Notice ID: 6833c39db99147b29b897596756dbb4cCombined Synopsis/Solicitation
Replace Roofing Staff Housing - FCI Safford
Archived on August 20, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−06:00
- Posted
- July 31, 2024
- Notice type
- Combined Synopsis/Solicitation
- NAICS
- 238160: Roofing Contractors
- Agency
- Department of JusticeFEDERAL PRISON SYSTEM / BUREAU OF PRISONS
Notice details
- Office
- FCI SAFFORD
- Place of performance
- Safford, 85546
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 15B60924Q00000008
- Notice ID
- 6833c39db99147b29b897596756dbb4c
Description
1. FLAT ROOF SECTION: The contractor shall be responsible for the removal and haul away of the existing flat rolled roofing, roof decking, fascia, shingle mold, drip edge, and rain gutters on the flat section located on the back of the staff housing complex. A new conventional framed sloped roof will need to be constructed to have a slope equal to or greater than 3:12 pitch to meet shingle manufactures specifications. The existing rafters will not be removed but the new rafters attached to the existing with any alterations that may be required. The rafters will need to be long enough to make the new soffit 16 inches past the exterior wall. This new section of constructed roof will be required to have ½ plywood decking or OSB with plywood clips and required fasteners. The contractor will be required to install new synthetic underlayment, sub fascia (traditional lumber), fascia (5/4” LP Smartside engineered wood trim), soffit (LP Smartside plywood panels), shingle mold (1x2 pine), metal drip edge (2”x2”), 30yr Owens Corning asphalt architectural shingles (sierra gray in color), roof jacks, flashings, and rain gutters. 2. PITCHED TRUSS SECTION: The Contractor shall be responsible for the removal and haul away of the existing asphalt shingles, felt(underlayment), shingle mold, metal drip edge, rain gutters, flashings, soffit, fascia, and roof jacks on the entire trussed staff housing complex. A row of sheeting will need to be removed to extend truss tails or install outriggers to make the new soffit overhang 16 inches past the exterior wall. Once that has been removed the contractor will be required to install new synthetic underlayment, sub fascia (traditional lumber), fascia (5/4” LP Smartside engineered wood trim), soffit (LP Smartside plywood panels), shingle mold (1x2 pine), metal drip edge (2”x2”), 30yr Owens Corning asphalt architectural shingles (sierra gray in color), roof jacks, flashings, and rain gutters. 3. Housing will be occupied during construction. All construction activities must be conducted so that housing areas are protected from weather, and that staff living there are minimally impacted by construction. 4. The contractor shall be responsible for caulking, filling holes, priming, and painting all fascia, soffit, and drip edge on the staff housing complex. 5. Required sealant around all penetrations before roof is complete.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
15B60924Q00000008- Pre-Solicitation
- Combined Synopsis
- Pre-SolicitationJun 7, 2024
Replace Roofing Staff Housing - FCI Safford
- 4×Combined SynopsisCurrentJun 26, 2024
Replace Roofing Staff Housing - FCI Safford
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
15B60924Q00000008
Archive Date
Aug 20, 2024
Office Address
SAFFORD, AZ, 85548