GovChime

P283 Electrical Infrastructure, On-Site Generation, and Microgrid Improvements at Marine Corps Air Station Miramar, San Diego, California

Overview

Response deadline
2:00 PM EDT
Posted
September 15, 2026
Notice type
Sources Sought
NAICS
237130: Power and Communication Line and Related Structures Construction
Agency
Department of WarDepartment of the Navy

Notice details

Office
NAVFAC.NAVFAC PACIFIC CMD.NAVFAC SOUTHWEST SW.NAVFACSYSCOM SOUTHWEST
Place of performance
San Diego, California, 92126
Last updated
Oct 29, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
N6247327R0006
Notice ID
f1bcdae42ac24608a298cb574d001b71

Description

This project will provide designs, procurements, constructions, testing, and commissioning of Microgrid Control System (MCS), Utility Control System (UCS), Risk Management Framework (RMF) / Cybersecurity, Building Generator Optimization & Interconnection, Battery Energy Storage System (BESS), Modernize / Automate Sulphur Hexafluoride (SF6) Power Switches, Expanded Solar Photovoltaic Voltage (PV) System, Fiber Optic Infrastructure, and 12 kilovolt (kV) Electrical Distribution System at MCAS Miramar.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (2)

  • P283 Source Sought Notice.pdf

    179 KBAdded in Sources Sought version 1Posted
    Download
  • P283_SSN_Market Research Questionnaire.xlsx

    90 KBAdded in Sources Sought version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Sources SoughtCurrent

    P283 Electrical Infrastructure, On-Site Generation, and Microgrid Improvements at Marine Corps Air Station Miramar, San Diego, California

    Notice f1bcdae42ac24608a298cb574d001b71 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
AMENDMENT 0017, issued on 2/12/26, requests FPRs from Phase Two Offerors ONLY. AMENDMENT 0016, issued on 2/12/26, Closes Discussions. AMENDMENT 0014, issued on 1/26/26, Opens Discussions with Phase Two Offerors ONLY. Please note that Phase Two is only open to Offerors who successfully qualified during Phase One of the subject solicitation. This acquisition will result in an unrestricted full and open Firm-Fixed-Price (FFP) Design-Build (DB) contract for the design and construction of Design-Build (DB) P-1241 Low Altitude Radio Communication System (LARCS) Communication Towers for Marine Air Ground Task Force Training Command (MAGTFTC) Twentynine Palms, California. The project scope constructs new communication towers and restores and modernizes existing communication towers on remote mountaintops or hilltops. With the exception of Bearmat Hill, work sites are only accessible by helicopter and are without any utilities such as electricity, water, and sewer. The contractor shall provide necessary utilities to the site as required. The project will require coordination and collaboration of multiple Government/Department of Defense (DOD) commands in performing all tasks and work as described in this RFP. Naval Sea Systems Command (NAVSEA) and its contractors shall provide LARCS and other communication infrastructure support, collateral, and Government Furnished Equipment (GFE) to be installed by the P-1241 project as Government Furnished – Contractor Installed (GF-CI) on all Operating Position (OP) sites in the immediate vicinity of the communication tower work items. NAVSEA shall provide oversight for installation, construction, testing, and commissioning leading to LARCS and MAGTFTC training range System of Systems (SoS) acceptance.
68%
Solicitation02/18/2026
This contract was awarded on November 12, 2026 to Martin Brothers Construction for $26,711,770.00.
63%
AwardedOpen
P-210 Electrical Power Plant at Chabelley Airfield, Djibouti Please see attachments. Revised notice provided with updated site visit date and anticipated posting date.
63%
Pre-Solicitation12/18/2026
This is a request for information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a solicitation or a request for proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future. Please note that while Other Transaction Authority is not subject to FAR based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base. PROGRAM/PROJECT OVERVIEW: The U.S. Air Force 377th Contracting Division has a requirement to execute the construction and technical redesign requirements for the demolition of three substations and new construction of two upgraded substations. The services requested will include new 12.47 kV distribution systems. The primary purpose and objective of these projects are to rapidly upgrade the existing infrastructure, meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. The Government is evaluating the feasibility of executing these requirements under one award via Progressive Design-Build (PDB) utilizing an Other Transaction (OT) Agreement under the statutory authority of 10 U.S.C. § 2808a. Summaries of projects for this acquisition strategy are as follows: - MHMV200009 – Repair Substation 9 and Feeders: The primary objective of the Repair Substation 9 and Feeders project is to design and construct a fully operational, modern power distribution asset, upgrading the existing infrastructure to meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. This goal will be achieved by establishing the new substation facility within a defined 100ft x 150ft footprint directly south of the existing location, and installing all-new substation components, security fencing, distribution poles, switching gear, and conductors. The project also aims to complete the systematic teardown and removal of all retired infrastructure to restore the original site. - MHMV 120009 – Remove Substation 23 & Connect Loads to Substation 24A Feeder 5: The project entails the design and construction services required to remove Substation 23 & connect loads to Substation 24A Feeder 5 located on KAFB. The primary purpose and objective of this project is to upgrade the existing infrastructure of Substation 24A Feeder 5 to meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. - MHMV080002 – Demo Substation 3, Rebuild Substation 10 and Distribution System: The primary goal of the Demo Substation 3, Rebuild Substation 10 and Distribution System project is to safely decommission and demolish Substations 3 and 10 and design, construct, and commission a modern, consolidated Substation 10 rated at 10,000 KVA (10/12/14 MVA). This infrastructure upgrade will replace aged, unserviceable assets with a resilient, high-capacity substation and an underground distribution backbone designed to eliminate single points of failure and modernize base electrical infrastructure. Included in this notice are the attachments of the Scope of Services with technical documents for more detailed information on the nature of the work. INFORMATION REQUESTED: Interested industry partners are requested to respond to the following questions to help shape the final acquisition strategy. Please limit your responses to no more than 5-pages addressing the following questions – - Company Profile: Business Name Address Point of Contract (Name, Title) Phone Number Email Address Cage Code & UEI - Relevant Experience: Please provide your relevant experience as it relates to performing multiple project in similar size, scope, and complexity to this requirement. Summarize performance clearly and factually, along with project locations and the projects customer(s). Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feed-back received will be handled as public market research to shape the Government's final acquisition approach. - Feedback on the Acquisition Strategy & Alternatives: OTA Experience – Describe your firm’s previous experience, if any, executing projects utilizing OTA. What project characteristics make PDB OTA particularly advantageous or disadvantageous for this requirement? Describe your experience executing Progressive Design-Build, Construction Manager at Risk (CMAR), or other highly collaborative delivery methods where designer and builder worked collaboratively with the owner before locking in a Guaranteed Maximum Price (GMP). Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Are there alternative acquisition strategies, commercial phasing arrangements, or risk-sharing terms that the Government has not considered that would yield a higher quality facility, faster delivery, or lower cost? The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of these projects under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Please submit your responses to the Government Point of Contact listed below by the response date listed.
60%
Market Research11/19/2026
Amendment 0004 and RFI Set #4 Posted July 27, 2026***************************Amendment 0003 and RFI Set #3 has been uploaded on July 17, 2026*****************************************************************************The purpose of Amendment 2 is to extend the proposal due date to July 31, 2026 and make revisions to the solicitation. See the summary of changes on page 2 of Amendment 0002. Responses to RFI - Set #2 has been posted. ***********************************The purpose of Amendment 0001 is to extend the proposal due date to July 13, 2026 and make revisions to the solicitation. See the summary of changes on page 2 of the attached amendment. Due to the number of RFIs received, the USACE is still preparing responses and responses will be posted as soon as they are available. A select number of RFIs have been posted with this Amendment. ***************************************************************************************************************************************************************************************************This procurement will be conducted under PSC: Y1MG, NAICS: 237130. The size standard for this code is $45,000,000. This is a total Small Business Set Aside. All questions should be directed to the Contract Specialist, Nairi Freeman, nairi.freeman@usace.army.mil. Estimated Cost Range is between $10,000,000 to $25,000,000. FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE. SEE FAR CLAUSE 52.232-18 AVAILABILITY OF FUNDS. RFP/Solicitation Number: W9123826RA016. Project Title: U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid. Project Location: Mountain View, Santa Clara County, California. This project provides energy resilience for 14+ days for mission critical functions, utilizing renewable and fossil fuel energy sources. Installation of a microgrid system that will have full islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear for building energy shifting; a 750kWh battery energy storage system (BESS); an 800kW diesel backup generation system, with a 10,000-gallon fuel storage tank. The microgrid system will include a master microgrid controller, and automatic smart switches controlling the generation resources within the Reserve Center. Microgrid will be installed on a closed restricted network (CRN) requiring an Authority to Operate (ATO) IAW DODI 8510.01. System cybersecurity requirements will be designed IAW UFC 4-010-06 Cybersecurity for Facility Related Control Systems. All proposals will be due on June 29, 2026, at 12:00PM PDT. The specific date and time is identified in the solicitation. OFFERORS ARE ADVISED THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the RFP is issued, it is imperative that all prospective Offerors (including their subcontractors) be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments - PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.
59%
Solicitation07/31/2026

Additional Details

Solicitation Number

N6247327R0006

Archive Date

Oct 29, 2026

Office Address

SAN DIEGO, CA, 92132-0001