GovChime
Notice ID: 09716b10f23e43bab29f28fa31245b0dSolicitationArchived

DOS Domestic Light Construction Multiple Award IDIQ Requirement

Archived on March 7, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM EST
Posted
February 19, 2026
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
NAICS 236 Construction of Buildings (reported as 236000)

Notice details

Office
ACQUISITIONS - AQM MOMENTUM
Place of performance
North Charleston, South Carolina, 29405
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Notice ID
09716b10f23e43bab29f28fa31245b0d

Description

*Amendment 03 - Issued February 11, 2026

*Amendment 02 - Issued February 4, 2026

*Amendment 01 - Issued on January 22, 2026

This is the formal notice for the Rerquest for Proposals for the Department of State's Domestic Light Construction Multiple Award IDIQs. Questions are due no later than January 27, 2026 by close of business. Any questions received after this date may not be answered. Proposals are due February 11, 2026 by 4:00pm ET. Any proposals received after this date and time will not be considered for award and will be returned. 

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Ryan C. Edwards

Secondary Contact

Meghan Klipfel (Knapp)

Documents

Files (14)

  • 19AQMM26R0012 0003.pdf

    23 KBAdded in Solicitation version 7Posted
    Download
  • QA 3.docx

    16 KBAdded in Solicitation version 7Posted
    Download
  • 19AQMM26R0012 0002.pdf

    298 KBAdded in Solicitation version 6Posted
    Download
  • QA 2.docx

    104 KBAdded in Solicitation version 6Posted
    Download
  • Attachment 1 - Statement of Work (revised).docx

    155 KBAdded in Solicitation version 6Posted
    Download
  • Attachment 2 - Section B Pricing Spreadsheet (revised).xlsx

    39 KBAdded in Solicitation version 9Posted
    Download
  • 19AQMM26R0012 00001.pdf

    63 KBAdded in Solicitation version 5Posted
    Download
  • QA 1.docx

    20 KBAdded in Solicitation version 5Posted
    Download
  • 19AQMM26R0012.pdf

    302 KBAdded in Solicitation version 4Posted
    Download
  • Attachment 1 - Statement of Work (Working).docx

    155 KBAdded in Solicitation version 4Posted
    Download
  • Attachment 3 - DOS Fed Facilities.xlsx

    22 KBAdded in Solicitation version 4Posted
    Download
  • Attachment 4 - Public Release of Information 20250219.pdf

    317 KBAdded in Solicitation version 4Posted
    Download
  • Attachment 5 - Past Performance Questionnaire.docx

    28 KBAdded in Solicitation version 4Posted
    Download
  • Synopsis.docx

    21 KBAdded in Presolicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3PresolicitationArchived

    DOS Domestic Light Construction Multiple Award IDIQ Requirement

    Notice 3befbb514560428fa77145effcb42fbc on SAM.gov

  2. 4
    Version 4SolicitationArchived

    Type changed from Presolicitation to Solicitation

    DOS Domestic Light Construction Multiple Award IDIQ Requirement

    Notice 5b9c70a1d3f9423d94049cc15e61b06e on SAM.gov

  3. 5
    Version 5SolicitationArchived

    DOS Domestic Light Construction Multiple Award IDIQ Requirement

    Notice 6900e4e122d64ac7ad5ea73f9e72cc99 on SAM.gov

  4. 6
    Version 6SolicitationArchived

    DOS Domestic Light Construction Multiple Award IDIQ Requirement

    Notice ae16a0df50a849eaa0542909ecd9b0fb on SAM.gov

  5. 7
    Version 7SolicitationArchived

    DOS Domestic Light Construction Multiple Award IDIQ Requirement

    Notice 4cf7daf4a03b4ec69ab4c379dc86c381 on SAM.gov

  6. 9
    Version 9SolicitationArchivedCurrent

    DOS Domestic Light Construction Multiple Award IDIQ Requirement

    Notice 09716b10f23e43bab29f28fa31245b0d on SAM.gov

  7. 16
    Version 16Award NoticeArchived

    Type changed from Solicitation to Award Notice

    DOS Domestic Light Construction Multiple Award IDIQ Requirement (National Capital Region only)

    Notice 37dd2eb3f00041338c896ca26276886d on SAM.gov

  8. 17
    Version 17Award NoticeArchived

    DOS Domestic Light Construction Multiple Award IDIQ Requirement (National Capital Region only)

    Notice b32f3ebcc55940b3a814c6e0d98d71f8 on SAM.gov

  9. 20
    Version 20Award NoticeArchived

    DOS Domestic Light Construction Multiple Award IDIQ Requirement (National Capital Region only)

    Notice 222878cfb35c4118b967c70ac4cb42f7 on SAM.gov

  10. 21
    Version 21Award NoticeArchived

    DOS Domestic Light Construction Multiple Award IDIQ Requirement (National Capital Region only)

    Notice ac79ece6aea14d8ba7bca28d3da2c7d3 on SAM.gov

  11. 24
    Version 24Award NoticeArchived

    DOS Domestic Light Construction Multiple Award IDIQ Requirement (National Capital Region only)

    Notice 30cb65b1418147db8d6f20d01a090a6d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Delivery and installation of 12 prefabricated modular buildings & Electrical upgrades at the U.S Embassy Pretoria Annex.
47%
Sole Source / J&AOpen
***ANNOUNCEMENT OF SHORTLISTED OFFERORS*** October 19, 2026 – The shortlisted offerors selected for Specialized Mission Training Facility (SMTF) in Laurel, MD listed in alphabetical order are as follows: Balfour Beatty, 3180 Fairview Park Drive, Suite 200, Falls Church, GA 22042 Point of Contact: Layli Pietri, Phone: (571) 330-3153, Email Address: lpietri@balfourbeattyus.com Clark Construction, 7900 Westpark Drive, Suite T300, McLean, VA 22102 Point of Contact: Mike Levy, Phone Number: 301-708-6474, Email address: Michael.Levy@clarkconstruction.com Grunley, 15020 Shady Grove Road, Suite 500, Rockville, MD 20850 Point of Contact: Erik Carlson, Director of Preconstruction Services, Phone Number: 240.399.0793 (office) | 202.495.9652 (mobile), Email Address: erikcarlson@grunley.com Hensel Phelps, 1600 Tysons Boulevard, Suite 800, Tysons Corner, VA 22102 Point of Contact: Justice Henecke, Chief Estimator, Phone Number: 703.720.4900, Email address: jhenecke@henselphelps.com HITT, 2900 Fairview Park Drive, Falls Church, VA 22042 Point of Contact: Alex Nesterczuk, Project Executive, Phone: 843.323.7467, Email Address: anesterczuk@hitt-gc.com Whiting Turner, 4600 River Road, Suite 200, College Park, MD 20737 Point of Contact: Mike Sellman, Phone: (443) 506-5754, Email Address: Mike.sellman@whiting-turner.com Businesses who are interested in partnering or subcontract opportunities should contact the above firms directly. ====================================================================================== AMENDMENT 0005 is hereby added to the solicitation =================================================================================== AMENDMENT 0004 is hereby added to the solicitation ====================================================================================== AMENDMENT 0003 is hereby added to the solicitation: The due date is changed from August 12, 2026, to August 26, 2026. ====================================================================================== AMENDMENT 0002 is hereby added to the solicitation. ======================================================================================= AMENDMENT 0001 is hereby added to the solicitation. ======================================================================================= The General Services Administration (GSA) Public Buildings Service (PBS) is seeking a qualified contractor to provide the construction of a Specialized Mission Training Facility (SMTF) in Laurel, MD. Summary: This project includes building the SMTF at the James J. Rowley Training Center (JJRTC), which is the primary training facility for the United States Secret Service (USSS). The training center consists of multiple buildings and structures that provide an environment for various training activities, including active scenario training, as well as classroom and conference room space. Due to increased operational tempo, development of new training programs, and campus population growth in recent years, the USSS continues to develop the JJRTC campus to meet the needs of the USSS mission. To enhance training activities and operational readiness, the USSS intends to construct a full-scale site and building representation of the White House, perimeter buildings, and grounds. The services requested by the contractor shall cover a wide range of construction activities including management, supervision, labor, equipment, and materials required to provide construction and other related services necessary to construct the new facilities. Related services include, but are not limited to, site planning, utilities, testing and inspection during construction, commissioning, and potential additional analysis of the site. The scope of work for the SMTF project is pursuant to FAR 15.103 (GSA Class Deviation RFO-2025-15) and FAR 36 (GSA Class Deviation RFO-2025-36). The resultant contract will be firm fixed price. The estimated cost range for construction is between $260,000,000.00 and $290,000,000.00. The intended project delivery method is a Phased Acquisition procurement using a Two-Phase Construction Concept. AMENDMENTS TO SOLICITATION: It is the offeror's responsibility to monitor SAM.gov for the release of any amendments. BONDING: A bid bond is required in Phase 2 as well as payment and performance bonds after award. SECURITY: Before employees are allowed to work under the anticipated contract, all personnel are required to pass a security check. Specific security requirements will be contained in the solicitation. FUNDS AVAILABILITY: Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government arises until award of the contract. ELIGIBLE OFFERORS: All responsible business firms may submit a proposal which shall be considered by the agency. All prospective offerors are also required to use the System for Award Management at SAM.gov for registering their firm and completing representations and certifications. Any questions regarding this notification shall be directed to Marsha Howard, Contracting Officer, via marsha.howard@gsa.gov. Potential offerors are responsible for monitoring and downloading the solicitation and any potential amendments, if any, to the solicitation.
47%
Solicitation08/26/2026
This is a pre-solicitation notice and not a request for proposals. As such, vendors are not to send capability statements or other such documents. The General Services Administration (GSA) Public Buildings Service (PBS) is seeking a qualified contractor to provide the construction of a Specialized Mission Training Facility (SMTF) in Laurel, MD. Summary: This project includes building the SMTF at the James J. Rowley Training Center (JJRTC), which is the primary training facility for the United States Secret Service (USSS). The training center consists of multiple buildings and structures that provide an environment for various training activities, including active scenario training, as well as classroom and conference room space. Due to increased operational tempo, development of new training programs, and campus population growth in recent years, the USSS continues to develop the JJRTC campus to meet the needs of the USSS mission. To enhance training activities and operational readiness, the USSS intends to construct a full-scale site and building representation of the White House, perimeter buildings, and grounds. Project Scope: The project consists of the work associated with the Site, Center Building, and Perimeter Buildings as described below: Site: The general scope of the project is to replicate (or match) the original building’s grounds on the proposed JJRTC project site. This includes matching both the horizontal and vertical site features of the original grounds. The limits of this replica are the outer curb lines of the proposed perimeter roads (Pennsylvania Avenue, E Street, and West/East Executive Avenue). The scope includes providing stormwater management based on the Maryland Department of the Environment’s (MDE’s) requirements. In addition, existing utilities serving the JJRTC facility will be improved and extended to service the project site. As extensive re-grading will be required, most of the flora and fauna will need to be removed from the site. The proposed replacement flora will include inexpensive, fast-growing, and low-maintenance species. Trees will be matched by general size and either evergreen or deciduous. These types should be selected and placed to match the visual and security functions of the existing trees in the original landscape. Deciduous trees should include shade trees and ornamental (flowering trees). Center Buildings: The Center Buildings are made up of the original building’s 4-story high Main Residence and 3-story high West Wing. Building interiors support multiple training and training support functions. Major building floor areas mirror the original building floor layout, however selected areas designated for dynamic training will be a replica of the original building’s interior conditions without attempting historic and decorative reproduction. Perimeter Buildings: The 18 acres of grounds within the security fence have a series of additional structures that will be recreated for training purposes. Ranging in size and function, additional buildings will be built on the SMTF grounds. The intended project delivery method is a Phased Acquisition procurement using a Two-Phase Construction Concept. The scope of work includes all labor and materials required to provide construction services for the SMTF project pursuant to FAR 15.103 (GSA Class Deviation RFO-2025-15) and FAR 36 (GSA Class Deviation RFO-2025-36). The resultant contract will be firm fixed price. The services requested by the contractor shall cover a wide range of construction activities including management, supervision, labor, equipment, and materials required to provide construction and other related services necessary to construct the new facilities. Related services include, but are not limited to, site planning, utilities, testing and inspection during construction, commissioning, and potential additional analysis of the site. The Phase I solicitation is anticipated to be posted on or around March 23, 2026, and the Phase I selection in June of 2026. Phase II solicitation is anticipated to be sent to the shortlisted offerors in July of 2026, with an award anticipated in November of 2026. Currently the substantial completion date is anticipated for 2029. The estimated cost range for construction is between $260,000,000.00 and $290,000,000.00. The total estimated cost of this construction contract is greater than $35 million. As such, in the absence of an exception, this procurement is anticipated to be subject to the Project Labor Agreement requirement in FAR 22.5 (GSA Class Deviation RFO-2025-22). PLAN AVAILABILITY: The solicitation will be available for electronic download at no charge from SAM.gov website under Contracting Opportunities. AMENDMENTS TO SOLICITATION: It is the offeror's responsibility to monitor SAM.gov for the release of any amendments. BONDING: A bid bond is required as well as payment and performance bonds. SECURITY: Before employees are allowed to work under the anticipated contract, all personnel are required to pass a security check. Specific security requirements will be contained in the solicitation. FUNDS AVAILABILITY: Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government arises until award of the contract. ELIGIBLE OFFERORS: All responsible business firms may submit a proposal which shall be considered by the agency. All prospective offerors are also required to use the System for Award Management at SAM.gov for registering their firm and completing representations and certifications. Prospective offerors shall review the solicitation in detail when it becomes available on www.sam.gov, as items described herein may change. Any questions regarding this notification shall be directed to Marsha Howard, Contracting Officer, via marsha.howard@gsa.gov. Potential offerors are responsible for monitoring and downloading the solicitation and any potential amendments, if any, to the solicitation.
47%
Pre-SolicitationOpen
PROJECT TITLE: ISRAEL CONSTRUCTION MATOCPROJECT LOCATION: ISRAELTHE UNITED STATES ARMY CORPS OF ENGINEERS (USACE) MIDDLE EAST DISTRICT HAS A REQUIREMENT FOR A SEVEN-YEAR DESIGN-BID-BUILD (DBB) CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) TO PROVIDE REPAIR, ALTERATION, AND CONSTRUCTION SERVICES IN ISRAEL, PRIMARILY FOR THE IMOD, BUT MAY BE USED FOR OTHER CUSTOMERS WITH REQUIREMENTS IN ISRAEL. THE REQUIREMENT INCLUDES, BUT IS NOT LIMITED TO, MAINTENANCE, REPAIRS, ALTERATION, CONSTRUCTION, DEMOLITION, EXCAVATION, SITE AND INFRASTRUCTURE IMPROVEMENTS (E.G. FENCING, UTILITIES, ROADS, PARKING, AND DRAINAGE), SYSTEM MAINTENANCE (E.G. HEAT VENTILATION AIR-CONDITIONING (HVAC)), AIRFIELD APRONS AND PAVEMENTS, ASBESTOS ABATEMENT, AND ANY SUPPORTING WORK NECESSARY TO CONSTRUCT COMPLETE AND USABLE FACILITIES TO SUPPORT THE FOREIGN MILITARY FINANCING (FMF) PROGRAMS.THIS MATOC WILL CONSIST OF A TWO-YEAR BASE PERIOD AND FIVE ONE-YEAR OPTION PERIODS. AMENDMENT 1 UPDATES ATTACHMENT C TO A THREE-PAGE FORM.
45%
AwardedOpen
45%
AwardedOpen

Additional Details

Solicitation Number

19AQMM26R0012_Domestic_Light_RFP

Archive Date

Mar 7, 2026

Office Address

WASHINGTON, DC, 20520