Notice ID: 1b52f129e869417096ea453475e74600Award NoticeAwarded
Boilers for U.S. Coast Guard Training Center Cape May, NJ
Awarded on July 22, 2020. Full description on SAM.gov.
Awarded tounder 70Z0G820PPFC01900 (source: SAM.gov award notice)• $127.3K
Overview
- Posted
- July 23, 2020
- Notice type
- Award Notice
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 423720: Plumbing and Heating Equipment and Supplies (Hydronics) Merchant Wholesalers
- Agency
- Department of Homeland SecurityUS COAST GUARD
Notice details
- Office
- BASE NATIONAL CAPITAL REGION(000G8)
- Place of performance
- Cape May, NJ, 08204
- Last updated
- Apr 29, 2026
- Award date
- Jul 22, 2020
- Award amount (SAM.gov award notice)
- $127.3K
Identifiers
- Solicitation number
- 70Z0G820PPFC01900
- Notice ID
- 1b52f129e869417096ea453475e74600
- Award number (PIID)
- 70Z0G820PPFC01900
Description
Award Notice
Award Overview
Award Number
70Z0G820PPFC01900
Award Amount (SAM.gov award notice)
$127.3K
Award Date
Jul 22, 2020
Awardee
Awardee UEI
MW39J4TZ5SN8
Original Solicitation
Notice ID: 1b52f129e869417096ea453475e74600
Posted Date: Jul 23, 2020
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
70Z0G820PPFC01900- Awarded
This opportunity has been awarded.
- AwardedCurrentJul 23, 2020
Boilers for U.S. Coast Guard Training Center Cape May, NJ
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
THE TIMELINE FOR VISIT WILL BE 11/3/26-11/6/2026, 11/9/2026-11/10/2026 8AM- 3PM EST. SITE VISITS: MUST BE COORDINATED WITH DC1 MICHAEL BUSH VIA PHONE 934-235-0487. This project consists of combustion analysis, calibration, and commissioning services for eleven (11) boilers at the U.S. Coast Guard housing area at Station Eaton’s Neck.(12 Lighthouse Rd, Northport, NY 11768) Each housing unit contains the following equipment covered under this agreement: Boiler: Weil-McLain EVG 299 (280,000 BTU) Hot Water Storage Tank: Weil-McLain AQUA PLUS – 55 – S2 The purpose of this requirement is to verify and adjust boiler combustion settings in accordance with applicable manufacturer specifications; support safe, efficient, and reliable boiler operation; and document any equipment conditions requiring work beyond the scope of combustion calibration and commissioning. | 40% | Combined Synopsis | 11/13/2026 |
Boiler | 36% | Combined Synopsis | 09/01/2026 |
Boiler | 36% | Combined Synopsis | 09/01/2026 |
KN10 HYDROTHERM KN-10 BOILER EA 2, KN20 HYDROTHERM BOILER EA 2, WB1250 RBI TORUS 1250MBH BOILER EA 1, WB1000 RBI TORUS 1000MBH BOILER EA 4, EF100T199E3N BRADFORD WHITE NG 100 GALLON 199,000BTU COMMERCIAL WATER HEATER EA 6 | 36% | Combined Synopsis | 07/16/2026 |
HVAC BOILERS - FORT BRAGG | 35% | Combined Synopsis | 08/18/2026 |
Additional Details
Solicitation Number
70Z0G820PPFC01900
Archive Date
Aug 6, 2020
Office Address
WASHINGTON, DC, 20593