providing all personnel (including a mechanic), services, facilities,and materials to accomplish the effort. | - | Solicitation | 04/30/2026 |
The requirement outlines contractor service support for one upcoming flight test. The test durationwill be three days, and a representative will be required to assist with test planning. The contractoris responsible for the refurbishment of three (3) existing UGVs and six (6) trailers, along with thetransport of UGVs, trailers, and support equipment to operate the vehicles/trailers. All vehicles andtrailers must be built laser safe and able to operate in remote/austere environments. At thecompletion of the test, contractor personnel will be responsible for the removal of all UGV, trailers,and debris from the test range. Additional requirements include the ability of the UGVs and trailersto operate on a dirt runway (smooth unimproved surface) and must be able to maneuver 90 degreeturns and rapidly accelerate and decelerate. Trailers and UGVs must have mounting positions forGo Pro Cameras (cameras are owned/operated by the test center) and easily replaceable materialon the top and sides of the trailers. UGV may be four-wheel drive (preferred) or front wheel drive.The contractor is responsible for providing all personnel (including a mechanic), services, facilities,and materials to accomplish the effort. | - | Pre-Solicitation | 03/04/2026 |
INJECTION WELL FAILURE MODE EVALUATION | - | Solicitation | 11/13/2026 |
Additional Details
Solicitation Number
140R4023Q0062
Archive Date
Oct 21, 2023
Office Address
SALT LAKE CITY, UT, 84138