Questions & Answers for DCMR Kitchen Renovation U.S. Embassy Ankara, Turkiye
Archived on September 29, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM GMT+3
- Posted
- September 10, 2026
- Notice type
- Special Notice
- Set-aside
- No Set aside used
- NAICS
- 236118: Residential Remodelers
- Agency
- Department of State
Notice details
- Office
- US EMBASSY ANKARA
- Place of performance
- ANKARA, Ankara, 06530
- PSC
- Z2FA: REPAIR OR ALTERATION OF FAMILY HOUSING FACILITIES
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 19TU1526Q3003QA
- Notice ID
- 09db0ac9ba9e4e898191e4a9cf2410e4
Description
U.S. EMBASSY ANKARA, TÜRKIYE
SOLICITATION FOR the DCMR Kitchen Renovation
ANSWERS TO QUESTIONS -19TU15-26-Q-3003
Below is the list of questions received as of 08/09/26 and their respective answers:
1. What are the specifications/properties of the materials used for kitchen cabinets, countertops, sinks, faucets, and wall and floor tiles?.
Answer: As already stated in the SOW, bidders are required to submit the technical specifications of the materials they intend to use for the project.
2. The bidding period seems short due to material lead times. Could you please extend the deadline?
Answer: The location shown in the concept design shall be taken into consideration.
3. After what time in a day we may dispose of debris from the site?
Answer: Debris and waste may be removed from the site during working hours, between 08:00 and 17:00.
4. The sink and faucet location in render contradicts with current site location. Could you please advise which one prevails?
Answer: The location shown in the concept design shall be taken into consideration.
5. Could you please inform the brand and model of the refrigerator and dishwasher to collect the size information?
Answer: The refrigerator will be a standard double-door refrigerator. The dishwasher will not be replaced; the existing standard dishwasher will remain in use. In addition, the dimensions of these appliances are not expected to have any impact on the project cost.
6. We intend to use Vitra/Kale brand antislip tiles. Could you please confirm if these local brands will be acceptable or if we will be required to use imported products?
Answer: The proposed materials may be used provided that they comply with the technical specifications stated in the SOW.
7. Garbage disposer under sink and water treatment for the faucet will not be included in proposal. Could you please confirm?
Answer: The garbage disposer under the sink and the water treatment system for the faucet will not be included in the scope of the proposal.
8. Spoon holder and knife holder are included in proposal. Could you please inform if there is any further need?
Answer: No additional accessories or equipment are required beyond those already specified
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (3)
Lifecycle
- 4Version 4SolicitationArchived
SOLICITATION for DCMR Kitchen Renovation U.S. Embassy Ankara, Turkiye
- 6Version 6Special NoticeArchivedCurrent
Type changed from Solicitation to Special Notice
Questions & Answers for DCMR Kitchen Renovation U.S. Embassy Ankara, Turkiye
Similar Opportunities
Additional Details
Solicitation Number
19TU1526Q3003QA
Archive Date
Sep 29, 2026
Place of Performance Country
TURKEY
Office Address
WASHINGTON, DC, 20520