Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM EDT
- Posted
- June 24, 2026
- Notice type
- Presolicitation
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTH ATLANTIC.ENDIST BALTIMORE.W2SD ENDIST BALTIMORE
- Place of performance
- Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD, Baltimore, Maryland, 21201
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W912DR26BA004
- Notice ID
- 18e03af0511649618a9b8034d17e6451
Description
The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027.
The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1-2 foot of allowable over depth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility.
The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 – 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 – 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
THE SOLICITATION IS SCHEDULED TO BE RELEASED ON/OR ABOUT 10 July 2026.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Links (4)
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1PresolicitationCurrent
Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD
Other notices for this solicitation
- Market ResearchRelated noticeMar 19, 2026
FY26 Q4 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed. THE SOLICITATION IS SCHEDULED TO BE RELEASED ON/OR ABOUT 10 JULY 2026. | 97% | Pre-Solicitation | 07/10/2026 |
DESCRIPTION OF WORK: The work consists of maintenance dredging of approximately 4,287,000 cubic yards (BASE), and 350,000 cy (OPTION) of unclassified material from the Charleston Lower Harbor which shall be deposited in the Charleston Ocean Dredged Material Disposal Site (ODMDS). The work is located in Charleston and Berkeley Counties, South Carolina. The work includes complying with the requirements of the Endangered Species Act and Marine Mammals Protection Act. MAGNITUDE OF WORK is estimated between $25,000,000 TO $40,000,000. North American Industry Classification System (NAICS) Code: 237990 Other Heavy and Civil Engineering Construction with an SBA Small Business Size of $37,000,000. The Solicitation is hereby posted as of 11 June 2026. Amendment 01 is hereby posted as of 30 June 2026. Amendment 02 is hereby posted as of 9 July 2026. Amendment 03 is hereby posted as of 9 July 2025. Amendment 04 is hereby posted as of 10 July 2025. | 88% | Solicitation | 07/14/2026 |
This solicitation amendment is issued solely to correct the CLIN structure. It establishes base items under CLINs 0001 through 0009AB, and option items under CLINs 0010 through 0017. No changes have been made to the technical specifications or drawings. | 88% | Solicitation | 07/01/2026 |
PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans and specifications, instructions to offerors, and the evaluation factors/basis for award. OFFERORS ARE RESPONSIBLE FOR MONITORING THIS WEBSITE FOR CHANGES TO THIS NOTICE AND THE FORMAL SOLICITATION ANNOUNCEMENT.PLANNED SOLICITATION: The final Solicitation for this project will be announced anytime between 15 and 30 days after the posting of this pre-solicitation. The contract type will be firm-fixed-price. DESCRIPTION OF WORK: The work consists of maintenance dredging of approximately 3,298,000 cubic yards (BASE), and 1,180,000 cy (OPTION) of unclassified material from the Charleston Lower Harbor which shall be deposited in the Charleston Ocean Dredged Material Disposal Site (ODMDS). The work is located in Charleston and Berkeley Counties, South Carolina. The work includes complying with the requirements of the Endangered Species Act and Marine Mammals Protection Act. . MAGNITUDE OF WORK is estimated between $25,000,000 TO $40,000,000. North American Industry Classification System (NAICS) Code: 237990 Other Heavy and Civil Engineering Construction with an SBA Small Business Size of $37,000,000. | 88% | Pre-Solicitation | Open |
The Savannah Inner Harbor Dredging Contract provides construction services, including furnishing personnel, transportation, mobilization/demobilization, equipments/materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge, the duration is expected to be one year from Notice to Proceed. Up to five million, six hundred thousand cubic yards of maintenance material is expected to be removed from the inner harbor. The work is located in the deep draft Savannah Harbor navigation project in Georgia in the vicinity of Chatham County, Georgia (GA) / Jasper County, South Carolina (SC). The Savannah Inner Harbor channel is 47 ft. deep MLLW / 500 ft. wide to the upper end of Kings Island Turning Basin: 36 ft. deep MLLW / 400 ft. wide to the upper end of Argyle Island Turning Basin; 30 ft. deep MLLW 200 ft. wide to the upper limit of the project. Savannah Harbor?s Kings Island Turning Basin (KITB) is the primary turning basin for large civilian / military ships, lying adjacent to the Georgia Ports Authority docks. KITB requires dredging twice a year to allow the loaded ships to freely turn when using the port. Up to 1.5 million cubic yards of maintenance material are removed from the KITB annually.Other contractor(s) may be working for the Savannah District on the Savannah Harbor, to include confined upland dredged material containment areas / designated staging areas. If such work occurs, the contractors shall coordinate activities under the direction of the Contracting Officer.A majority of the material dredged from the Savannah Inner Harbor must be placed in upland confined disposal areas adjacent to the Savannah River. Savannah confined upland disposal areas DMCAs 12A, 13A, 13B / Jones Oysterbed Island are owned by local sponsor Georgia Department of Transportation. Disposal areas DMCAs 14A / 14B are owned by the Joint Project Office of the Georgia / South Carolina Port Authorities. Portions of DMCAs 2A / Jones/Oysterbed are owned by the Georgia Department of Transportation / the US Fish / Wildlife Service. DMCA 1N is owned entirely by the US Fish / Wildlife Service. The Federal Government holds existing easements on all confined upland disposal areas in the Savannah Harbor except DMCA 1N which has a Memorandum of Understanding. Environmental windows limit the timing of dredging in the Savannah Inner Harbor. The environmental windows in Savannah include a Striped Bass spawning window between dates 1 April through 15 May which limits the amount / timing of dredging above station 63+360 (River Mile 12), / a dissolved oxygen window (approximately July 1 through September 30). To protect sturgeon aggregation areas in the upper river, no dredging is allowed above STA 105+500 1 May through 31 October. Certain reaches of O/M sediments may contain cadmium (Cd) in levels significant enough to harm foraging avian species in the DMCAs. Therefore, O/M sediments in those reaches will be tested by the Government prior to dredging. If Cd is found in those sediments equal to or greater than 14 mg/kg, then options will be exercised that include disposal of the sediments in specific DMCAs under special handling conditions.Obstructions are objects or materials in the required side slope cross sections or in the existing ground surface which are unknown at the time of encounter by the dredge or identified by pre / post hydrographic surveys, / monthly condition surveys. Obstructions are objects which cannot be removed by a hydraulic pipeline dredge. The Contractor may encounter obstructions during dredging operations / must remove the objects or materials to provide the required section as shown on the cross-section plates. If the Contractor is performing maintenance dredging with a pipeline dredge, the dredge must act as a probe for obstructions. The object removed will be the property of the Contractor unless it has been determined to be culturally significant. The base contract will include mobilization/demobilization, maintenance dredging, moves, dive team diving, / equipment rental for obstruction removal. Contract options include Cd dredging with placement to the backside of DMCA 14B / maintenance dredging as cap material placed on top of the Cd dredged material. | 88% | Pre-Solicitation | 05/28/2026 |
Additional Details
Solicitation Number
W912DR26BA004
Archive Date
Dec 10, 2026
Office Address
BALTIMORE, MD, 21201-2526