FCI Oxford Repair Wastewater Aerator
Archived on April 18, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM EDT
- Posted
- March 19, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 221320: Sewage Treatment Facilities
- Agency
- Department of JusticeFEDERAL PRISON SYSTEM / BUREAU OF PRISONS
Notice details
- Office
- FAO
- Place of performance
- Grand Marsh, Wisconsin, 53936
- Last updated
- Nov 1, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 15BBNF26Q00000042
- Notice ID
- 32201a477c3442faa40a917c71b74073
Description
The Federal Bureau of Prisons (FBOP), Federal Correctional Institution, located at County Road G & Elk Avenue, Oxford, Wisconsin 53952 intends to make a single award to a responsible entity that will restore the existing wastewater aerator drive assembly serving the facility’s wastewater treatment system.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (4)
- Download
Instructions to Offerors.pdf
74 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
15BBNF26Q00000042.pdf
113 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 1 SOW.pdf
548 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 2 Wage Determination WI20250015.pdf
738 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
FCI Oxford Repair Wastewater Aerator
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
FCI Oxford Repair Wastewater Aerator
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Federal Bureau of Prisons (FBOP) and the Federal Correctional Institution Oxford located at 350 Elk Avenue, Oxford, Wisconsin, intend to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to remove existing water softeners and install a new centralized water softener for the entire Institution. Awarded Contractor shall provide materials, labor, and equipment to remove existing water softeners, pipe through and install a new centralized water softener and all associated components. FCI Oxford currently has several commercial-grade water softeners which are failing to efficiently reduce water hardness and protect water systems, as well as connected equipment. The new centralized system should improve water quality, minimize calcium buildup, and extend the service life of plumbing infrastructure and appliances. The contractor would place a brine tank and softener to be installed at the water tower. Water would be treated right off the water main, therefore there would be no need for bagged salt to be brought in weekly. | 75% | Combined Synopsis | 12/04/2026 |
Monroe Lake Lift Station Rehabilitation | 46% | Combined Synopsis | 04/10/2026 |
Wastewater Treatment Plant Operator for Yosemite National Park Amendment 002 is to add attachment 004, Contractor Questions and Answers, and to extend the closing date to 8/18/2026 at 5 pm PT. | 43% | Combined Synopsis | 08/19/2026 |
FCC Yazoo City FY 2027 Water Treatment Services | 42% | Awarded | Open |
Login at https://piee.eb.mil and search for 'W90VN926RA015' to obtain more details.* | 42% | Combined Synopsis | 01/30/2026 |
Additional Details
Solicitation Number
15BBNF26Q00000042
Archive Date
Apr 18, 2026
Office Address
GRAND PRAIRIE, TX, 75051