Design/Build ISF Aramoun Indoor Shooting Range, Lebanon
Archived on June 22, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM GMT+2
- Posted
- May 8, 2026
- Notice type
- Presolicitation
- Set-aside
- No Set aside used
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of State
Notice details
- Office
- ACQUISITIONS - RPSO FRANKFURT
- Last updated
- Oct 31, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 19GE5026R0069
- Notice ID
- a3b3ba73ca2447ea8234c1f1fe19f974
Description
The U.S Consulate General, Frankfurt provides the following Pre-Solicitation Notice regarding the issuance of a Request for Proposal (RFP) for:
Design/Build ISF Aramoun Indoor Shooting Range
U.S. Embassy Beirut, Lebanon
The Regional Procurement Support Office in Frankfurt, Germany, intends to issue a Firm Fixed-Price Design/Build contract in the fourth quarter of Fiscal Year 2026.
The offeror shall provide construction services, contract coordination, and supervision, including but not limited to the management and construction necessary to meet the requirements of this contract within the established timeframe.
US Embassy Beirut, Bureau of International Narcotics and Law Enforcement Affairs (INL) require design/build services to renovate an indoor shooting range for the Internal Security Forces (ISF) at the ISF Aramoun academy.
The Contractor shall furnish all labor, materials, equipment, tools, supervision, and services necessary to perform the renovation of the ISF shooting range. The works include but are not limited to:
Site survey, design submittals, structural work (structural assessment, structural strengthening of existing concrete slab, concrete repair), thermal and moisture protection (expansion joint, SBS Roofing Membrane, water repellent for elevations, PU for toilet floor), doors and windows (glazed steel doors, wood doors, glazed aluminum doors), finishes (ceramic tiles, Terrazzo, Vinyl Tiles, and Epoxy Flooring, screed, suspended ceiling, painting ), signs, shooting range railing, mechanical works (Sanitary Fixtures, Piping, Valving, and Plumbing Accessories, water tanks), DX split units, fire suppression systems, electrical works, fire and CO detection system, CCTV system, earthing system, lightning system, Uninterruptable Power Supply etc.
The estimated magnitude for the entire project is between $1,000,000.00 and $1,600,000.00 U.S. Dollars Note: The provided range is a relatively wide range only, in order to give potential offerors a very general orientation as to the magnitude of the work. However, the specified range is not meant to give any indication as to the Independent Government Cost Estimate for this project, which could be at the lower or the upper end of the range indicated.
Qualified companies interested in the solicitation shall express their interest by written correspondence to the attention of Ms. Wencke Jacobsen at JacobsenW@state.gov no later than June 7, 2026, using the solicitation number 19GE5026R0069 in the subject line.
DO NOT TELEPHONE. All requests for a copy of the solicitation MUST include the following information: Name of Firm, Unique Entity Identifier (Former Dun’s #), Name, Telephone and Email Address of Point of Contact and Complete Physical and Mailing Address of Firm.
The solicitation package/documents shall not be placed on SAM.gov as the documents contain SBU information. Only companies submitting a letter of interest and complete “Application for Solicitation Document” check list attached hereto may receive a copy of the solicitation package/documents when available.
The solicitation package will only be available in the English language. All requirements for translations will be at the expense of the Contractor. Additionally, you are required to complete and include in your expression of interest the below checklist. All requests for the solicitation document that are submitted without the checklist, or with an incomplete checklist, will be rejected.
Firms shall be knowledgeable in written and spoken English and possess all appropriate permits and licenses to perform construction work in Lebanon.
A virtual pre-proposal conference shall be tentatively scheduled for June 2026; precise dates will be provided to interested offerors with the solicitation package.
Given the military conflict currently existing in this area, a site visit will be conducted once the security situation permits it. Information will be provided to interested offerors once available.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (1)
- Download
19GE5026R0069_check list.pdf
120 KBAdded in Presolicitation version 3Posted
Lifecycle
- 3Version 3PresolicitationArchivedCurrent
Design/Build ISF Aramoun Indoor Shooting Range, Lebanon
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
FA8501-27-RAPID-CIRCUIT F1-170129-OTA Under the RAPID Umbrella Framework: RAPID Progressive Design-Build to Replace Circuit F-01 from Fowler Substation UHHZ170129 Description The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a. The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA. The requirement includes replacement of all 15kV, 500MCM cable throughout circuit F-01. This will include replacement and removal all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a. Purpose The purpose of this Area of Interest is to obtain commercially viable, safe, and schedule-credible solutions to design plans for and to perform the replacement of expired high-risk Circuit F01 cabling in order to prevent operational risk, mission delays, and compounding economic costs due to infrastructure failure at Robins Air Force Base, Georgia. The Government requires an integrated approach to address the design, removal of deteriorated cables and replacement with new cable in The Fowler Substation. The selected approach must provide a practical path to execute the work while minimizing disruption to aircraft operations and controlling construction, safety, environmental, and schedule risks. Project Background and Existing Conditions Circuit F-01 has surpassed its operational lifecycle, creating a high-probability risk for catastrophic failure. If the remaining aged portion is not replaced, the installation faces risk of emergency repair premiums and disruption to sustaining airfield infrastructure, supporting safe aircraft movement, installation readiness, and continued mission operations. The work area is slightly congested and impacted by various airfield operations. The Fowler Substation Circuit F-01 will remain in full operation during the entire duration of the project by back feeding with circuit ties. Project Areas Phase 1 (Preconstruction & Collaborative Design): Collaborative design development stakeholders to achieve 65%, site surveys, risk mitigation planning, schedule and establishment of an open-book Guaranteed Maximum Price (GMP) IAW with all other aspects of the SOO. Phase 2 (Final Design & Construction Execution) Completion of final design and full construction execution (exercised upon agreement). Safely construct the facility/project within the agreed GMP and schedule. Assume hazardous materials exist. Address requirements for worker notification, abatement, and disposal. Employ a safety and health professional to provide a HASP per DoDI 6055.01. Comply with Robins Environmental Requirements (Section 01560) submitting Waste Management Report/Landfill Waste Tickets, Solid Waste Disposal Plan, and Qualified Recycling Program (QRP). Appropriately coordinate Stormwater & Erosion Control. Structure execution to allow for payable milestones payments, as well as all other aspects outlined in the SOO. Project-Specific Objectives and Phasing Replace all 15kV, 500MCM cable throughout the distribution of circuit F-01 in its entirety of multiple different installation facilities, while remaining in full operation besides outages and removing and replacing all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. Address specific phasing to accommodate congested areas. OTA & RAPID Framework Approach This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Progressive Design-Build approach under the standalone statutory authority of 10 U.S.C. § 2808a. The Government will be expecting a 100% completed design package and/or specific phasing and repair requirements followed by the completion of the construction or performance of the designed actions. Competitive Selection Process Phase 1 Solution Brief Requirements The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration. Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement. Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 20 November 2026. Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page. Email is the official form of submission for responses. Surety letters may be attached without counting towards 5 page limit. Page format should be 8.5 x 11. The Solution Brief shall include: Cover Page Company name UEI Mailing address Primary point of contact Email address and telephone number Identification of this RAPID AOI Executive Summary, Team Composition, and Organization Summary of the respondent’s qualifications and anticipated delivery capability Explanation of why the team is qualified for the anticipated requirement The team’s understanding of the Robins Air Force Base operational environment The team’s experience working in occupied facilities, congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards. (e.g., hazardous material abatement, and experience with Department of War/Air Force Standards). The team’s proposed approach to Phase 1 collaboration and risk reduction Identification of any material capability, staffing, access, bonding, or teaming assumptions. Past Relevant Construction Capability and Experience Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, adhering to environmental and safety standards.(e.g., hazardous material abatement, and experience with Department of Defense/Air Force Standards). Note that while DoD experience is considered, it will not be a deciding factor in determining a firm more qualified. Financial Capacity and Bonding A statement of financial capacity to perform the anticipated work Current single-project and aggregate bonding capacity, if bonds are anticipated; Name of surety Any other information necessary to demonstrate capacity to perform the anticipated project. Construction Execution and Phasing Approach Methodology for physical work execution Utility outage coordination Evaluation & Selection Criteria The Government will utilize a two-step, Qualifications-Based Selection (QBS) process mapped to the RAPID framework to select the Design-Builder. In accordance with PDB methodology, price will not be evaluated during the initial selection process. Selection is based on qualifications, experience, and collaborative capabilities. Step 1: RAPID Phase 1 Equivalent Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1. Step 2: RAPID Phases 2 Equivalent Interactive Pitch Presentations/Interviews and evaluation of the Phase 1 PDB Price Proposal (short-listed teams only) to determine the final best-value selection. Step 1: Statement of Qualifications Evaluation Factors Factor 1: Past Relevant Experience Minimum Requirement: The Design-Builder (and/or key teaming partner) must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Focus: Historical performance in occupied facilities, managing congested site logistics, complex mechanical/electrical system integrations, and adherence to stringent environmental and safety standards (e.g., hazardous materials abatement, and experience with Department of War/Air Force Standards). Note: while DoW experience is considered, it will not be a deciding factor in determining a firm more qualified. Factor 2: Team Composition and Organization Focus: The government will evaluate the proposed organization structure, the integration of design and construction personnel from project inception, and the qualifications of Key Personnel. This includes assessing the proposed site superintendent/project managers ability to oversee operations and coordinate with the Government daily. Factor 3: Project Approach and Understanding Focus: The Government will assess the firm’s understanding of the PDB OTA process and their proposed approach to executing Phase 1 (Design and Preconstruction) and Phase 2 (Final Design & Construction). This includes the firm’s strategy for open-book estimating, schedule development, and manage site-specific constraints at Robins AFB (e.g. restricted area access, flightline requirements, and utility outage coordination). Step 2: Pitch Presentation and Price Evaluation (Final Down-Select) The Government may invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day. Factor 1: Collaborative Capability and Cultural Fit Focus: Ability to work in a transparent, “open-book” partnership with the 78 CEG Project Delivery Team (PDT) and Base stakeholders. Factor 2: Real-Time Problem-Solving and Risk Management Focus: Capacity to identify, analyze, and mitigate complex project risks. Evaluated based on response to real-time scenarios presented during the Q&A. Factor 3: Innovative Design-Build Solutions Focus: Creative, value-driven, and cost effective courses of action (COAs) proposed to meet the Government’s mission objectives. Factor 4: Financial Capacity and Bonding Focus: Demonstrated financial capacity to support the anticipated project magnitude and, if required by the final OTA, sufficient bonding capacity. Focus: The estimated magnitude of construction associated with this Area of Interest (AOI) is $5M to $10M. This range is provided for planning purposes only and does not constitute an explicit funding guarantee or disclose the Independent Government Estimate. This range is provided to assist interested offerors in determining the necessary single-project and aggregate bonding capacity required to support the subsequent construction agreement. Final Selection and Award Upon concluding presentations, the evaluation team will select the single most highly qualified Design-Builder. The Government will invite the selection firm to negotiate terms, Scope of Services, and a design/preconstruction fee for the Phase 1 OTA Agreement. The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA. Government Reservations The Government reserves the right to: Invite, not invite, or limit respondents advancing to later phases; Conduct technical exchanges; Request clarifications or supplemental information; Negotiate with one or more respondents; Modify, suspend, or cancel this Special Notice; Issue additional notices or requests; and Make no award. Attachments UHHZ170129 - 01005 - SOO - PDB with OTHER TRANSACTIONAL AUTHORITY F1 Binder UHHZ170129 REV 22-02 base power grid F1 REV 22-02 base power grid 0111 REV 22-02 base power grid-Model F1 compact Send all submissions to: angela.whitley@us.af.mil and kristen.denlinger@us.af.mil Notice of Expanded Opportunity, Follow-On Awards, and Multi-Base Utilization; While the immediate requirement under this AOI is to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA, offerors are advised that participation and successful evaluations under this AOI may provide significant strategic opportunities beyond the initial project. | 70% | Special Notice | 11/20/2026 |
10/08/2026: ***Anticipated Solicitation Date, Solicitation Number as well as building description have been updated*** 08/30/2026: ***Anticipated Solicitation Date as well as building description has been updated*** ***THE SOLICITATION NUMBER HAS BEEN UPDATED TO W912QR27RA004*** DESCRIPTION: The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (RFP) W912QR27RA004 for the Maintenance and Repair Army Reserve (MRAR) of Area Maintenance Support Activity (AMSA) 21 at Joint Base McGuire-Dix-Lakehurst (JBMDL) in Burlington, New Jersey. The project will repair failing facility components and extend the economic life of the facility by 25 years, providing a modern maintenance facility that enables readiness for the Army Reserve units located in the surrounding area. The project scope includes the repair of the failing HVAC and electrical systems, the removal of non-structural interior walls to right-size rooms and create open flexible workspaces as required, the repair/replacement/upgrade of light fixtures with code compliant units, the installation of a code compliant fire alarm and suppression system, and the repair of electrical conduit distribution throughout the facility. The project also repairs the exterior structural elements, replaces the failing standing seam metal roof, and corrects all life safety deficiencies while maintaining the elements of the building's exterior. The restored facility will meet minimum DOD Antiterrorism standards. All hazardous materials (HAZMAT) removed as part of the demolition will be disposed of following all state and federal guidelines. The Contract Duration is one thousand ninety-five (1,095) calendar days from Contract Notice to Proceed. TYPE OF CONTRACT AND NAICS: This RFP will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 - Commercial and Institutional Building Construction. TYPE OF SET-ASIDE: This acquisition will be a 100%Total Small Business Set-Aside. SELECTION PROCESS: This will be a two-phase Design/Build procurement process. The proposals will be evaluated using a Best Value Tradeoff source selection process. Potential offerors are invited to submit their performance, technical, and capability information as will be described in section 00 22 16 of the Solicitation, for review and consideration by the Government. The selection process for Phase I will evaluate such factors (not necessarily in order): Past Performance and Technical Approach for Design/Build. Pro Forma Information such as bonding and financial capability will also be required to meet the minimum requirements of the solicitation Following completion of the evaluation of Phase I, a target of five (5) of the most highly qualified offerors will be invited to participate in Phase II. The selected offerors for Phase II will be invited to submit additional information as will be described in Section 00 22 18 of the Solicitation, for review and evaluation by the Government. The selection process for Phase II will evaluate such factors as: Design Narrative, Management Plan, and Price. Standard Form (SF) 1442 will also be required. (NOTE: The evaluation factors for Phase II are subject to change with the Phase II amendment.) All evaluation factors, other than cost or price, are considered approximately equal to cost or price. DISCUSSIONS: The Government intends to award without discussions but reserves the right to conduct discussion should it be deemed in the Government's best interest. CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $10,000,000 and $25,000,000. ANTICIPATED SOLICITATION RELEASE DATE: The Government anticipates releasing the solicitation on or about 30 October 2026 and approximate closing date on or about 30 November 2026. Actual dates and times will be identified in the solicitation. Responses to this synopsis are not required. Additional details can be found in the solicitation when it is posted. This notice will be updated if the anticipated soliciation release date extends beyond 30 October 2026. SITE VISIT: A site visit will be held following the issuance of the Phase II solicitation to the Offerors selected to move forward. The exact location and time will be included in the solicitation. SOLICITATION WEBSITE: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at federal Contracting Opportunities website, https://sam.gov. Paper copies of the solicitation will not be issued. Telephone, email, and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Amendments, if/when issued, will be posted to the website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the website periodically for any amendments to the solicitation. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System to for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is Contract Specialist, Mr. Seth Dukes at seth.j.dukes@usace.army.mil. | 69% | Pre-Solicitation | 12/21/2026 |
***Am-0001 has been issued for this solicitation. Please see Procurement Integrate Enterprise Environment (PIEE) Solicitation Module to download the latest attachments for this solicitation. | 68% | Solicitation | 01/08/2027 |
***AMENDMENT 0005 WAS POSTED ON 03 SEPTEMBER 2026*** ***AMENDMENT 0004 WAS POSTED ON 25 AUGUST 2026*** ***AMENDMENT 0003 WAS POSTED ON 21 AUGUST 2026*** ***The Site Visit Roster was posted on 17 August 2026*** ***AMENDMNENT 0002 IS ISSUED TO PHASE II SELECTED OFFERORS ONLY ON FRIDAY, 31 JULY 2026*** The Response Date Time Zone is Eastern Time (ET). All Amendment 0002 documents are available for download from the Procurement Integrated Enterprise Environment (PIEE) website. Go to the Attachments/Links section of this page and access the hyperlink titled PIEE Solicitation Module Link for W912QR26RA055. Once at the site, scroll down to the Attachments section of the PIEE Solicitation Module to locate the documents. ***AMENDMENT 0001 WAS POSTED ON 05 JUNE 2026*** Request for Proposal (RFP) Solicitation Number W912QR26RA055, is issued for the Design / Build Maintenance and Repair Army Reserves (MRAR) design and repair of the General Stilwell Memorial U.S. Army Reserve Center (ARC) Training Building 1520, located in Fort Sam Houston (Joint Base San Antonio), Texas. This project will eliminate identified deficiencies; extend the economic life of the facility by 25 years. Building components and systems to be repaired include the roofing, heating, ventilation, and air conditioning (HVAC); electrical distribution; water distribution and fire alarm and suppression systems, ceilings, windows, doors, floor coverings, interior reconfiguration, and interior and exterior finishes. The Contract Duration is estimated at 926 calendar days from Contract Notice to Proceed (NTP). TYPE OF CONTRACT AND NAICS: This RFP will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 - Commercial and Institutional Building Construction. TYPE OF SET-ASIDE: This acquisition will be a Full and Open procurement. A small business sub-contracting plan will be required prior to award. SELECTION PROCESS: This is a two-phase Design/Build procurement. The proposals will be evaluated using a Best Value Tradeoff source selection process. The technical information contained in each Offeror's proposal will be reviewed, evaluated, and rated by the Government. Potential offerors are invited to submit their past performance, technical, and capability information as described in Section 00 22 16 and Section 00 22 18 of the Solicitation, for review and consideration by the Government. As described in Section 00 22 16 of the Solicitation, the selection process for Phase I will evaluate such factors as Past Performance (for both the Prime Contractor and A/E Designer of Record) and Technical Approach for Design/Build. Pro Forma Information such as bonding and financial capability will also be required to meet the minimum requirements of the solicitation. Following completion of the evaluation of Phase I, a target of five (5) of the most highly qualified offerors will be invited to participate in Phase II. The selected offerors for Phase II will be requested to submit additional information as described in Section 00 22 18 of the Solicitation, for review and evaluation by the Government. The selection process for Phase II will evaluate such factors as: Design Narrative, Management Plan, Schedule Narrative, and Price. The Standard Form (SF) 1442 will also be required. (NOTE: The evaluation factors for Phase II are subject to change with the Phase II amendment.) All evaluation factors, other than cost or price, are considered approximately equal to cost or price. DISCUSSIONS: The Government intends to award without discussions but reserves the right to conduct discussions should it be deemed in the Government's best interest. SOLICITATION WEBSITES: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at federal Contract Opportunities website, https://sam.gov and the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module website, https://piee.eb.mil/. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the System for Award Management at https://sam.gov. Amendments, if/when issued, will be posted to the above referenced websites for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors’ responsibility to check the websites periodically for any amendments to the solicitation. The solicitation documents can be downloaded by following the "PIEE Solicitation Module Link for W912QR26RA055" Link in the Links / Attachments Section below. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is Alex Hamilton, Alex.J.Hamilton@usace.army.mil. PARTNERING WITH US: https://www.usace.army.mil/Business-With-Us/Partnering/ Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ and then clicking on: "View FFP Contract Changes Playbook Here." | 68% | Solicitation | 09/10/2026 |
THIS IS A PRE-SOLICITATION NOTICE and is for information purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS OR BIDS. This announcement is for information and planning purposes only and is not to be constructed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. NO SOLICITATION IS CURRENTLY AVAILABLE. Refer to the attached document for more information on this particular requirement. | 68% | Pre-Solicitation | Open |
Additional Details
Solicitation Number
19GE5026R0069
Archive Date
Jun 22, 2026
Place of Performance Country
LEBANON
Office Address