GovChime
Notice ID: b6b1b8d5c6dc411e94476cd5c6248410Solicitation

USP LEE Replace Cooling Towers

Archived on April 17, 2026. Original response deadline: . Full description on SAM.gov.

Description

The Federal Bureau of Prisons (FBOP), United States Penitentiary (USP) Lee County, located at Hickory Flats Road, Pennington Gap, VA 24277 intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to deliver all products and services described in the Scope of Work section of this statement of work.  Currently, the institutional Powerhouse has two water cooling towers located in the CUB (Central Utility Building). These two cooling towers are responsible for cooling the water for the institutional chillers. The cooling towers are the original cooling towers that have been in operation for twenty-five years and are beginning to experience numerous and various mechanical failures. This is due to their constant operational status and lifespan overuse. One of the cooling towers is currently inoperable and we are solely relying on the other cooling tower to produce the amount of chilled water that two has produced in the past.  The contractor will provide all necessary labor, parts, delivery, removal, disposal, installation, startup and training of staff for the total replacement of the two institutional cooling towers. The cooling towers must be in compliance with approved specifications

Full description on SAM.gov

Overview

Agency:
Department of JusticeFEDERAL PRISON SYSTEM / BUREAU OF PRISONS
Office:FAO
Posted:March 10, 2026
NAICS:238220: Plumbing, Heating, and Air-Conditioning Contractors
Last Updated:Aug 21, 2026
PSC:Z2FF: REPAIR OR ALTERATION OF PENAL FACILITIES
Set-Aside:No Set aside used
Type:Solicitation
Place of Performance:Pennington Gap, Virginia, 24277

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

ronald calandra

Documents

Select documents to download

Showing 7 of 7 items

Document
Source
Agency
Posted Date
File Size
Actions
SolicitationFEDERAL PRISON SYSTEM / BUREAU OF PRISONSMar 10, 202663.4 KB
SolicitationFEDERAL PRISON SYSTEM / BUREAU OF PRISONSMar 10, 2026228.3 KB
SolicitationFEDERAL PRISON SYSTEM / BUREAU OF PRISONSMar 10, 202663.86 KB
SolicitationFEDERAL PRISON SYSTEM / BUREAU OF PRISONSMar 10, 2026568.58 KB
SolicitationFEDERAL PRISON SYSTEM / BUREAU OF PRISONSMar 10, 2026180.42 KB
SolicitationFEDERAL PRISON SYSTEM / BUREAU OF PRISONSMar 10, 2026736.06 KB
SolicitationFEDERAL PRISON SYSTEM / BUREAU OF PRISONSMar 10, 2026611.61 KB

Lifecycle

Solicitation:15BBNF26Q00000003A
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. SolicitationCurrentMar 10, 2026

    USP LEE Replace Cooling Towers

    Notice b6b1b8d5c6dc411e94476cd5c6248410 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

15BBNF26Q00000003A

Archive Date

Apr 17, 2026

Office Address

GRAND PRAIRIE, TX, 75051