GovChime
Notice ID: 1c49db41c3ed48d8a2b515db088a9727Sources Sought

66--IRA - High-Temperature Chamber Furnace

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
1:00 PM EST
Posted
November 10, 2026
Notice type
Sources Sought
NAICS
333994: Industrial Process Furnace and Oven Manufacturing
Agency
Department of Energy

Notice details

Office
NATIONAL ENERGY TECHNOLOGY LABORATORY
PSC
6640: LABORATORY EQUIPMENT AND SUPPLIES
Last updated
Nov 10, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
89243327NEX000003
Notice ID
1c49db41c3ed48d8a2b515db088a9727

Description

This amendment is to address several requests for clarifications associated with our Technical Specifications.

Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system?

A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system.

Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel?

A2: NETL is responsible for installing all necessary hardwire drops or disconnects.

Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output?

A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines.

Q4. Lead Times and Compliance: Given that Brand Name or Equal highly customized vacuum furnaces built to NRTL, UL 508A, and NFPA 79 standards often have commercial lead times exceeding 6 to 9 months, will the anticipated RFQ allow for standard commercial lead times? Additionally, can you confirm if this procurement will be subject to the Trade Agreements Act (TAA) or strict Buy American Act (BAA) provisions?

A4: NETL will accept standard commercial lead times for this procurement. This procurement will be subject to the FAR 52.225-5 Trade Agreements Act (TAA).

Full description on SAM.gov

Award Overview

No prior contract identified

No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Sources Sought

    66--IRA - High-Temperature Chamber Furnace

    Notice bb937945e9da43868b15a4c6fdbb5294 on SAM.gov

  2. 2
    Version 2Sources SoughtCurrent

    66--IRA - High-Temperature Chamber Furnace

    Notice 1c49db41c3ed48d8a2b515db088a9727 on SAM.gov

Similar Opportunities

Title
Phase
Deadline

Additional Details

Solicitation Number

89243327NEX000003

Archive Date

Dec 1, 2026

Office Address

MORGANTOWN, WV, 26507