Country Club west Stoplog Rehabilitation
Archived on September 25, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM MDT
- Posted
- August 22, 2026
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- International Boundary and Water Commission
Notice details
- Office
- INTERNAT BOUNDARY AND WATER COMM
- Place of performance
- El Paso, Texas, 79902
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 191BWC26B0013
- Notice ID
- a3e42c848e13421395944c3830ab438f
Description
Added Amendment I
This is a 100% small business set-aside with a small business size standard of $45M.
An offer guarantee is not required.
Add pre-bid conference notes and sign-in log.
Added SF 1442 to attachements
The United States Section of the International Boundary and Water Commission (USIBWC) requires rehabilitation of the Country Club Bridge West Stoplog Structure located in El Paso, TX. The project includes mobilization, traffic control, removal and replacement of the existing expansion joint, repair of deteriorated concrete, roadway restoration, disposal of construction debris, and final cleanup. These repairs are necessary to restore movement between the roadway and stoplog structure, reduce continued deterioration, and maintain a safe and serviceable bridge approach.
See attachments
Standard Form 1442 will be added by amendment.
The Contractor shall furnish all labor, material, and equipment necessary to complete Country Club West Stoplog Rehabilitation. This is a FIRM FIXED PRICE CONTRACT.The estimated magnitude of this project will be $25,000.00 to $100,000.00.
L.01 - Pre-Bid Conference and Site Visit
L.01.A. All potential bidders are requested to attend the Pre-Bid Conference/Site Visit to be held at: USIBWC AmericanDam Field Office, Conference Room, 2616 W Paisano Dr., El Paso, TX 79922 Tuesday, August 18, 2026, at 9:30 AMMDT.
L.01.B. Names of individuals who plan to attend shall be furnished before 12:00 PM MDT on Monday, August 17, 2026 byemail submission to Philip.johnson@ibwc.gov .
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Contract end date
Mar 31, 2027
NAICS
237310
Agency
International Boundary And Water Commission: U.S.-Mexico
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (17)
- Download
191BWC26B0013 Amendment I.pdf
563 KBAdded in Solicitation version 7Posted - Download
191BWC26B0013 SF 1442.pdf
137 KBAdded in Solicitation version 5Posted - Download
Sunland Bridge West Stoplog Shop Dwg_Flood Control Intl.pdf
494 KBAdded in Solicitation version 4Posted - Download
Wage Determination Highway TX20260293 20260518.pdf
196 KBAdded in Solicitation version 4Posted - Download
Arcadis_Sunland Levee Repair Design Report_20220204.pdf
47 MBAdded in Solicitation version 4Posted - Download
Excerpts 191BWC22C0011 Sunland Levee Dwgs.pdf
18 MBAdded in Solicitation version 4Posted - Download
191BWC26B0013 CC West Stoplog Rehab Drawings 20260806.pdf
7.7 MBAdded in Solicitation version 4Posted - Download
Country Club West Rehab_Damage Report_USIBWC_20260610.pdf
4.5 MBAdded in Solicitation version 4Posted - Download
191BWC26B0013 CC West Stoplog Rehab Specs 20260806.pdf
2.5 MBAdded in Solicitation version 4Posted - Download
IBWC22M0005 MOA Country Club Floodgates.pdf
1.0 MBAdded in Solicitation version 4Posted - Download
Country Club West_Repair Recommendation_Arcadis_20250808.pdf
318 KBAdded in Solicitation version 4Posted - Download
FXSA_Survey Report_20220303.pdf
268 KBAdded in Solicitation version 4Posted - Download
IBWC_Form_110_Cert_of_Authority_for_Signing.pdf
217 KBAdded in Solicitation version 4Posted - Download
IBWC Form 245 Minimum Quals for Award.docx
58 KBAdded in Solicitation version 4Posted - Download
IBWC Form 245B Backup Information.pdf
60 KBAdded in Solicitation version 4Posted - Download
IBWC Form 245A Minimum Quals for Award-Joint Venture.docx
54 KBAdded in Solicitation version 4Posted - Download
IBWC_Form_116_Statement_of_Equipment.pdf
19 KBAdded in Solicitation version 4Posted
Lifecycle
- 3Version 3PresolicitationArchived
Country Club west Stoplog Rehabilitation
- 4Version 4SolicitationArchived
Type changed from Presolicitation to Solicitation
Country Club west Stoplog Rehabilitation
- 5Version 5SolicitationArchived
Country Club west Stoplog Rehabilitation
- 7Version 7SolicitationArchivedCurrent
Country Club west Stoplog Rehabilitation
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
ACCESS ROAD CONSTRUCITON OF 8R MIDFIELD RVR AND 15L RO RVR, GEORGE BUSH INTERCONTINENTAL, HOUSTON, TEXAS THIS IS A 2-TIERED SOLICITATION. PREFERENCE IS FIRST GIVEN TO SBA CERTIFIED SMALL BUSINESSES AND THEN FULL AND OPEN IF THERE IS INSUFFICIENT COMPETITION- PLEASE SEE SECTIONS L AND M FOR MORE INFORMATION. ESTIMATED START DATE IS 8/2/27- PLEASE SEE ATTACHED SOLICITATION AND ATTACHMENTS FOR FURTHER DETAILS | - | Solicitation | 01/14/2027 |
PROJECT NUMBER: TX FW LGA 10(5) PROJECT NAME: Steve Thompson Wildlife Drive PROJECT DESCRIPTION: The proposed project is in Laguna Atascosa National Wildlife Refuge in Cameron County, Texas approximately 25 miles east of Harlingen, Texas. The existing terrain is flat. SCOPE OF THE WORK: The proposed project includes full depth reclamation of existing driving surface which includes chip seal material, and existing gravel. After completing full-depth reclamation new aggregate surface course will be added to create a driving surface that has a consistent width. The project also includes installation of aluminum gate and a small concrete pad and safety improvement signs and speed bumps. The project includes three (3) alternate bid items for Aggregate Surface Course (TON) with one (1) being awarded. Alternate 1: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area. Alternate 2: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive. Alternate 3: 3-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area. | - | Solicitation | 11/03/2026 |
The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Repair of Sergeant Major Boulevard at Fort Bliss, Texas. | - | Solicitation | 09/15/2026 |
The proposed project is a 100% Small Business Set-Aside for a Design-Bid-Build Construction contract for Repair of Sergeant Major Boulevard at Fort Bliss, Texas. | - | Awarded | Open |
Proposed Solicitation Number ? W9126G26RA107 posted on or about 18 August 2026. Estimated Solicitation closing date of 18 September 2026 Description - The work includes providing all management, labor, tools, equipment, materials and incidentals to perform the following work at the Aquilla Dam Crest located 6 miles Northeast of Aquilla, TX and at Lofers Day Use, Lofers West, and McCown Valley Parks at Whitney Lake, Clifton, TX. | - | Pre-Solicitation | 08/18/2026 |
Additional Details
Solicitation Number
191BWC26B0013
Archive Date
Sep 25, 2026
Office Address
El Paso, TX, 79902