GovChime
Archived

Presolicitation- FCI Safford- Install Carbon Monoxide Detection System

Overview

Response deadline
11:00 AM PDT
Posted
August 11, 2026
Notice type
Presolicitation
Set-aside
No Set aside used
Agency
Department of JusticeFEDERAL PRISON SYSTEM / BUREAU OF PRISONS

Notice details

Office
FAO
Place of performance
Safford, Arizona, 85546
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
15BBNF26Q60900001
Notice ID
064421fcab7a447abfa4a0b5f4716231

Description

Pre Solicitation Notice Synopsis

THIS IS A SYNOPSIS OF PROPOSED CONTRACT ACTION. THIS IS NOT A SOLICITATION OR A REQUEST FOR QUOTATIONS. PRE-SOLICITATION NOTICE IS POSTED IN THE GOVERNMENTWIDE POINT OF ENTRY IN ACCORDANCE WITH FAR 12.201-1(c)(2) [Deviation April 2026].

The Federal Bureau of Prisons (FBOP) announces a proposed contract action for the award of a firm-fixed-price commercial supply/service & construction contract for procurement of installation of a carbon monoxide detection system for the Federal Correctional Institution Safford located in Safford, AZ. FCI Safford is a federal correctional facility located at 1529 W. US HWY 366, Safford, AZ 85546.

This acquisition will be conducted using FAR Part 12 [Deviation April 2026], Acquisition of Commercial Products and Commercial Services, in conjunction with the simplified procedures at FAR 12.201‑1 [Deviation April 2026]. In accordance with FAR 12.201‑1(c)(2) [Deviation April 2026], quotations will be solicited directly from at least three sources. This pre‑solicitation notice is posted in the Governmentwide Point of Entry (GPE) to promote competition to the maximum extent practicable.

The requirement consists of all labor, materials, equipment, tools, supervision, and warranties necessary to install the carbon monoxide detection system. The contractor and any subcontractors must be reputable, holding valid and current contracting licenses. If required, personnel must provide certifications or documented proof of experience, demonstrating competency in executing the project. Proof must be provided to the Contracting Officer (CO) or COR upon request. All work and materials must comply with applicable local, state, and federal codes, including the latest editions of the International Building Code, NFPA, Life Safety Code, OSHA, American Correctional Association Standards, and other relevant regulations. This project involves the design, supply, installation, integration, testing, and commissioning of a Carbon Monoxide (CO) detection system that will be fully interfaced with the existing fire detection and alarm system (FDAS) in accordance with applicable codes and standards. The contractor is required to design and install carbon monoxide (CO) detectors in compliance with the latest National Fire Protection Association (NFPA) that will be compatible with our current Fire Alarm system, the Edwards EST3 system installed in 2022. All items must meet or exceed the specifications that will be provided in the forthcoming Request for Quotations (RFQ). Delivery of supplies and installation will be at FCI Safford 1529 W. US HWY 366, Safford, AZ 85546.

The NAICS code for this requirement is 238210 – Electrical Contractors and Other Wiring Installation Contractors.

The anticipated award date for this requirement is August 18, 2026.

IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in https://www.sam.gov. In order to qualify for award, your business size metrics information entered in your SAM registration must be less than or equal to the size standard specified above. If you have questions about SAM, Government procurements in general, or need assistance in the preparation of your bid/proposal/offer, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org.

This acquisition is being conducted under FAR Part 12 [Deviation April 2026] for commercial supplies/service & construction and has no set aside restrictions. You must be registered in www.sam.gov as a small business (see FAR provision 52.219-1 [Deviation April 2026] in the Representations & Certifications section of your www.sam.gov registration).

This synopsis is intended only for those who would be entering into a Prime contract with the FBOP for the entirety of this project. The FBOP does not award subcontracts. Subcontracts (if applicable/necessary) are the responsibility of the Prime contractor. The FBOP has no privity of the contract with subcontractors.  

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Manjit Dola

Documents

Files (1)

  • PreSolicitation Notice- FAR RFO Part 12.pdf

    81 KBAdded in Presolicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1PresolicitationArchived

    Presolicitation- FCI Safford- Install Carbon Monoxide Detection System

    Notice f6f65a0652a648238875231727a73f63 on SAM.gov

  2. 2
    Version 2PresolicitationArchived

    Presolicitation- FCI Safford- Install Carbon Monoxide Detection System

    Notice ac8524c765b04b439f28ca8f32b87198 on SAM.gov

  3. 4
    Version 4PresolicitationArchivedCurrent

    Presolicitation- FCI Safford- Install Carbon Monoxide Detection System

    Notice 064421fcab7a447abfa4a0b5f4716231 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

15BBNF26Q60900001

Archive Date

Aug 29, 2026

Office Address

GRAND PRAIRIE, TX, 75051