GovChime
Notice ID: 6833c39db99147b29b897596756dbb4cCombined Synopsis/Solicitation

Replace Roofing Staff Housing - FCI Safford

Archived on August 20, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
July 31, 2024
Notice type
Combined Synopsis/Solicitation
NAICS
238160: Roofing Contractors
Agency
Department of JusticeFEDERAL PRISON SYSTEM / BUREAU OF PRISONS

Notice details

Office
FCI SAFFORD
Place of performance
Safford, 85546
Last updated
Sep 25, 2026

Identifiers

Solicitation number
15B60924Q00000008
Notice ID
6833c39db99147b29b897596756dbb4c

Description

1. FLAT ROOF SECTION: The contractor shall be responsible for the removal and haul away of the existing flat rolled roofing, roof decking, fascia, shingle mold, drip edge, and rain gutters on the flat section located on the back of the staff housing complex. A new conventional framed sloped roof will need to be constructed to have a slope equal to or greater than 3:12 pitch to meet shingle manufactures specifications. The existing rafters will not be removed but the new rafters attached to the existing with any alterations that may be required. The rafters will need to be long enough to make the new soffit 16 inches past the exterior wall. This new section of constructed roof will be required to have ½ plywood decking or OSB with plywood clips and required fasteners. The contractor will be required to install new synthetic underlayment, sub fascia (traditional lumber), fascia (5/4” LP Smartside engineered wood trim), soffit (LP Smartside plywood panels), shingle mold (1x2 pine), metal drip edge (2”x2”), 30yr Owens Corning asphalt architectural shingles (sierra gray in color), roof jacks, flashings, and rain gutters. 2. PITCHED TRUSS SECTION: The Contractor shall be responsible for the removal and haul away of the existing asphalt shingles, felt(underlayment), shingle mold, metal drip edge, rain gutters, flashings, soffit, fascia, and roof jacks on the entire trussed staff housing complex. A row of sheeting will need to be removed to extend truss tails or install outriggers to make the new soffit overhang 16 inches past the exterior wall. Once that has been removed the contractor will be required to install new synthetic underlayment, sub fascia (traditional lumber), fascia (5/4” LP Smartside engineered wood trim), soffit (LP Smartside plywood panels), shingle mold (1x2 pine), metal drip edge (2”x2”), 30yr Owens Corning asphalt architectural shingles (sierra gray in color), roof jacks, flashings, and rain gutters. 3. Housing will be occupied during construction. All construction activities must be conducted so that housing areas are protected from weather, and that staff living there are minimally impacted by construction. 4. The contractor shall be responsible for caulking, filling holes, priming, and painting all fascia, soffit, and drip edge on the staff housing complex. 5. Required sealant around all penetrations before roof is complete.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

Solicitation:15B60924Q00000008
  1. Pre-Solicitation
  2. Combined Synopsis
  1. Pre-SolicitationJun 7, 2024

    Replace Roofing Staff Housing - FCI Safford

    Notice 1513a3d4bc9f4df5944eee7897e41de8 on SAM.gov

  2. 4×
    Combined SynopsisCurrentJun 26, 2024

    Replace Roofing Staff Housing - FCI Safford

    Notice 6833c39db99147b29b897596756dbb4c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

15B60924Q00000008

Archive Date

Aug 20, 2024

Office Address

SAFFORD, AZ, 85548