Notice ID: 398b98a1e0678d4c243890ae51d40a0bCombined Synopsis/Solicitation
Design/Build - Roofs and Window Replacement on Buildings 2 and 7 at the Barranquitas Job Corps Center
Archived on June 25, 2019. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM UTC−05:00
- Posted
- October 26, 2017
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
- NAICS
- 236220: Commercial and Institutional Building Construction
Notice details
- Place of performance
- Barranquitas Job Corps Center State Road 152, KM 2.0, Barrio Quebradilla, Barranquitas, PR, 00794
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- 1630DC-17-R-00003
- Notice ID
- 398b98a1e0678d4c243890ae51d40a0b
Description
The soliciation, Amendment 0001 and Amendment 0002 have been uploaded. If you have problems then please send notification to ramso.bryan@dol.gov.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
1630DC-17-R-00003- Pre-Solicitation
- Combined Synopsis
- Awarded
- Pre-SolicitationFeb 8, 2017
Design/Build - Roofs and Window Replacement on Building 2 and 7 at the Barranquitas Job Corps Center
- 8×Combined SynopsisFeb 23, 2017
Design/Build - Roofs and Window Replacement on Buildings 2 and 7 at the Barranquitas Job Corps Center
- AwardedJun 27, 2017
Design/Build - Roofs and Window Replacement on Buildings 2 and 7 at the Barranquitas Job Corps Center
- 3×Combined SynopsisCurrentOct 25, 2017
Design/Build - Roofs and Window Replacement on Buildings 2 and 7 at the Barranquitas Job Corps Center
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
FA8501-27-RAPID-CIRCUIT F1-170129-OTA Under the RAPID Umbrella Framework: RAPID Progressive Design-Build to Replace Circuit F-01 from Fowler Substation UHHZ170129 Description The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a. The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA. The requirement includes replacement of all 15kV, 500MCM cable throughout circuit F-01. This will include replacement and removal all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a. Purpose The purpose of this Area of Interest is to obtain commercially viable, safe, and schedule-credible solutions to design plans for and to perform the replacement of expired high-risk Circuit F01 cabling in order to prevent operational risk, mission delays, and compounding economic costs due to infrastructure failure at Robins Air Force Base, Georgia. The Government requires an integrated approach to address the design, removal of deteriorated cables and replacement with new cable in The Fowler Substation. The selected approach must provide a practical path to execute the work while minimizing disruption to aircraft operations and controlling construction, safety, environmental, and schedule risks. Project Background and Existing Conditions Circuit F-01 has surpassed its operational lifecycle, creating a high-probability risk for catastrophic failure. If the remaining aged portion is not replaced, the installation faces risk of emergency repair premiums and disruption to sustaining airfield infrastructure, supporting safe aircraft movement, installation readiness, and continued mission operations. The work area is slightly congested and impacted by various airfield operations. The Fowler Substation Circuit F-01 will remain in full operation during the entire duration of the project by back feeding with circuit ties. Project Areas Phase 1 (Preconstruction & Collaborative Design): Collaborative design development stakeholders to achieve 65%, site surveys, risk mitigation planning, schedule and establishment of an open-book Guaranteed Maximum Price (GMP) IAW with all other aspects of the SOO. Phase 2 (Final Design & Construction Execution) Completion of final design and full construction execution (exercised upon agreement). Safely construct the facility/project within the agreed GMP and schedule. Assume hazardous materials exist. Address requirements for worker notification, abatement, and disposal. Employ a safety and health professional to provide a HASP per DoDI 6055.01. Comply with Robins Environmental Requirements (Section 01560) submitting Waste Management Report/Landfill Waste Tickets, Solid Waste Disposal Plan, and Qualified Recycling Program (QRP). Appropriately coordinate Stormwater & Erosion Control. Structure execution to allow for payable milestones payments, as well as all other aspects outlined in the SOO. Project-Specific Objectives and Phasing Replace all 15kV, 500MCM cable throughout the distribution of circuit F-01 in its entirety of multiple different installation facilities, while remaining in full operation besides outages and removing and replacing all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. Address specific phasing to accommodate congested areas. OTA & RAPID Framework Approach This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Progressive Design-Build approach under the standalone statutory authority of 10 U.S.C. § 2808a. The Government will be expecting a 100% completed design package and/or specific phasing and repair requirements followed by the completion of the construction or performance of the designed actions. Competitive Selection Process Phase 1 Solution Brief Requirements The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration. Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement. Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 20 November 2026. Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page. Email is the official form of submission for responses. Surety letters may be attached without counting towards 5 page limit. Page format should be 8.5 x 11. The Solution Brief shall include: Cover Page Company name UEI Mailing address Primary point of contact Email address and telephone number Identification of this RAPID AOI Executive Summary, Team Composition, and Organization Summary of the respondent’s qualifications and anticipated delivery capability Explanation of why the team is qualified for the anticipated requirement The team’s understanding of the Robins Air Force Base operational environment The team’s experience working in occupied facilities, congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards. (e.g., hazardous material abatement, and experience with Department of War/Air Force Standards). The team’s proposed approach to Phase 1 collaboration and risk reduction Identification of any material capability, staffing, access, bonding, or teaming assumptions. Past Relevant Construction Capability and Experience Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, adhering to environmental and safety standards.(e.g., hazardous material abatement, and experience with Department of Defense/Air Force Standards). Note that while DoD experience is considered, it will not be a deciding factor in determining a firm more qualified. Financial Capacity and Bonding A statement of financial capacity to perform the anticipated work Current single-project and aggregate bonding capacity, if bonds are anticipated; Name of surety Any other information necessary to demonstrate capacity to perform the anticipated project. Construction Execution and Phasing Approach Methodology for physical work execution Utility outage coordination Evaluation & Selection Criteria The Government will utilize a two-step, Qualifications-Based Selection (QBS) process mapped to the RAPID framework to select the Design-Builder. In accordance with PDB methodology, price will not be evaluated during the initial selection process. Selection is based on qualifications, experience, and collaborative capabilities. Step 1: RAPID Phase 1 Equivalent Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1. Step 2: RAPID Phases 2 Equivalent Interactive Pitch Presentations/Interviews and evaluation of the Phase 1 PDB Price Proposal (short-listed teams only) to determine the final best-value selection. Step 1: Statement of Qualifications Evaluation Factors Factor 1: Past Relevant Experience Minimum Requirement: The Design-Builder (and/or key teaming partner) must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards (e.g., hazardous materials abatement, and experience with Department of War/Air Force Standards). Note: while DoW experience is considered, it will not be a deciding factor in determining a firm more qualified. Factor 2: Team Composition and Organization Focus: The government will evaluate the proposed organization structure, the integration of design and construction personnel from project inception, and the qualifications of Key Personnel. This includes assessing the proposed site superintendent/project managers ability to oversee operations and coordinate with the Government daily. Factor 3: Project Approach and Understanding Focus: The Government will assess the firm’s understanding of the PDB OTA process and their proposed approach to executing Phase 1 (Design and Preconstruction) and Phase 2 (Final Design & Construction). This includes the firm’s strategy for open-book estimating, schedule development, and manage site-specific constraints at Robins AFB (e.g. restricted area access, flightline requirements, and utility outage coordination). Step 2: Pitch Presentation and Price Evaluation (Final Down-Select) The Government may invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day. Factor 1: Collaborative Capability and Cultural Fit Focus: Ability to work in a transparent, “open-book” partnership with the 78 CEG Project Delivery Team (PDT) and Base stakeholders. Factor 2: Real-Time Problem-Solving and Risk Management Focus: Capacity to identify, analyze, and mitigate complex project risks. Evaluated based on response to real-time scenarios presented during the Q&A. Factor 3: Innovative Design-Build Solutions Focus: Creative, value-driven, and cost effective courses of action (COAs) proposed to meet the Government’s mission objectives. Factor 4: Financial Capacity and Bonding Focus: Demonstrated financial capacity to support the anticipated project magnitude and, if required by the final OTA, sufficient bonding capacity. Focus: The estimated magnitude of construction associated with this Area of Interest (AOI) is $5M to $10M. This range is provided for planning purposes only and does not constitute an explicit funding guarantee or disclose the Independent Government Estimate. This range is provided to assist interested offerors in determining the necessary single-project and aggregate bonding capacity required to support the subsequent construction agreement. Final Selection and Award Upon concluding presentations, the evaluation team will select the single most highly qualified Design-Builder. The Government will invite the selection firm to negotiate terms, Scope of Services, and a design/preconstruction fee for the Phase 1 OTA Agreement. The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA. Government Reservations The Government reserves the right to: Invite, not invite, or limit respondents advancing to later phases; Conduct technical exchanges; Request clarifications or supplemental information; Negotiate with one or more respondents; Modify, suspend, or cancel this Special Notice; Issue additional notices or requests; and Make no award. Attachments UHHZ170129 - 01005 - SOO - PDB with OTHER TRANSACTIONAL AUTHORITY F1 Binder UHHZ170129 REV 22-02 base power grid F1 REV 22-02 base power grid 0111 REV 22-02 base power grid-Model F1 compact Send all submissions to: angela.whitley@us.af.mil and kristen.denlinger@us.af.mil Notice of Expanded Opportunity, Follow-On Awards, and Multi-Base Utilization; While the immediate requirement under this AOI is to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA, offerors are advised that participation and successful evaluations under this AOI may provide significant strategic opportunities beyond the initial project. | 69% | Special Notice | 11/20/2026 |
Login at https://piee.eb.mil and search for 'N6945026RJX03' to obtain more details.* | 68% | Solicitation | 08/26/2026 |
The MICC - Fort Drum, is releasing this Draft Request for Proposal (RFP) for a planned Job Order Contract (JOC) under an Indefinite Delivery/Indefinite Quantity (IDIQ) contract, set aside for eligible HUBZone construction firms. This notice is issued for market research and planning purposes only. It does not constitute a formal solicitation, and no award will result from this posting. The Government seeks industry feedback on the draft solicitation documents to improve clarity, feasibility, and competitiveness prior to final release. Interested parties are encouraged to review the attached draft documents and submit comments or questions by April 09, 2026. Submitting Comments or Questions: Email to Joe Taylor at joseph.j.taylor38.civ@army.mil, Jeff Getman at jeffrey.m.getman.civ@army.mil and Milan Sanchez atalfredo.m.sanchez.civ@army.mil. | 66% | Special Notice | 04/09/2026 |
Amendment 0002: The purpose of this amendment is to extend the solicitation closing date from November 19, 2026 to December 1, 2026 at 1:00 PM PST. The Government needs additional time to address the RFIs. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Amendment 0001: This amendment provides the attendees list for the pre-solicitation site visit conducted on October 27, 2026 at Palo Alto VA Medical Center - Menlo Park. The attendees are listed on the attached document named "Site Visit Log 10-27-2026 B-347 Roof Replacement." ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This is a combined synopsis/solicitation for commercial construction prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation No. 36C26127Q0082, Project No. 640A0-27-104, Replace Roof at Building 347 – Menlo Park at Palo Alto VA Medical Center – Menlo Park is issued as a request for quotation. This acquisition is a total SDVOSB set-aside. The closing date of this solicitation is November 19, 2026, 2:00 P.M. PDT. This is a fire-fixed-price construction requirement. The period of performance is 180 calendar days after NTP. The place of performance is Palo Alto VA Medical Center – Menlo Park, 795 Willow Road, Menlo Park, CA 94025-2539. All requests for information (RFI) regarding this RFQ must be submitted in writing and receive no later than November 3, 2026 at 2:00 PM PDT. All RFIs must be submitted via email to Daniel Jhun at daniel.jhun@va.gov. Offerors are encouraged to submit RFIs as early as possible to allow sufficient time for Government review and response. Late RFIs may not be answered by the Government. This procurement is a total service-disabled veteran-owned small business (SDVOSB) set-aside. NAICS Code is 236220 – Commercial and Institutional Building Construction; Small Business Size Standard: $45M. Bid bonds, payment and performance bonds are required under this solicitation and resultant contract. A bid guarantee in the form of a bid bond must be submitted with the proposal before the deadline. Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of performing these services. In no event shall failure to inspect the site constitute grounds for a claim after contract award. A site visit has been scheduled on Tuesday, October 27, 2026 at 09:00 A.M. PDT at the front of Building 347, Palo Alto VA Medical Center – Menlo Park, 795 Willow Road, Menlo Park, CA 94025-2539. A comparative analysis approach will be used by a team of Government Technical personnel in accordance with Revolutionary FAR Overhaul (RFO) FAR 12. 203(c)(2) The Government intends to award one (1) contract as a result of this solicitation. In using the comparative analysis approach, the Government will employ business judgement and a comparative evaluation of quotations to determine which quotation represents the best value and the best overall offer to the Government. In accordance with RFO FAR 12.203(c)(2), quotation will be evaluated through a direct comparison of one quotation against another in a uniform manner to determine which quotation best satisfies the Government’s requirements as identified in the RFQ. Award may be made to an offeror other than the lowest-priced offeror or the highest-rated offeror under the non-priced factors when the Government determines that the benefits of a higher-rated quotation warrant any associated price premium. The Government reserves the right to select a quotation that exceeds the minimum requirements of the RFQ when the additional value provided is determined to be beneficial to the Government. DBA Wage Determination No. CA20260018 dated 20260917 is applicable to this solicitation and project. | 65% | Combined Synopsis | 12/01/2026 |
The purpose of Solicitation Amendment 0002 is to: 1. Update Exhibits D, E, and F. 2. Provide additional responses to industry questions within Attachment 17 - Ft. Stewart JOC Solicitation Q A_ Updated 22 June 2026. 3. Update Section M, paragraphs 2.3.1 and 2.3.2.a. All other items and conditions remain unchanged, including the proposal due date, which remains 9 July 2026. ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------The purpose of Solicitation Amendment 0001 is to: 1. Update Section L, Table 3.1.1 and paragraph 8.1.2.3. 2. Provide the Government response to industry questions within Attachment 17 - Ft. Stewart JOC Solicitation Q A_18 June 2026. All other items and conditions remain unchanged, including the proposal due date, which remains 9 July 2026. -----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------PROJECT TITLE: FT. STEWART JOCPROJECT LOCATION: FT. STEWART, GEORGIATHE MISSION AND INSTALLATION CONTRACTING COMMAND - INSTALLATION READINESS CENTER (MICC-IRC) HAS A REQUIREMENT FROM THE DIRECTORATE OF PUBLIC WORKS (DPW) AT FORT STEWART AND HUNTER ARMY AIR FIELD (HAAF) GEORGIA, TO SELECT A CONTRACTOR TO PROVIDE ALL PERSONNEL, EQUIPMENT, TOOLS, MATERIALS AND SUPERVISION REQUIRED TO SUPPORT SUSTAINMENT, RENOVATION AND MODERNIZATION CONSTRUCTION SERVICES TO INSTALLATION FACILITIES AND COMPONENTS THROUGHOUT THE US ARMY?S FORT STEWART AND HUNTER AMY AIR FIELD (HAAF) AREA IN THE STATE OF GEORGIA WITH A CONTRACT TERM OF A 5-YEAR ORDERING PERIOD. THIS OVERALL GOAL OF THIS CONTRACT IS TO PROVIDE THE GARRISON COMMANDER AND THE DIRECTORATE OF PUBLIC WORKS (DPW) THE CAPABILITY TO PROVIDE TIMELY AND QUALITY SUSTAINMENT, RENOVATION AND MODERNIZATION CONSTRUCTION SUPPORT SERVICES FOR THE FACILITIES AND COMPONENTS WHICH SUPPORT THE SOLDIERS, FAMILY MEMBERS AND CIVILIANS OF THE 3RD INFANTRY DIVISION. | 65% | Solicitation | 07/09/2026 |
Additional Details
Solicitation Number
1630DC-17-R-00003
Archive Date
Jun 25, 2019