Notice ID: 15d91387af4b4465b8737b82168605e9Solicitation
Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM CST
- Posted
- February 6, 2025
- Notice type
- Solicitation
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W07V ENDIST NEW ORLEANS
- Place of performance
- New Orleans, 70118
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912P8-25-B-0025
- Notice ID
- 15d91387af4b4465b8737b82168605e9
Description
Description and Magnitude of Work is as follows: The work consists of the removal and satisfactory disposal of dredged material excavated from the Tiger Pass Bar Channel and identification of utilities, within the limits shown on the contract drawings. (The estimated time of completion is 135 calendar days after receipt of Notice to Proceed. The solicitation will include 5 drawings and specifications). No dike work is included with this project. The bid opening will be conducted virtually, please see Section 0010 for Instructions to Bidders.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Lifecycle
- 1Version 1SolicitationCurrent
Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
** BID OPENING TO BE ESTABLISHED VIA AMENDMENT PROJECT TITLE: BARATARIA BAY WATERWAY, BAR CHANNEL, MAINTENANCE DREDGING, JEFFERSON PARISH, LOUISIANA PROJECT LOCATION: BARATARIA BAY, JEFFERSON PARISH, LOUISIANA DESCRIPTION OF WORK: THE WORK CONSISTS OF THE REMOVAL OF SHOAL MATERIAL WITHIN THE BARATARIA BAY BAR CHANNEL, AND SATISFACTORY DISPOSAL THEREOF WITHIN THE GRAND TERRE ISLAND DISPOSAL SITE AS SHOWN ON CONTRACT DRAWINGS. NO DIKE WORK IS REQUIRED. (THE ESTIMATED TIME OF COMPLETION IS 90 CALENDAR DAYS AFTER RECEIPT OF NOTICE TO PROCEED. THE SOLICITATION WILL INCLUDE 16 DRAWINGS AND SPECIFICATIONS). | - | Solicitation | 09/16/2028 |
Mermentau River Bar Channel Dredging, Mermentau River – Gulf of America, Maintenance Dredging, #26-1 Mermentau River Bar Channel Dredging, Mermentau River- Gulf of America, Maintenance Dredging, #26-1, Cameron Parish, LA (ED 26-007) The work consists of satisfactory removal of all material above elevation -17.0- ft MLG from C/L Station (-)16+00 (Mile 6.5) to C/L Station 250+00 (Mile 1.3), of Mermentau River from the limits as specified herein and successfully deposited on the Gulf Shoreline west of the Mermentau jetties, as shown on the plans. A BID OPENING DATE IS TO BE SET BY AMENDMENT. | - | Solicitation | 10/01/2028 |
NOTE: THIS IS A PRE-SOLICITATION NOTICE, NOT A SOLICITATION. PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME; THEREFORE, NO QUESTIONS OF A TECHNICAL OR CONTRACTUAL NATURE WILL BE ACCEPTED OR ANSWERED UNTIL THE SOLICITATION IS ISSUED. INFORMATION CONTAINED IN THIS PRE-SOLICITATION NOTICE IS SUBJECT TO CHANGE. Barataria Bay Waterway, Maintenance Dredging, Bar Channel, Jefferson Parish, Louisiana The work consists of the removal of shoal material within the Barataria Bay Bar Channel, and satisfactory disposal thereof within the Grand Terre Island disposal site as shown on contract drawings. No dike work is required. The estimated time of completion is 90 calendar days after receipt of notice to proceed. The solicitation will include 16 drawings and specifications. The solicitation will be issued on or about August 26, 2026. Further details to follow in solicitation. NAICS Code: 237990 Other Heavy and Civil Engineering Construction The solicitation documents for this procurement will be posted on www.sam.gov. you can access these files from a link located on www.sam.gov. You will need the adobe acrobat reader for .pdf files (www.adobe.com) to open most files posted by the New Orleans District. You are encouraged, for marketing purposes, to register as an Interested Vendor in www.sam.gov. This can be done by clicking on the solicitation title and clicking on the button that says Register as an Interested Vendor and entering your business information. Offerors are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administration’s subnet, at http://web.sba.gov/subnet. Offerors must be registered with the System for Award Management (SAM), in order to receive a Government contract award. To register, the SAM Internet address is: http://www.sam.gov. | - | Pre-Solicitation | 09/26/2026 |
This solicitation is issued as unrestricted. The NAICS code for this procurement is 237990. The magnitude of construction is between $10,000,000 and $25,000,000. THE WORK CONSISTS OF THE REMOVAL AND SATISFACTORY DISPOSAL OF ALL MATERIAL ABOVE ELEVATION -16.0 MLG FROM C/L STATION 70+00 (MILE 1.3) TO C/L STATION -210+00 (MILE -4.0), OF FRESHWATER BAYOU CHANNEL FROM THE LIMITS AS SPECIFIED HEREIN AND SHOWN ON THE CONTRACT DRAWINGS. ALL DREDGED MATERIAL SHALL BE TRANSPORTED AND SUCCESSFULLY DEPOSITED ON THE GULF SHORELINE WEST OF THE FRESHWATER BAYOU CHANNEL, AS SHOWN CONTRACT DRAWINGS. (THE SOLICITATION WILL INCLUDE 5 DRAWINGS AND SPECIFICATIONS). ***BID OPENING TO BE ESTABLISHED BY AMENDMENT*** | - | Solicitation | 06/18/2028 |
This solicitation is issued as unrestricted. The NAICS code for this procurement is 237990. The magnitude of construction is between $10,000,000 and $25,000,000. The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge for the removal and satisfactory disposal of shoal material in the Atchafalaya River Bay, Bar, and Crewboat Cut Channel. ***BID OPENING TO BE ESTABLISHED BY AMENDMENT*** | - | Solicitation | 06/12/2028 |
Additional Details
Solicitation Number
W912P8-25-B-0025
Archive Date
Feb 20, 2027
Office Address
NEW ORLEANS, LA, 70118-3651