GovChime
Notice ID: 1e0e535d26ff42f6b0ea2359cecfeaf7Sources SoughtArchived

Y--Glen Canyon Powerplant and Lake Powell Switchyard

Archived on May 16, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM MDT
Posted
March 31, 2026
Notice type
Sources Sought
Agency
Department of the InteriorBUREAU OF RECLAMATION

Notice details

Office
UPPER COLORADO REGIONAL OFFICE
Last updated
Nov 1, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
140R4026R0015
Notice ID
1e0e535d26ff42f6b0ea2359cecfeaf7

Description

Department of the Interior
Bureau of Reclamation – Upper Colorado Region
Glen Canyon Powerplant and Lake Powell Switchyard

NOTICE TYPE: Sources Sought (Market Research)

NAICS: 237130 – Power and Communication Line and Related Structures Construction

PSC: Y1MD Construction of Electrical Installations and Power Plants

1. NOTICE DESCRIPTION

This Sources Sought announcement is issued solely for market research and planning purposes in accordance with FAR Part 10.

This is NOT a solicitation, request for proposal, bid, or quote.
No contract will be awarded from this notice. No reimbursement will be provided for costs associated with responding.

Information received will be used to enhance acquisition planning for a future competitive requirement under FAR Parts 15 and 36.

2. PROJECT LOCATION

Glen Canyon Powerplant and Lake Powell Switchyard
Glen Canyon Dam
Coconino County, Arizona (approx. 2 miles northwest of Page, AZ)

3. PROJECT OVERVIEW

The Bureau of Reclamation anticipates a construction requirement to furnish and install three (3) outdoor, three-phase station service transformers and perform associated electrical, protection, and structural work.

4. PRINCIPAL COMPONENTS OF WORK

A. Transformer Removal and Replacement

Removal and disposal of two (2) existing station service transformers.

Furnishing, installing, and commissioning three (3) new transformers:

Two (2) transformers:
• 3phase outdoor stepdown
• 3.75/4.687 MVA (KxAN/KxAF), 55°C rise
• 60 Hz
• High side: 13.8 kV, 150 kV BIL
• Low side: 4.16 kV, 75 kV BIL
• 6.5% impedance on 3.75 MVA
• Tap changer: ±2.5%, 5%
• Insulating fluid: Natural ester

One (1) transformer:
• 3phase outdoor stepdown
• 3.75/4.687 MVA (KxAN/KxAF), 55°C rise
• 60 Hz
• High side: 25 kV, 150 kV BIL
• Low side: 4.16 kV, 75 kV BIL
• 6.5% impedance on 3.75 MVA
• Tap changer: ±2.5%, 5%
• Insulating fluid: Natural ester

B. Additional Electrical & Structural Modifications

• Install new neutral grounding resistors.
• Remove/replace nonsegregated bus on lowside of two transformers.
• Modify highside isolatedphase bus.
• Furnish and install one (1) interrupter switch.
• Remove two (2) existing transformer protection relays; install three (3) new relays.
• Install six (6) current transformers.
• Remove existing concrete containment; install three (3) new containment systems.
• Remove/install 5 kV cable through powerplant.
• Remove/install approx. 2,000 LF of 25 kV armored cable via tunnel and underground conduit.
• Install three (3) singlepole fused disconnect switches.
• Remove and replace three (3) surge arresters.


5. ESTIMATED MAGNITUDE OF CONSTRUCTION
Between $10,000,000 and $25,000,000

6. ANTICIPATED PERIOD OF PERFORMANCE
• Period of Performance: TBD
• Anticipated Contract Award: 2nd Quarter FY 2027

7. SUBMISSION REQUIREMENTS

Interested and capable firms are requested to submit the following:

Company Information
• Name, physical address, UEI, points of contact, phone, and email.

Business Size & SBA Program Status under NAICS 237130 and 335311
• Indicate Small Business, HUBZone, 8(a), SDVOSB, WOSB, SDB, or Large Business.
• SBA certification must be verifiable in SAM.gov.

Capabilities Statement
• Demonstrate relevant experience and capability to perform all required work.

Transformer Manufacturer Information
• Manufacturer name and country of origin.
• Documentation supporting compliance with FAR 52.2255 (Trade Agreements) and/or 52.22511 (Buy American – Construction Materials).

Estimated Transformer Lead Time
• Assume NTP = January 25, 2027 for market research purposes.

Market Conditions & Economic Price Adjustment Input
• Brief statement on anticipated supply chain volatility and whether an EPA clause is advisable.

Transformer Pricing Indices Used
• Identify indices commonly applied for transformers with these characteristics.

Bonding Capacity
• Provide aggregate and single project bonding limits.

8. RESPONSE DELIVERY
Email responses only to:
Lisa Laughbon
Contracting Officer
Email: lisa_laughbon@ios.doi.gov

Response Deadline: COB 5/1/2026

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Laughbon, Lisa
Fax: 4062477338

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    Y--Glen Canyon Powerplant and Lake Powell Switchyard

    Notice 1e0e535d26ff42f6b0ea2359cecfeaf7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

140R4026R0015

Archive Date

May 16, 2026

Office Address

SALT LAKE CITY, UT, 84138