GovChime
Notice ID: ef2a75df0a9f4f69854196251e782742SolicitationArchived

Repair of underground storage fuel tank and manholes

Archived on July 7, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM GMT+7
Posted
May 28, 2026
Notice type
Solicitation
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of State

Notice details

Office
US EMBASSY BANGKOK
Last updated
Oct 30, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
19TH2026Q0038
Notice ID
ef2a75df0a9f4f69854196251e782742

Description

Enclosed is a Request for Quotes (RFQ) for repair of underground storage fuel tank and manholes at Chancery. If you would like to submit a quotation, follow the instructions in Section J of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form that follows this letter.

The U.S. government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial proposals, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.

The site visit is required and has been scheduled for June 5, 2026 at 10:30 AM at 120-122 Wireless Rd. Lumpini, Pathumwan, Bangkok, Thailand 10330. Please submit information for personnel joining the site visit by June 3, 2026 before noon (Bangkok local time) to Pinlaorp@state.gov.

Request for questions regarding this work may be submitted no later than 4:00 PM Bangkok Time on June 9 ,2026 by email in English to: Pinlaorp@state.gov

Quotations are due by 4:00 PM Bangkok local time on June 22, 2026. No quotations will be accepted after this time. Quotations must be in English and incomplete quotations will not be accepted. Your quotation must be submitted electronically to Pinlaorp@state.gov.  Please enter in the subject line: “Quotation Enclosed-RFQ#19TH2026Q0038- Repair of Underground Storage Fuel Tank.” It is important to make sure the submission is made in a specific size and format; in MS-Word 2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size exceeds 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.

Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102. Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsive and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Ramon Menendez-Carreira

Secondary Contact

Poonnakrit Pinlaor

Documents

Files (1)

  • RFQ_19TH2026Q0038_Repair of UST and Fuel system_20260528_SIGNED.pdf

    924 KBAdded in Solicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3SolicitationArchivedCurrent

    Repair of underground storage fuel tank and manholes

    Notice ef2a75df0a9f4f69854196251e782742 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Updated 13 November 2026: Amendment 0002 is being issued to provide amended solicitation and specifications, plan set drawings, remove language in Section 00 73 00, provide reference drawings, and pre-bid meeting notice sign in sheet. See Amendment 0002 for additional information and attachments. All amendment documents are accessible via the link below titled "PIEE Solicitation Module Link for W912EK27BA011." Updated 26 October 2026: Amendment 0001 is being issued to remove Site Visit Construction (FEB 1995) supplementary conditions and replace with Prebid Meeting Notice supplementary conditions. See Amendment 0001 for additional information. The U.S. Army Corps of Engineers, Rock Island District has a requirement for construction of 88th RD US Army Reserve Center Monclova, OH Construct Storage Building and Repair MEP Lots. The work includes but is not limited to, architectural work including, installation of pre-fabricated metal storage building, overhead and insulated hollow metal flush doors, cage partitions, steel shelving, painting, guardrails; fire suppression work; mechanical work, electrical work, placement of aggregate; placement of asphalt and concrete; concrete work; interior and exterior lighting; fire alarm and mass notification system; earthwork; chain link fencing; utility work including, gas, water, and electrical work; and site restoration and seeding. See Solicitation and Specifications for additional information on construction project. NAICS Code: 236220 Size Standard: $45,000,000 8(a) Competitive Invitation for Bid (IFB) Questions regarding this solicitation shall be submitted via ProjNet by 2:00 PM Central Time on 06 November 2026. See MVR.02 Question and Answer Via ProjNet in the solicitation for additional information. Invitation for Bid (IFB) are due by 11:00 AM Central Time on 20 November 2026. All bids received after 11:00 AM Central Time on 20 November 2026 will be considered late.
47%
Solicitation11/20/2026
Enclosed is a Request for Quotations (RFQ) for Fuel Management System Maintenance Services. If you are a qualified contractor and would like to submit quotation, follow the instructions in Section 3 of the solicitation, complete the required portions of the attached document, and submit it to the address shown on Standard Form 1449 that follows this letter. The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so. Quotations are due by April 2, 2026, at 12:00 p.m. local time. No quotations will be accepted after this time. Proposals must be in English and incomplete proposals will not be accepted. Your quotation must be submitted in separate sealed envelopes (one technical and one financial) marked: U.S. Embassy Senegal Attn: Contracting officer Solicitation No 19SG2026Q0003 Route des Almadies – Dakar Or electronically to Dakarsolicitation@state.gov .State on the email subject line that the submission is for RFQ #19SG2026Q0003. It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size should exceed the 30MB maximum, the submission must be made in separate files and attached to separate emails with files that are less than 30MB each. In order for a quotation to be considered, you must also complete and submit the following: 1. SF-1449 2. Section I, Pricing 3. Section 5 Representations and Certifications 4. Additional information as required in Section 3 5. The Offeror should submit a completed IRS Form W-14, found at www.irs.gov/w14, to ensure compliance with FAR 52.229-11;” 6. Proof of SAM Registration Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102. Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement. Direct any questions regarding this solicitation to the Contracting officer by email at dakarsolicitation@state.gov . Questions must be submitted in English and sent no later than March 18, 2026.
47%
Combined Synopsis04/02/2026
Replace Chillers in AHUs 1 & 2 558-22-172
45%
AwardedOpen
STATEMENT OF WORK Project Number: 558-22-172 Replace Chillers for AHU 1 and 2 Scope: The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications. Construction Period - Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed. Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants. Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting. As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats. Hours of Operation and Phasing: Construction should be phased and timed such that: General Operation of the affected areas is not interrupted The facility operates on a 24-hour, 7 day per week schedule Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs. 1st shift construction activities will be allowed with approval of the COR. Contractor to develop and coordinate phasing plan with input from staff and final approval of COR. Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend. Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date. Storage: No storage of any material will be allowed on VA property unless approved by the COR. Period of Performance: Contractor shall complete this project no later than 270 days after issue of notice to proceed (NTP). Utility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. The contractor shall submit a request to interrupt any such services to COR, in writing, 20 days in advance of proposed interruption. General Requirements The contractor’s employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space. Means of Egress: Do not block existing egress for occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements. Minimize disruptions and coordinate with COR. All buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Manager at least 48 hours in advance. New work shall be installed and connected to existing work neatly, safely and professionally. Contractor to coordinate periodic VA inspection to ensure satisfactory workmanship of GC and Subcontractors. Any portion of the VAMC that is disturbed or damaged shall be replaced or repaired to its prior condition. The contractor is required to notify the COR upon arrival and departure of personnel at the work site every day work is performed during the execution of this project. END OF SCOPE OF WORK
45%
Solicitation08/27/2026
Amendment 0004 issued to extend the response due date to 8 Oct 2026, 1300 hours.
45%
Solicitation10/08/2026

Additional Details

Solicitation Number

19TH2026Q0038

Archive Date

Jul 7, 2026

Place of Performance Country

THAILAND

Office Address

WASHINGTON, DC, 20520