GovChime
Notice ID: d70f1b2f1379477b9ec44378f74a0517SolicitationArchived

NIWTP Biosolids Sludge Dryer Alternative Building D/B

Archived on September 5, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM MDT
Posted
September 25, 2026
Notice type
Solicitation
Set-aside
No Set aside used
NAICS
236220: Commercial and Institutional Building Construction
Agency
International Boundary and Water Commission

Notice details

Office
INTERNAT BOUNDARY AND WATER COMM
Place of performance
Rio Rico, Arizona, 85648
PSC
Y1PD: CONSTRUCTION OF WASTE TREATMENT AND STORAGE FACILITIES
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
191BWC26R0010
Notice ID
d70f1b2f1379477b9ec44378f74a0517

Description

Note: The Government has determined it is in its best interest to cancel the current procurement.

------------------------------------------------------------------------------------

See Revised SOW

-------------------------------------------------------------------------------------

Note: Due date for proposals is extended to August 21, 2026. Due date for questions is extended to August 3, 2026. The 3PM deadline remains the same.

-------------------------------------------------------------------------------------

Note: Time for site visited has been corrected to 10AM Arizona Time.

--------------------------------------------------------------------------------------

The USIBWC is issuing a Solicitation (negotiated) for the design and construction (design-build) of the Sludge Dryer Building within the USIBWC’s Nogales International Wastewater Treatment Plant Project, in Rio Rico, Santa Cruz County, Arizona.  This new building shall house the sludge dryer purchased for the plant.

  1. Description of the Work:
  2. Work as noted in the SOW:
  • The project includes:
  • Design and construction of a new building to accommodate the sludge dryer system and associated equipment.
  • Demolition of the existing belt filter presses and related polymer system components (excluding concrete foundations, overhead structure, and electrical motor control centers).
  • Relocation of an existing three-sided metal structure.
  • All associated site work, utilities, permitting, and commissioning to deliver a fully operational, code-compliant, and ready-to-use facility.
  • The final product shall be a fully commissioned, turn-key building with all required utilities (water, sanitary sewer, communications, electrical, fire protection, etc.) and site improvements, ready for immediate use upon completion.
  • 2. Project Location
  • Nogales International Wastewater Treatment Plant
    Santa Cruz County, Arizona
    (31°26'56.58"N, 110°57'49.33"W)
  • 3. Procurement Approach
  • Type: Design-Build (DB)
  • Contract Structure: Firm Fixed Price
  • Period of Performance: 365 calendar days after Notice to Proceed (NTP)
  • Set-Aside: The Government anticipates a small business set-aside, subject to market research results.
  • 4. Scope of Work Highlights
  • Phase 1: Design
    • Site investigation, surveying, geotechnical investigations, and design development.
    • Preparation of construction documents, technical specifications, and all required reports.
    • Coordination with stakeholders and regulatory agencies.
  • Phase 2: Construction
    • Site preparation, demolition, and relocation activities.
    • Construction of the new sludge dryer building and installation of all required systems.
    • Quality control testing, commissioning, and project closeout.
  • Compliance:
    • All work must comply with federal, state, and local codes, including NEPA, OSHA, ADA/ABAAS, and applicable environmental and safety regulations.
    • The contractor is responsible for all required permits and coordination with utility providers.
  • 5. Submission Requirements (When Solicitation is Issued)
  • Interested offerors will be required to submit:
  • Qualifications and relevant experience with similar design-build projects.
  • Technical approach and project management plan.
  • Past performance information.
  • Price proposal.
  • NDA for Site visit
  • 6. Anticipated Timeline
  • Solicitation Release:  16, 2026
  • Site Visit: July 24, 2026 at 10 AM Local. An NDA is required.
  • Questions due: July 29, 2026 at 3 PM MDT.
  • Proposal Due Date: August 14, 2026 at 3PM MDT.
  • 7. Additional Information
  • This notice is  a request for proposals. The solicitation, specifications, and drawings will be made available on SAM.gov.
  • Magnitude is between $1 million and $5 million.
  • All interested parties are encouraged to monitor SAM.gov for updates.
  • Questions regarding this notice may be submitted via email to the Contracting Officer listed in the forthcoming solicitation.

A site visit is scheduled for July 24, 2026, at 10AM local time. Names of individuals who plan to attend along with an IBWC Form 358 Non-Discloser Agreement (NDA) shall be furnished before 3:00 PM MDT (CO’s local time) on Wednesday, July 22, 2026, by email submission to seone.jones@ibwc.gov.  PPE will be required for this site visit (hard hat, safety shoes and vest). IBWC will not provide PPE. A maximum of 2 per company will be allowed. Vendors must check in with a valid ID at the administration building and let them know they are attending a site visit/walk through. All visitors must be escorted by IBWC personnel.

Photos/videos will be allowed with some restrictions. No photos of gates, fences, security features such as cameras, access points or IBWC personnel are allowed on this site visit. Only photos/video of the current sludge drying equipment will be allowed. An NDA (IBWC_Form_358_Nondisclosure_Agreement - NIWTP Biosolids Sludge Dryer Alternative Building D/B.pdf) will need to be completed prior to the site visit. Potential bidders can complete an NDA at the Pre-Proposal Conference/Site Visit.

All work is proposed to be completed within three hundred and sixty (365) calendar days after the Notice to Proceed. 

The time for completion of final paperwork is included in the three hundred and sixty (365) calendar days.  The time stated for completion shall include final cleanup of the premises.  The final design and construction Contract durations will be negotiated with Offerors during the Phase Two technical proposal evaluations.

The Solicitation will be issued pursuant to FAR Subpart 36.3 - Two-Phase Design-Build Selection Procedures.  Phase One shall include evaluation of technical qualifications and capability to perform and Phase Two shall include evaluation of technical proposal and price.

Prospective bidders shall be registered in the System for Award Management (SAM) with an active Unique Entity Indentifier (UEI) in order to be eligible to receive an award from solicitation and have the NAICS code listed above under Reps & Certs. For more information, visit the website at https://www.sam.gov.

Notification of any changes or amendments to the Solicitation will be issued only at https://www.sam.gov. It is the prospective bidder's responsibility to check the website daily for any updates, amendments or any additional information. The Government will not be held responsible for any information a prospective bidder does not receive once the information is issued on the Internet.

All responsible sources must submit a bid to be considered by the Agency.

Attachment

191BWC26R0010.pdf 

SOW NIWTP Biosolids Sludge Dryer Alternative Building DB.pdf 

IBWC Form 358 Nondisclosure Agreement - CUI.pdf 

RRFTP-0027- EQUIP. DIST.& DETAILED LAYOUTS-2026.06.07.pdf 

2006 Geotech Report - MLE Improvements.pdf 

AZ0025607_NIWTP_Final_Permit_Red.pdf 

Nogales_Asbestos_and_Lead-Paint_Survey.pdf 

NIWTP_Upgrade-Expansion_EA.pdf 

NIWTP Location Maps.pdf 

NIWTP_Upgrade-Expansion_FONSI.pdf 

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Seone Michael Jones

Documents

Files (13)

  • 191BWC26R0010 Pre-Bid Meeting Sign-in for 7-24-26.pdf

    407 KBAdded in Solicitation version 12Posted
    Download
  • NIWTP Biosolids Sludge Dryer Alternative Building 08-07-26.pdf

    3.5 MBAdded in Solicitation version 8Posted
    Download
  • 191BWC26R0010 0002.pdf

    102 KBAdded in Solicitation version 5Posted
    Download
  • 191BWC26R0010 0001.pdf

    175 KBAdded in Solicitation version 3Posted
    Download
  • 191BWC26R0010.pdf

    315 KBAdded in Solicitation version 2Posted
    Download
  • IBWC Form 358 Nondisclosure Agreement - CUI.pdf

    136 KBAdded in Solicitation version 2Posted
    Download
  • RRFTP-0027- EQUIP. DIST.& DETAILED LAYOUTS-2026.06.07.pdf

    10 MBAdded in Solicitation version 2Posted
    Download
  • 2006 Geotech Report - MLE Improvements.pdf

    7.9 MBAdded in Solicitation version 2Posted
    Download
  • AZ0025607_NIWTP_Final_Permit_Red.pdf

    5.8 MBAdded in Solicitation version 2Posted
    Download
  • Nogales_Asbestos_and_Lead-Paint_Survey.pdf

    4.1 MBAdded in Solicitation version 2Posted
    Download
  • NIWTP Location Maps.pdf

    803 KBAdded in Solicitation version 2Posted
    Download
  • NIWTP_Upgrade-Expansion_EA.pdf

    459 KBAdded in Solicitation version 2Posted
    Download
  • NIWTP_Upgrade-Expansion_FONSI.pdf

    42 KBAdded in Solicitation version 2Posted
    Download

Lifecycle

  1. 6
    Version 6PresolicitationArchived

    NIWTP Biosolids Sludge Dryer Alternative Building D/B

    Notice 70f1ce2c2492494f94325a68cb385f05 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    NIWTP Biosolids Sludge Dryer Alternative Building D/B

    Notice 6201faf91f7b4b3bb27ba411d70ca371 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    NIWTP Biosolids Sludge Dryer Alternative Building D/B

    Notice 85626af542974fd0ad282d3f1f0be22a on SAM.gov

  4. 4
    Version 4SolicitationArchived

    NIWTP Biosolids Sludge Dryer Alternative Building D/B

    Notice a3a5e76ef3a9472b99a4f13bad6b543a on SAM.gov

  5. 5
    Version 5SolicitationArchived

    NIWTP Biosolids Sludge Dryer Alternative Building D/B

    Notice 33b0a5e820c444e1b9bf7d44302446f8 on SAM.gov

  6. 8
    Version 8SolicitationArchived

    NIWTP Biosolids Sludge Dryer Alternative Building D/B

    Notice 9fa02896dabd43aead65101aea9ff8f4 on SAM.gov

  7. 9
    Version 9SolicitationArchived

    NIWTP Biosolids Sludge Dryer Alternative Building D/B

    Notice 40de186a141642ed8d5f60d868751c57 on SAM.gov

  8. 10
    Version 10SolicitationArchived

    NIWTP Biosolids Sludge Dryer Alternative Building D/B

    Notice 4d5290882afe471eafdfce5198399f08 on SAM.gov

  9. 12
    Version 12SolicitationArchived

    NIWTP Biosolids Sludge Dryer Alternative Building D/B

    Notice aa4c5f2525c04895ada1c8d853ad4536 on SAM.gov

  10. 13
    Version 13SolicitationArchived

    NIWTP Biosolids Sludge Dryer Alternative Building D/B

    Notice 899f706f0dd347b5af6deab800d5c293 on SAM.gov

  11. 15
    Version 15SolicitationArchivedCurrent

    NIWTP Biosolids Sludge Dryer Alternative Building D/B

    Notice d70f1b2f1379477b9ec44378f74a0517 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

191BWC26R0010

Archive Date

Sep 5, 2026

Office Address

El Paso, TX, 79902