MCC Chicago - FS Drainage and Floor
Archived on October 26, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:30 PM UTC−05:00
- Posted
- October 11, 2023
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238330: Flooring Contractors
- Agency
- Department of JusticeFEDERAL PRISON SYSTEM / BUREAU OF PRISONS
Notice details
- Office
- FAO
- Place of performance
- Chicago, 60605
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 15BFA023B00000043
- Notice ID
- ab292a06f1b0401994c554f9750159a4
Description
10/11/2023: Abstract of Offers published in the attachments section. 9/27/2023: Amendment 0001 issued. This amendment incorporates site visit meeting minutes and photos, incorporates questions and answers, updates the wage determination, and updates three clauses incorporated by reference. See attachments for complete details. 9/6/2023: The Federal Bureau of Prisons (FBOP) herein issues solicitation 15BFA023B00000043 for the award of a firm-fixed-price construction contract for a project entitled FS Drainage and Floor, at the Metropolitan Correctional Center (MCC) Chicago, located in Chicago, Illinois. MCC Chicago is a federally owned facility located at 71 W. Van Buren Street, Chicago, IL 60605. The project consists of the following: 1. The contractor shall be responsible for removing the existing quarry tile floors and thin-set mortar down to sound concrete substrates and disposed of in a contractor provided dumpster. This work will be completed in the entire Food Service area, including the tile in all 3 cooler boxes (Dairy, Food Bank, Produce) and Food Service Administrator Office. Approximately 5000 sqft. 2. The Contractor shall remove all existing ceiling tiles from the kitchen work area prior to beginning demolition work, approximately 5,000 sqft, to protect them from damage during the performance of the work. The Contractor shall carefully package the ceiling tiles for storage, and the Contractor shall re-install them near the end to the construction project. The institution will provide space on site to store the ceiling tiles for the Contractor. The Contractor shall replace all ceiling tiles damaged during the removal and reinstallation process with tiles that match the existing. These existing ceiling tiles are a specialty product for the Kitchen environment, for regular removal and cleaning. The Contractor shall protect all existing light fixtures and all existing Kitchen elements that will remain during the demolition and construction process. 3. The contractor will work with MCC Pipefitter, Facility Manager, and COR and perform a non-invasive sewer .video inspection providing a thorough, detailed, and precise analysis in real time. A technologically advanced camera with high-resolution imaging and waterproof protection will be used. The camera will be attached to a flexible rod for complete mobility and maneuverability. A pipeline inspection gauge and other tools can also be attached. 4. The contractor will use pipe locating equipment and mark all sewer lines on the concrete floor throughout Food Service. 5. Prior to demolition and replacement of all Kitchen drain lines, drainage devices and cleanouts; the Contractor shall perform a camera inspection of all the below floor kitchen drainage lines and components. The camera inspection shall be coordinated with the institution staff (Facility Manager/COR/Pipe Fitter) to verify all existing conditions of the kitchen drainage system, prior to demolition and construction. 6. Two drains will be added outside of each egress door (2) as marked on the drains drawing, both doors are in Food Service. 7. The contractor will work with MCC Pipefitter, Facility Manager, and COR after the camera inspection and create an as built drawing showing all changes that needed to be made prior to the start of any work. 8. It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution. 9. Contractor to remove all concrete needed to make all repairs/replacements. All concrete prepping and cutting equipment will be electrical, with all construction work being in a basement no gas-powered equipment will be allowed. Wet cut saws and dust controlling vacuums will be used on all equipment. 10. After all plumbing repairs/additions have been made, the contractor will work with the MCC Pipefitter, Facility Manager, and COR, to verify proper drainage on all lines with a large volume water test, (underground stack test). The test will be monitored using sewer video inspection equipment. 11. After all plumbing repairs/additions have been made, the contractor will ensure all concrete repairs are done in such a way that the new seamless coating can be installed over these concrete repairs in a reasonable amount of time (EXAMPLE: additive to concrete mix to speed up cure times). Time frames will be discussed and approved by the MCC Facility Manager, and COR. 12. The contractor will begin preparations for urethane mortar resurfacing system. This will provide a sealed, waterproof, durable, and seamless finish. 13. The contractor will prepare the floors with a virtually dust-free, and odorless shot-blasting method. 330-390 steel shot will be used to provide a medium blast profile per ICRI CSP5. Edges where the shot-blast machine cannot reach will be hand ground with diamond grinders connected to dust-collecting vacuums. 14. Following the above preparation, the contractor will install a high solids urethane slurry/broadcast flooring system at a nominal 3/16" thickness. This specialty flooring system will be designed to withstand heavy traffic and is highly resistant to thermal shock. Color to be determined by MCC COR 15. The contractor to Install 2-inch Cant cove base to the floor/wall interface around the total floor and around the seven (7) structural columns to provide a watertight “bathtub effect” for the entire area. NOTE: No cove base against Freezer and Refrigerator insulated panel walls. 16. A caulk joint will be installed against Freezer and Refrigerator insulated panel walls instead of the 2’’ Cant cove base. 17. Contractor to install a heavy layer of “Novolac” epoxy will then be applied to the floors and cove base. This is a 100% solids “Novolac”-based specialty coating compound formulated to provide excellent temperature (up to 220 degrees Fahrenheit intermittent), acid, chemical and abrasion resistance, approximately 5000 sqft of floor. 18. Contractor to install a reinforced wall coating in the dishwashing area, approximately 400 sqft of wall space. •Remove the existing paint down to concrete substrate. •Patch any damaged or pitted areas with 100% solids plural component epoxy patching compound. •Install 100% solids plural component thixotropic filler/primer. •Spray apply, 100% solids plural component Kevlar and Fiberglass stranded epoxy system at a minimum of 45 mils. •Install one final 100% solids plural component glaze coat at 6-8 mils. Access to the specifications and drawings attachments will require an active https://sam.gov vendor registration (log in) AND may require a specific role or domain linked to your registration. If you encounter problems requesting access to these documents, please contact the Federal Service Desk at 866-606-8220. Interested bidders must be registered in the System for Award Management (SAM) at https://sam.gov. Pursuant to Federal Acquisition Regulation (FAR) 36.204, the estimated magnitude of the project lies between $250,000 to $500,000 (NOTE: This range is one of 8 available ranges from FAR 36.204 and is not meant to imply that the project has necessarily been estimated/budgeted to the maximum of the selected range. It merely conveys that the estimate/budget lies somewhere within that range.) The North American Industrial Classification System (NAICS) code applicable to this requirement is 238330 (Flooring Contractors) with a corresponding small business size standard of $19 million. The solicitation is set aside exclusively for small business contractors. The solicitation will be distributed solely through the website at https://sam.gov. Hard copies of the solicitation will not be made available. The website provides download instructions. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action. IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in the System for Award Management (SAM) at https://sam.gov. If you have questions about SAM, Government procurements in general, or need assistance in the preparation of your bid/proposal/offer, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
15BFA023B00000043- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationAug 18, 2023
MCC Chicago - FS Drainage and Floor
- 3×SolicitationCurrentSep 6, 2023
MCC Chicago - FS Drainage and Floor
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Replace powerhoues hot water tanks at FCI Marion in accordance with the statement of work. A site visit will be held November 10, 2026 at 9:00 AM CST at the powerhouse located at FCI Marion 4500 Prison Road Marion, IL 62959. Vendors who plan to attend the site visit must submit the attached Criminal History Check Form to John Jordan, Facilities Manager by 12:00 PM CST by Thursday, November 5, 2026 for clearance. Email: Jxjojordan@bop.gov. Phone: 618-964-2098. All questions are due to Tammie Johnson, Contracting Officer by COB November 17, 2026. Email: t8johnson@bop.gov. | - | Pre-Solicitation | 11/30/2026 |
Replace powerhouse hot water tanks in accordance with the SOW. A site visit will be held November 10, 2026 at 9:00 AM CST at the powerhouse located at FCI Marion 4500 Prison Road Marion, IL 62959. Vendors who plan to attend the site visit must submit the attached Criminal History Check Form to John Jordan, Facilities Manager by 12:00 PM CST by Thursday, November 5, 2026 for clearance. Email: Jxjojordan@bop.gov. Phone: 618-964-2098. All questions are due to Tammie Johnson, Contracting Officer by COB November 17, 2026. Email: t8johnson@bop.gov. | - | Solicitation | 11/30/2026 |
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR part 12 in conjunction with FAR Part 36. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov. Solicitation number 15BBNF26Q40900001 is issued as a request for quotation (RFQ), for: The Federal Bureau of Prisons, FCI Marion, intends to issue a solicitation for the following requirement: The Federal Bureau of Prisons (FBOP), Federal Correctional Institution (FCI) Marion located at 4500 Prison Road Marion, IL 62959 intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to repair damage to the 3-phase overhead primary distribution line and two (2) transformers. See the Statement of Work attachment included with the solicitation posting for the complete requirements of the work. The performance period for the project will be 90 Calendar Days from issuance of the notice to proceed. The NAICS code for this requirement is 237130 (Power and Communication Line and Related Structures Construction) with a corresponding small business size standard of $45 million. The solicitation will be distributed solely through the Contract Opportunity website at https://www.sam.gov. Hard copies of the solicitation will not be made available. The website provides download instructions. The "Sensitive /Secure package Upload" option will be selected for this procurement. All secure/locked documents uploaded, to include the solicitation, will require an active SAM vendor registration to obtain access. In addition, only those vendors who have been issued a valid Marketing Partner Identification Number (MPIN) from www.sam.gov will be granted access. If your firm does not have the NAICS code listed in www.sam.gov required for this solicitation, an email may be forwarded to your firm requesting an explanation as to why your firm should be granted access. If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action. IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in https://www.sam.gov. In order to qualify for award, your business size metrics information entered in your www.sam.gov SAM registration must be less than or equal to the size standard specified above. Each offeror's www.sam.gov registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement. All bidders are urged to double check their www.sam.gov registration and update as necessary, including the size metrics information. This is a 100 percent small business set-aside. You must be registered in www.sam.gov as a small business for the applicable NAICS code (see FAR provision 52.219-1 in the Representations & Certifications section of your www.sam.gov registration). Quotation Deadline: The anticipated closing date for receipt of quotations is December 03, 2026, at 12:00 pm Eastern Time. Payment Terms: Payment will be processed via Electronic Funds Transfer (EFT) in accordance with 52.232-33 Payment by Electronic Funds Transfer- System for Award Management Additional Requirements: Offerors must include a specification sheet and any submittal information about the products offered in their quotation. Faxed and hand-delivered quotes will not be accepted. Site Visit: A site visit will be held at FCI Marion to allow interested vendors the opportunity to examine existing conditions and the work area. Attendance is encouraged but not mandatory. Vendors wishing to attend must submit NCIC background check forms for all proposed attendees by the deadline stated in the solicitation. Only individuals who have received prior approval will be permitted to enter the facility. Specific instructions regarding the date, time, meeting location, required identification, and security procedures will be provided in the solicitation. Questions will not be answered during the site visit; all questions must be submitted in writing to the Contracting Officer in accordance with the solicitation instructions. Solicitation Post Date: estimated Monday, October 5, 2026. NCIC forms due: Friday, October 23, 2026 by 12 pm Central Site Visit: Wednesday, October 28, 2026 at 9 am Central Questions Due: Monday, November 02, 2026 by 12pm EST Offer Due Date: Thursday, December 03, 2026 at 12:00pm EST Any questions regarding the solicitation may be submitted in writing via email to csmart@bop.gov. | - | Combined Synopsis | 12/03/2026 |
MT BOZEMAN FTC CARPET REPLACEMENT (CONFERENCE ROOM) Amendment 0001 | - | Solicitation | 11/13/2026 |
The 319th Contracting Squadron, Grand Forks AFB, North Dakota, is issuing this Solicitation as a means to Request for Quotes (RFQ) to identify parties to award a Firm-Fixed-Price Requirements Contract for the following: The work under this project consists of providing all material, equipment, and labor necessary for maintaining flooring/carpeting and other services necessary to perform Grand Forks Air Force Flooring work for GFAFB in accordance with the attached specifications. The work may include, but is not limited to, the following: Verification of Dimensions, Flooring Removal, Patch flooring, Surface Preparation, Installation, Disposal of Debris, and Furnishing Flooring as described in the attached documents. Quotes are due by 2 December 2026 at 3:00PM CST and shall be submitted electronically to SSgt Asante Nieves, Contract Specialist at asante.nieves@us.af.mil or Ms. Monique Padilla, Contracting Officer at monique.padilla.3@us.af.mil. Quoters must review all solicitation attachments for complete performance requirements. If proposal file size exceeds email limits, the offeror must request a DoD SAFE link from the POCs in advance of the due date. The current applicable wage determination is included and any updates prior to award or task order issuance will apply. All solicitation updates will be posted to SAM.gov. | - | Solicitation | 12/02/2026 |