Replace Inner Gate at East Gate
Responses closed . Full description on SAM.gov.
Description
Update to add answers to additional two questions:
This soliciatation has been extended for one week.
Below are answers to submitted questions:
- Does this project require the contractor awarded to provide power and gate controls? If so, can you please provide details on the power source and where the gate will be controlled from? (Yes, the contractor will be responsible for connecting the new gate into the interlock system. This system is controlled from Tower 3 and from the Control Center. The secured electronics room in above the east gate inner currently.)
- Who is responsible for moving the wall mounted camera seen in Sketch #1 if it is in the new gate travel path? (Contractor will be responsible to remove and re-install anything that may become interference for the new gate system.)
- Planholders list/bidders list or mandatory prebid list – Not available
- Confirm that the bid date and time listed above are unchanged – (Bid Date/Time is correct, changes will be listed as an amendment to sam.gov) -
- Any addenda that have been released, please attach them to this response (No amendments. Any changes will be listed as an amendment to sam.gov) -
- Construction cost estimate or a construction cost range for the project.- (The estimated magnitude of the project is $170,000.00 and the SAT of $350,000.)
The Federal Bureau of Prisons (BOP), Federal Correctional Institute (FCI), Atlanta, (FCI Atlanta) located at 601 McDonough Blvd SE, Atlanta, GA, intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to replace the antique swinging East Gate (inner gate). The contractor is responsible for verifying all measurements, fabricating the fencing/gate systems and installing the fencing and gate systems and all associated hardware and drive mechanisms. All manufacturers’ recommendations will be required to be implemented.
Period of performance is estimated 153 calendar days from the issuance of the Notice ot Proceed to testing and acceptance of the project. The time frame allotted will allow adequate time for security clearances to be obtained, materials to be ordered and delivered on site, the removal of the old equipment, the work to be completed, system testing to be completed, and demobilization from the work site.
Please contact K. Rogers for details on and/or to cooridinate site visits to view East Gate. Mr. Rogers contact information is 404-635-5100 or K2Rogers@bop.gov.
Please see the attached Statement of Work for specifications.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (3)
- Download
26Z3AJ7 ATL SOW Review Replace Gate S pic.pdf
1.1 MBAdded in Combined Synopsis/Solicitation version 3Posted - Download
East Gate BRQ 15B30126Q00000024.pdf
542 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
26Z3AJ7 ATL SOW Review Replace Gate.pdf
156 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/Solicitation
Replace Inner Gate at East Gate
- 2Version 2Combined Synopsis/Solicitation
Replace Inner Gate at East Gate
- 3Version 3Combined Synopsis/Solicitation
Replace Inner Gate at East Gate
- 4Version 4Combined Synopsis/SolicitationCurrent
Replace Inner Gate at East Gate
- 5Version 5Award Notice
Type changed from Combined Synopsis/Solicitation to Award Notice
Replace Inner Gate at East Gate
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
15B30126Q00000024
Archive Date
Jul 9, 2027
Office Address
ATLANTA, GA, 30315