Incinerator Office and Remote-Control Touchscreen

Cancelled on SAM.gov (notice posted April 6, 2026). Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM EDT
Posted
April 6, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
No Set aside used
NAICS
334419: Other Electronic Component Manufacturing
Agency
Department of Homeland SecurityUS CUSTOMS AND BORDER PROTECTION

Notice details

Office
BORDER ENFORCEMENT CONTRACTING DIVISION
Place of performance
San Luis, Arizona, 85349
PSC
K036: MODIFICATION OF EQUIPMENT- SPECIAL INDUSTRY MACHINERY
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
20157465
Notice ID
7a4f6ab1ac844f839dfbb5556fb541d7

Description

1. SCOPE:
Per the enclosed Statement of Work, the Contractor shall provide all supervision, labor, materials, supplies, and equipment, necessary to:

1.Install a Remote Touchscreen, that must meet or exceed one provided by Keller Manufacturing for the KMB-2400. The touchscreen shall be mounted inside of the Incinerator Office (Conex) as outlined below.

2. Provide and install conduits (3/4” minimum) for DC and CAT 6A wiring/cable necessary to connect the incinerator to the touchscreen. CAT 6A cable shall have innerduct protection. The installation (see site plan for path) shall be underground as much as possible.

3. Provide and install conduit (3/4” minimum) for power to the Incinerator office (minimum 125 amps required). The installation (see site plan for path) shall be underground as much as possible.

4. Provide and install conduit for CAT 6A cables necessary to connect two workstations (2 data cables each with RJ-45 jacks) in the Incinerator Office. The data cabling shall connect to the network at the booth on the Haz Mat Dock. CAT 6A cable shall have innerduct protection. The installation (see site plan for path) shall be underground as much as possible.

5. Provide and install an approximately 8’ x 20’ metal conex Incinerator Office. Upon award the program office will provide the plan for basis of design and the site plan for location.

6. The project shall provide a complete working system.

7. The work shall be coordinated with U.S. Customs and Border Protection so that port security is not compromised and the work interrupts normal port operations minimally.

8. The General Contractor shall provide a minimum of a two (2) year warranty for all labor and materials associated with the project from date of substantial completion, unless a longer term is stated elsewhere.
All material shall be commercially available first line products that meet or exceed the requirements of associated recognized testing facility.

2.APPLICABLE DOCUMENTS and CODE COMPLIANCE:
All local, state and federal codes must be followed including the current versions of the International Building Code, International Mechanical Code, Uniform Plumbing Code, National Electrical Code.
2023 LPOE Design Standard

2.Commercial standards shall be used wherever practicable.

3.Work Location: San Luis II Land Port of Entry
1375 South Avenue E, San Luis, AZ. 85349

4. DELIVERABLES AND DELIVERY SCHEDULE:
4.1 Deliverables:
a. Work schedule prior to start of the project.
b. Product and shop drawing submittals.
c. Weekly updates at scheduled meetings.
d. Material Safety Data Sheets (MSDS)

5. GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION:
NA

6. Hours of Work.
Work will be accomplished during normal working hours (M-F - 6:00 a.m. – 5:00 p.m.) and/or daytime hours on Saturday and Sundays, unless otherwise permitted by the Contracting Officer/CBP Project Manager.

7. SECURITY CLEARANCE AND SITE ACCESS:
7.1 The contractor is required to comply with CBP policies and directives related to confidentiality and privacy. The contractor is prohibited from gathering or sharing any information with third parties and is required to protect all data they may observe or overhear while operating on federal premises.
7.2 At all times during performance of this contract and until the work is completed and accepted, the Prime Contractor shall have on the worksite a competent superintendent who is satisfactory to the Contracting Officer/CBP Project Manager and has authority to act for the Contractor. This person shall have an HSPD-12 clearance.
7.3 US Customs and Border Protection personnel will directly monitor the work site security; however they are not responsible for the security of the project’s equipment or materials.

8.SPECIAL CONSIDERATIONS:
8.1 Changes to the SOW


No changes to this SOW or cost increases shall be incurred without written prior approval of the Contracting Officer as coordinated by the COTR. Any changes or cost increases will not take effect until the Contracting Officer executes a written modification.

ALL QUOTES, ALONG WITH WARRANTY AND PRODUCT INFORMATION, MUST BE SENT TO:

david.d.williamson@cbp.dhs.gov

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Files (1)

  • Attachment 1.pdf

    235 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Incinerator Office and Remote-Control Touchscreen

    Notice 3a56ea017cfd46f6aae1e5fa3f51831c on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationCancelledArchivedCurrent

    Incinerator Office and Remote-Control Touchscreen

    Notice 7a4f6ab1ac844f839dfbb5556fb541d7 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

20157465

Archive Date

Apr 25, 2026

Office Address

WASHINGTON, DC, 20229