GovChime
Notice ID: b8ea36ffd8b44733a845030c8b863d1aCombined Synopsis/SolicitationArchived

TEGUC-Feasibility Study for the design and construction of a dedicated underground medium voltage (MV) power feeder for the U.S. Embassy New Embassy Compound (NEC).

Archived on July 28, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM CST
Posted
June 26, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
No Set aside used
NAICS
541330: Engineering Services
Agency
Department of State

Notice details

Office
US EMBASSY TEGUCIGALPA
Place of performance
TEGUCIGALPA, Francisco Morazán, 11101
PSC
C211: ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING
Last updated
Oct 29, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
19H08026N0005
Notice ID
b8ea36ffd8b44733a845030c8b863d1a

Description

Amendment 0001:

The purpose of this amendment  is to:


a.    Extend offers due date from June 26, 2026 10:00 am (Local Time)  to July 13, 2026 (Local Time).

--------------------------------------------------------------------------------------------------------------------

The United States Embassy in Honduras hereby issues this Request for Information (RFI) seeking qualified Architect/Engineer (A/E) firms to provide professional services for the preparation of a comprehensive Feasibility Study related to the design and construction of a dedicated underground medium-voltage (MV) power feeder serving the U.S. Embassy New Embassy Compound (NEC).

The selected firm(s) shall provide all labor, materials, expertise, and services necessary to evaluate power supply alternatives in coordination with the Empresa Nacional de Energía Eléctrica (ENEE), Honduras’ national electric utility. The Feasibility Study shall assess the technical, regulatory, operational, and logistical viability of the proposed underground feeder system; evaluate ENEE’s institutional capacity to support the installation, operation, and maintenance of underground MV electrical infrastructure; identify and assess qualified local partners and contractors capable of performing the required civil works; and analyze potential overhead feeder alternatives, including associated advantages, limitations, costs, and risks.

All responsible and qualified sources are invited to submit information for consideration. Based on the responses received, the U.S. Government may elect to award either a single contract encompassing all required services or multiple contracts for separate portions of the work to the most qualified firms.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

RICHARD BECKMAN

Secondary Contact

Jelsy Cabrera

Documents

Files (2)

  • Amendment 0001.pdf

    373 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • RFI 19H08026N0005_Qualifications.pdf

    286 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    TEGUC-Feasibility Study for the design and construction of a dedicated underground medium voltage (MV) power feeder for the U.S. Embassy New Embassy Compound (NEC).

    Notice 5b3dd2e097414f74add2bf26214e6499 on SAM.gov

  2. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    TEGUC-Feasibility Study for the design and construction of a dedicated underground medium voltage (MV) power feeder for the U.S. Embassy New Embassy Compound (NEC).

    Notice b8ea36ffd8b44733a845030c8b863d1a on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

19H08026N0005

Archive Date

Jul 28, 2026

Place of Performance Country

HONDURAS

Office Address

WASHINGTON, DC, 20520