Notice ID: 34f5705584143d7894f39c63af4fbecbCombined Synopsis/Solicitation
Shackle Assemby
Archived on June 3, 2019. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 PM UTC+02:00
- Posted
- May 11, 2016
- Notice type
- Combined Synopsis/Solicitation
- NAICS
- 332111: Iron and Steel Forging
- Agency
- Department of Homeland SecurityUS COAST GUARD
Notice details
- Office
- SFLC PROCUREMENT BRANCH 2(00085)
- PSC
- 53: HARDWARE AND ABRASIVES
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- 2116406B830400005
- Notice ID
- 34f5705584143d7894f39c63af4fbecb
Description
(i) This is a combined synopsis/solicitation for commercial items, prepared in accordance with the format in subpart 12.6 of the FAR and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. (ii) Solicitation number 2116406B830400005 applies and is used as a Request For Quote (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-87, effective, 7 March 2016. (iii) It is anticipated that a competitive price purchase order shall be awarded as a result of this synopsis/solicitation. The North American Industry Classification System (NAICS) code is *******for this requirement. All responsible sources may submit a quotation, which if timely received, shall be considered by this agency. (iv) The U.S. Coast Guard, Surface Forces Logistics Center (SFLC) intends to award a Firm Fixed Price Purchase Order. Award will be made on an all or none basis and lowest technically acceptable price. (v) The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items: ITEM 1: 4030 00-236-8403 SHACKLE,SPLIT KEY1STCL SHACKLE ASSEMBLY, SPLIT KEY, 1ST CLASS, 2 INCH. CONSISTS OF 1ST CLASS SHACKLE BODY, 1ST CLASS SPLIT KEY PIN AND 1ST CLASS SPLIT KEY. ALL TO BE MADE AND ASSEMBLED IAW LATEST REVISION OF P-570-0261 (HQ SPEC 417) AND REFERENCED DRAWING. PACKAGING, PACKING AND MARKING TO BE IAW P-570-0261. BAR CODING IAW AIM BC1 IS REQUIRED. ATTACHMENTS: INSPECTION REQUIREMENTS: PART_NBR: 121079B-KEY SHACKLE-1CL ANDERSON FORGE AND MACHINE INC QUANTITY _200_ Unit of Issue: __EA__ UNIT PRICE: ____________ TOTAL:_____________ REQUIRED DELIVERY DATE ON OR BEFORE:___ 06/01/2016____ PROMISED DELIVERY DATE:______________________ ITEM 2: 4030 01-286-6204 SHACKLE SPLTKEY4THCL SHACKLE, SPLIT KEY, 4TH CLASS. TO BE MADE IAW LATEST REVISION OF SPECIFICATION P- 570-0261 AND REFERENCED DRAWING. PACKAGING, PACKING AND MARKING TO BE IAW P-570- 0261. BAR CODING IAW AIM BC 1 IS REQUIRED. PART_NBR: 121079B-KEY SHACKLE-4CL ANDERSON FORGE AND MACHINE INC QUANTITY _3500_ Unit of Issue: __EA__ UNIT PRICE: ____________ TOTAL:_____________ REQUIRED DELIVERY DATE ON OR BEFORE:___ 06/01/2016____ PROMISED DELIVERY DATE:______________________ ITEM 3: 4030 01-286-6205 SHACKLE SPLTKEY3RDCL SHACKLE ASSEMBLY, SPLIT KEY, 3RD CLASS. CONSISTS OF 3RD CLASS SHACKLE BODY, 3RD CLASS SPLIT KEY PIN, AND 3RD CLASS SPLIT KEY. ALL MADE AND ASSEMBLED IAW SPECIFICATION P-570-0261 AND DRAWING 121079. PACKAGING, PACKING AND MARKING TO BE IAW P-570- 0261. BAR CODING IAW AIM BC1 IS REQUIRED. PART_NBR: 121079B-KEY SHACKLE-3CL ANDERSON FORGE AND MACHINE INC QUANTITY _800_ Unit of Issue: __EA__ UNIT PRICE: ____________ TOTAL:_____________ REQUIRED DELIVERY DATE ON OR BEFORE:___ 06/01/2016____ PROMISED DELIVERY DATE:______________________ ITEM 4: 5315 00-161-4607 KEY SPLIT 1 2 & 3 CL KEY, SPLIT,1,2,3, CLASS. TO BE MADE IAW LATEST REVISION OF P-570-0261 (HQ SPEC 417) AND DRAWING 121079. PACKAGING, PACKING AND MARKING TO BE IAW SECTION 5 OF P-570-0261. BAR CODING IAW AIM BC 1 IS REQUIRED. PART_NBR: 121079B-SPLIT KEY-1-3CL ANDERSON FORGE AND MACHINE INC QUANTITY _450_ Unit of Issue: __EA__ UNIT PRICE: ____________ TOTAL:_____________ REQUIRED DELIVERY DATE ON OR BEFORE:___ 06/01/2016____ PROMISED DELIVERY DATE:______________________ ITEM 5: 5315 00-161-4612 KEY SPLIT STNLS 4 CL KEY, SPLIT, STAINLESS STEEL, 4TH CLASS. TO BE MADE IAW LATEST REVISION OF P-570-0261 AND DRAWING 121079. PACKAGING, PACKING, AND MARKING TO BE IAW P- 570-0261. BAR CODING IAW AIM BC 1 IS REQUIRED. PART_NBR: 121079B-SPLIT KEY-4CL ANDERSON FORGE AND MACHINE INC QUANTITY _400_ Unit of Issue: __EA__ UNIT PRICE: ____________ TOTAL:_____________ REQUIRED DELIVERY DATE ON OR BEFORE:___ 06/01/2016____ PROMISED DELIVERY DATE:______________________ ITEM 6: 5315 00-300-0367 PIN SPLIT KEY 4 CLASS PIN, SPLIT KEY, 4TH CLASS, 1 INCH. TO BE MADE IAW LATEST REVISION OF P-570-0261 AND DRAWING 121079. PACKAGING, PACKING AND MARKING TO BE IAW P-570- 0261. BAR CODING IAW AIM BC 1 IS REQUIRED. PART_NBR: 121079B-SPLIT KEY PIN-4CL ANDERSON FORGE AND MACHINE INC QUANTITY _450_ Unit of Issue: __EA__ UNIT PRICE: ____________ TOTAL:_____________ REQUIRED DELIVERY DATE ON OR BEFORE:___ 06/01/2016____ PROMISED DELIVERY DATE:______________________ ITEM 7: 5315 00-300-0369 PIN SPLIT KEY 2 CLASS PIN, SPLIT KEY, 2ND CLASS, 1 3/4 INCHES. TO BE MADE IAW LATEST REVISOIN OF P-570-0261 AND DRAWING 121079. PACKAGING, PACKING AND MARKING TO BE IAW P-570- 0261. BAR CODING IAW AIM BC 1 IS REQUIRED PART_NBR: 121079B-SPLIT KEY PIN-2CL ANDERSON FORGE AND MACHINE INC QUANTITY _200_ Unit of Issue: __EA__ UNIT PRICE: ____________ TOTAL:_____________ REQUIRED DELIVERY DATE ON OR BEFORE:___ 06/01/2016____ PROMISED DELIVERY DATE:______________________ NOTE: All items are to be individually packed, and marked in accordance with below instructions. MARKINGS: EACH CONTAINER OR BOX SHALL BE MARKED WITH: ITEM NAME, STOCK NO., MFG PART NO. CAGE, CONTRACT NO. AND QUANTITY OF SAME LINE ITEMS PACKED IN THE SAME SHIPPING CONTAINER, AND DATE IN PRINTED BLACK BLOCK LETTERS MIN 1" HIGH. IMPORTANT! EACH ITEM MUST BE INDIVIDUALLY PACKAGED IN ACCORDANCE WITH THE COAST GUARD "UNIT OF ISSUE". ACCEPTABLE METHOD OF THE PACKAGE IS COMMERCIAL PACKAGING, DEFINED AS THE WAY ITEMS ARE PACKAGED, SOLD, AND SHIPPED TO THE PUBLIC OVER THE COUNTER PROVIDING IT IS PACKAGED IAW COAST GUARD "UNIT OF ISSUE". QUANTITIES OF SMALLER ITEMS (BOLTS/SCREWS) CAN BE MULTI-PACKED PROVIDING IT'S CORRECTLY MARKED. OR CONTAINER PROVIDING THE MARKING CLEARLY DISPLAYS THE TOTAL QUANTITY PER PACKAGE AND THE CG UNIT OF ISSUE. MARKING REQUIREMENTS: ALL PACKAGES, BOXES OR CONTAINERS SHALL BE CLEARLY MARKED / LABELED IN CLEAR LETTERING WITH THE FOLLOWING NOMENCLATURE: COAST GUARD 13 DIGIT STOCK NUMBER, MFG PART NO., CAGE CODE (IF KNOWN), PURCHASE ORDER / CONTRACT NUMBER, UNIT OF ISSUE, QUANTITY AND ANY ADDITIONAL MARKING AS DIRECTED BY PROCUREMENT AGENT. **FAILURE TO COMPLY WITH ALL PACKAGING AND MARKING REQUIREMENTS WILL RESULT IN MATERIAL BEING RETURNED, AT VENDORS EXPENSE, FOR CORRECTION.** QUESTIONS PERTAINING TO THIS RFQ SHOULD BE DIRECTED TO: LETROY BURGESS at LETROY.D.BURGESS@USCG.MIL (vi) PLACE OF DELIVERY: U.S. Coast Guard, Surface Forces Logistics Center, 2401 Hawkins Point Road, Bldg. 88 Receiving Rm., Baltimore, MD 21226. All deliveries are to be made Monday through Friday between the hours of 7:00 AM and 1:00 PM EST. PREPARATION FOR DELIVERY: All material shipped to the U.S. Coast Guard, Surface Forces Logistics Center, Bldg. 88, Receiving Room, 2401 Hawkins Point Road, Baltimore, MD. 21226, on this purchase order, must be accompanied by an itemized packing list securely attached to the outside of the package. All packing lists shall cite the Purchase Order Number with the package in such a manner as to provide identification. Material shall be packed for shipment in such manner as to afford adequate protection to the item against corrosion, deterioration, and physical damage during shipment to Surface Forces Logistics Center locations. Package shall all provide adequate protection for warehouse storage and multiple shipments. All packages shall have the Purchase Order Number, Stock number (if applicable) and Vendor name and Part Number clearly marked on the exterior of the package. All deliveries are to be made Monday through Friday between the hours of 7:00 A.M. and 1:00 P.M. *PLEASE NOTE - NEW RECEIVING HOURS* GOVERNMENT ACCEPTANCE: Acceptance will be made at destination by a Government representative. Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order. FAR 52.212-1 Instructions to Offerors-Commercial Items (OCT 2015). Parties responding to this solicitation may submit their offer in accordance with their standard commercial practices to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or email. As a minimum, offers must show: (1) The solicitation number (2) The time specified in the solicitation for receipt of offers; (3) The name, address, and telephone number of the offeror; (4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary; (5) Terms of any express warranty; (6) Price. Delivery information and any discount terms; (7) "Remit to" address, if different than mailing address; (8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically); (9) Acknowledgment of Solicitation Amendments; (10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and (11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. (12) Dun & Bradstreet number. (vii) FAR 52.212-2 Evaluation-Commercial Items (OCT 2014). - This is a commercial item acquisition. The evaluation and award procedures in FAR 13.106 apply. The following evaluation factors shall be considered: The Government will award a purchase order resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price, delivery date and other factors considered. The following factors shall be used to evaluate offers: The Government will evaluate offers based on delivery date and lowest technically acceptable price. (viii) FAR 52.212-3 Offeror Representations and Certifications-Commercial Items (MAR 2016) - An offeror shall complete only paragraphs (b) of this provision if the offeror has completed the annual representations and certificates electronically via http://www.acquisition.gov . If an offeror has not completed the annual representations and certifications electronically at the System for Award Management (SAM) website (www.sam.gov), the offeror shall complete only paragraphs (c) through (o) of this provision. (ix) FAR 52.212-4 Contract Terms and Conditions-Commercial Items (May 2015) applies to this acquisition. The following addendum applies: Address for submission of invoices is U.S. Coast Guard, P.O. Box 4122, Chesapeake, VA 23327-4122, Phone 757-523-6940 or Email address for submission of invoices is FIN-SMB-YARDTEAM@USCG.MIL . (x) 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders -Commercial Items (MAR 2016) (xi) FAR 52.213-4 Terms and Conditions - Simplified Acquisitions (Other Than Commercial Item). (xii) The Contractor shall comply with the FAR clauses which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) (2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553). (3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C. 3805 note)). (b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: [Contracting Officer check as appropriate.] ___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402). ___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509). ___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009). ___ (4) 52.204-10, Reporting Executive compensation and First-Tier Subcontract Awards (Oct 2015) (Pub. L. 109-282) (31 U.S.C. 6101 note). ___ (5) [Reserved] ___ (6) 52.204-14, Service Contract Reporting Requirements (Jan 2014) (Pub. L. 111-117, section 743 of Div. C). ___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014) (Pub. L. 111-117, section 743 of Div. C). ___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) (31 U.S.C. 6101 note). ___ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313). ___ (10) [Reserved] ___ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a). ___ (ii) Alternate I (Nov 2011) of 52.219-3. ___ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a). ___ (ii) Alternate I (Jan 2011) of 52.219-4. ___ (13) [Reserved] X__ (14) (i) 52.219-6, Notice of Total Small Business Aside (Nov 2011) (15 U.S.C. 644). ___ (ii) Alternate I (Nov 2011). ___ (iii) Alternate II (Nov 2011). ___ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644). ___ (ii) Alternate I (Oct 1995) of 52.219-7. ___ (iii) Alternate II (Mar 2004) of 52.219-7. ___ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)). ___ (17) (i) 52.219-9, Small Business Subcontracting Plan (Oct 2015) (15 U.S.C. 637 (d)(4)). ___ (ii) Alternate I (Oct 2001) of 52.219-9. ___ (iii) Alternate II (Oct 2001) of 52.219-9. ___ (iv) Alternate III (Oct 2015) of 52.219-9. X__ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)). ___ (19) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)). ___ (20) 52.219-16, Liquidated Damages-Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)). ___ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657f). X__ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C. 632(a)(2)). ___ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)). ___ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)). X__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755). X__ (26) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Feb 2016) (E.O. 13126). X__ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015). X__ (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246). ___ (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212). X__ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793). ___ (31) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212). ___ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). X__ (33) (i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627). ___ (ii) Alternate I (Mar 2015) of 52.222-50, (22 U.S.C. chapter 78 and E.O. 13627). ___ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.) ___ (35) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.) ___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.) ___ (36) (i) 52.223-13, Acquisition of EPEAT -Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514 ___ (ii) Alternate I (Oct 2015) of 52.223-13. ___ (37) (i) 52.223-14, Acquisition of EPEAT -Registered Television (Jun 2014) (E.O.s 13423 and 13514). ___ (ii) Alternate I (Jun 2014) of 52.223-14. ___ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b). ___ (39) (i) 52.223-16, Acquisition of EPEAT -Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514). ___ (ii) Alternate I (Jun 2014) of 52.223-16. X__ (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging while Driving (Aug 2011) (E.O. 13513). X__ (41) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83). ___ (42) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43). ___ (ii) Alternate I (May 2014) of 52.225-3. ___ (iii) Alternate II (May 2014) of 52.225-3. ___ (iv) Alternate III (May 2014) of 52.225-3. ___ (43) 52.225-5, Trade Agreements (Feb 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note). X__ (44) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury). ___ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note). ___ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150). ___ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150). ___ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505), 10 U.S.C. 2307(f)). ___ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)). X__ (50) 52.232-33, Payment by Electronic Funds Transfer- System for Award Management (Jul 2013) (31 U.S.C. 3332). ___ (51) 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management (Jul 2013) (31 U.S.C. 3332). ___ (52) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332). ___ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a). ___ (54) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). ___ (ii) Alternate I (Apr 2003) of 52.247-64. (c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items: X__52.246-2 -- Inspection of Supplies -- Fixed-Price. (Aug. 1996) (a) Definition. "Supplies," as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies. (b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract. (c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract. (d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor's or subcontractor's premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples. (e) (1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test. (2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary. (f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions. (g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken. (h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute. (i) (1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time -- (i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract; and (ii) When the supplies will be ready for Government inspection. (2) The Government's request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor's plant, nor more than 7 workdays in other instances. (j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies. (k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract. (l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor (1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor's plant at the Contracting Officer's election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor's plant and return to the original point when that point is not the Contractor's plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby. (End of Clause) Alternate I (Jul 1985). If a fixed-price incentive contract is contemplated, substitute paragraphs (g), (h), and (l) below for paragraphs (g), (h), and (l) of the basic clause. (g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and when required shall disclose the corrective action taken. Cost of removal, replacement, or correction shall be considered a cost incurred, or to be incurred, in the total final negotiated cost fixed under the incentive price revision clause. However, replacements or corrections by the Contractor after the establishment of the total final price shall be at no increase in the total final price. (h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and equitably reduce the target price or, if established, the total final price or (2) may terminate the contract for default. Unless the Contractor corrects or replaces the nonconforming supplies within the delivery schedule, the Contracting Officer may require their delivery and equitably reduce any target price or, if it is established, the total final contract price. Failure to agree upon an equitable price reduction shall be a dispute. * * * * * (l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor (1) at no increase in any target price or, if it is established, the total final price of this contract, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor's plant at the Contracting Officer's election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in any target price, or, if it is established, the total final price of this contract, if the Contractor fails to meet such delivery schedule; or (2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the total final price as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation costs from the original point of delivery to the Contractor's plant and return to the original point when that point is not the Contractor's plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and equitably reduce any target price or, if it is established, the total final price of this contract. Alternate II (Jul 1985). If a fixed-ceiling-price contract with retroactive price redetermination is contemplated, substitute paragraphs (g), (h), and (l) below for paragraphs (g), (h), and (l) of the basic clause: (g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and when required shall disclose the corrective action taken. Cost of removal, replacement, or correction shall be considered a cost incurred, or to be incurred, when redetermining the prices under the price redetermination clause. However, replacements or corrections by the Contractor after the establishment of the redetermined prices shall be at no increase in the redetermined price. (h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and equitably reduce the initial contract prices or, if established, the redetermined contract prices or (2) terminate the contract for default. Unless the Contractor corrects or replaces the nonconforming supplies within the delivery schedule, the Contracting Officer may require their delivery and equitably reduce the initial contract price or, if it is established, the redetermined contract prices. Failure to agree up...
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
2116406B830400005- Combined Synopsis
- Combined SynopsisCurrentMay 11, 2016
Shackle Assemby
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This is a combined synopsis/solicitation for commercial items, prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. The Request for Quote (RFQ) number 70ZU0227P40010B00 applies and is used as the solicitation number. This solicitation document and the incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01 and effective date 03/13/2026. It is anticipated that a competitive, firm-fixed-price purchase order will be awarded as a result of this synopsis/solicitation on a LPTA basis. All responsible sources may submit a quotation, which, if timely received, shall be considered by this agency. Vendors must have an active registration in SAM.gov prior to award. Payments will be made Net 30 in accordance with FAR 52.232-25, Prompt Payment. This is a Brand Name Only solicitation. No substitutions will be authorized. Interested vendors must be an authorized distributor for the requested material and are required to provide an authorized distributor letter from the Original Equipment Manufacturer (OEM) with their quotation. Quality Assurance: The vendor shall be capable of accommodating an on-site inspection by a Coast Guard Quality Assurance Representative (QAR) before shipment. During the scheduled QA inspection, each bearing sleeve shall be dimensionally verified in accordance with the current OEM drawing. The contractor shall make the latest revision of the OEM drawing available to the QAR at the time of inspection. The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items: NSN: 3120 21-912-7634 DESCRIPTION: BEARING, SLEEVE MFG NAME: THORDON BEARINGS INC. PART NBR: TBF778952119 QUANTITY: 3 EA PACKAGING AND MARKING REQUIREMENTS: INDIVIDUALLY PACKAGED IN ACCORDANCE WITH MILSTD-2073-1E METHOD 10, CUSHIONED IN A DOUBLE LAYER OF 3/4 IN BUBBLE WRAP AND PACKED IN AN APPROPRIATELY SIZED ASTM-D6251 TYPE III, CLASS 1 WOOD-CLEATED PANELBOARD SHIPPING BOX OR ASTM-D6880 CLASS 2 HEAVY DUTY SCREWED WOODEN BOX. MARK IN ACCORDANCE WITH MIL-STD-129R AND BAR CODE IAW ISO/IEC-16388-2007 CODE 39 SYMBOLOGY. PACKAGE LABEL: ITEM NAME: PART NUMBER: NSN: QNTY: (EXAMPLE 1 EA) COND-A CONTRACT NUMBER / ORDER NUMBER FOR TECHNICAL INQUIRIES: POC: BRADY MYERS EQUIPMENT SPECIALIST E-MAIL: BRADY.A.MYERS@USCG.MIL PH: 571-613-3388 Delivery Information REQUIRED DELIVERY DATE: 2/1/2027 ALTERNATE DELIVERY DATE: If you are unable to meet the required date, please provide your earliest date: _______ Total cost must include all delivery and freight charges. SHIPPING TERMS: FOB Destination is required. SHIP TO ADDRESS: UNITED STATES COAST GUARD (SFLC) RECEIVING ROOM - BLDG. 88 2401 HAWKINS POINT ROAD BALTIMORE, MD 21226 Preparation for Delivery & Invoicing Preparation for Delivery All material must be shipped to the address specified above and be accompanied by an itemized packing list securely attached to the outside of the shipment, citing the Purchase Order Number. Material shall be packed to afford adequate protection against corrosion, deterioration, and physical damage during shipment and for warehouse storage. Deliveries are accepted Monday through Friday between the hours of 8:00am to 3:00pm . Invoicing in Invoice Processing Platform (IPP) All invoices must be submitted for payment through the IPP at https://www.ipp.gov. Invoices must contain the contract number, invoice number, vendor UEI, TIN, CAGE code, line-item numbers, description of supplies, unit prices, and extended totals. For assistance with IPP, please contact IPP Customer Support at (866) 973-3131 or IPPCustomerSupport@fiscal.treasury.gov. | - | Solicitation | 11/17/2026 |
This is a combined synopsis/solicitation for commercial items, prepared in accordance with the format in subpart 12.6 of the FAR Part 12 - Acquisition of Commercial Products and Commercial Services | Acquisition.GOV and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. Request for Quote number in header applies and is used as the solicitation number. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01, effective, 13 March 2026. It is anticipated that a purchase order shall be awarded as a result of this synopsis/solicitation. All responsible sources may submit a quotation, (vendor must have an active registration in SAM.Gov prior to award) which if timely received, shall be considered by this agency. Payments are NET 30 and will be made in accordance with the FAR 52.232-25 Prompt payment clause 52.232-25 Prompt Payment. | Acquisition.GOV. The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items: Evaluation Criteria 1. Technical Acceptability The Government will evaluate each quote to determine whether the offered products meet all of the requirements specified in the solicitation, including: Compliance with all packaging, preservation, and marking requirements as specified. Quotes that do not state that the requirement can be met will not be considered. Ability to meet or exceed the required delivery schedule. 2. Price Quotes will be evaluated for fairness and reasonableness of price. The total evaluated price will be the sum of all line items, include shipping cost into item pricing. Quotes with a separate line for shipping will not be considered. 3. Past Performance The Government may consider the vendor’s past performance with the U.S. Coast Guard or other federal agencies, if available and relevant. The Government reserves the right to use information from sources other than those provided by the vendor. 4. Responsibility The vendor must have an active registration in SAM.gov prior to award. The vendor must not be debarred or suspended from doing business with the federal government. The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items: LINE ITEM 1: Item Name: REPAIR KIT, STOPPER NSN: 2040-01-483-3947 PN: MDL573009KIT Qty: 06 EA Kit Include: 2 EA SEALS(110X130X12) P/N: SKF43301 HMSA7 V 2 EA BEARINGS (SPH RLR) (110X180X69) P/N: SKF24122 CC/W33 WASHER (RLR CHK) P/N 573-009PC9 SEAL WIPER P/N 573-009PC13 LOCKPIN P/N 573-009PC25 PIN QUICK P/N 98404A496 2 EA GASKETS P/N 573-009PC71 Packaging requirements: INDIVIDUALLY PACKAGED IN ACCORDANCE WITH MIL-STD-2073-I E METHOD 10, USING WEATHERRESISTANT PAPERBOARD FOLDING WITH WATERPROOF BARRIER MATERIALS AND CUSHIONED, AS NEEDED IN BUBBLE-WRAP, BAGGED AND PACKED IN AN APPROPRIATELY SIZED ASTM-D5118 DOUBLE-WALL FIBERBOARD BOX. BAG CLOSURE SHALL BE EFFECTED BY HEAT-SEALING, ADHESIVES, OR TAPING. OTHER TYPE BAG CLOSURES SUCH AS PRESSURE-FIT, ZIPPER, AND OTHERS ARE ACCEPTABLE. MARKING IAW MIL-STD-129R & BAR CODING IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. PACKAGE LABEL: ITEM NAME: PART NUMBER: NSN: QNTY: (EXAMPLE 1 EA) COND-A CONTRACT NUMBER / ORDER NUMBER FOR TECHNICAL INQUIRIES: POC: EQUIPMENT SPECIALIST E-MAIL: KEVIN.L.RECKARD@USCG.MIL PH: 571-613-3388 ** SHIPPING: FOB DESTINATION REQUIRED. ** ITEM REQUIRED DELIVERY DATE: 12/18/26 If you are unable to meet the required delivery date, please indicate your earliest possible delivery date in your quotation. SHIP TO: USCG SURFACE FORCES LOGISTICS CENTER 2401 HAWKINS POINT ROAD RECEIVING ROOM- BUILDING 88 BALTIMORE, MD 21226 All Deliveries are to be made Monday through Friday between the hours of 8am to 3pm. Please make sure that any changes in Delivery Timeframes or tracking information get sent to Christopher.A.Huertas-Rolon@uscg.mil Invoicing In IPP It is now a requirement that all invoicing for Purchase Orders will now be entered and processed through https://www.ipp.gov. All invoices must contain the following information: CG contract number, vendor’s invoice number, vendor’s UEI, TIN number, cage number, PO item number, description of supplies or services, unit prices and extended totals (INVOICES FOR PURCHASE ORDERS AWARDED BY SURFACE FORCE LOGISTICS CENTER, BALTIMORE ARE TO BE SUMITTED AS NON PO IN IPP). Shipping costs will be included in line-item price. To submit an invoice, vendor must have access to www.ipp.gov. Additionally, a copy of the invoice must also be sent to the PO Issuing Office at: Christopher.A.Huertas-Rolon@uscg.mil | - | Solicitation | 11/18/2026 |
Combined Synopsis/Solicitation for Commercial Items This is a combined synopsis/solicitation for commercial items, prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. This solicitation document and the incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01, effective date 03/13/2026. It is anticipated that a competitive, firm-fixed-price purchase order will be awarded as a result of this synopsis/solicitation. All responsible sources may submit a quotation, which, if timely received, shall be considered by this agency. Vendors must have an active registration in SAM.gov prior to award. Payments will be made Net 30 in accordance with FAR 52.232-25, Prompt Payment. This is a Brand Name Only solicitation. No substitutions will be authorized. Interested vendors must be an authorized distributor/reseller for the requested material and are required to provide an authorized distributor/reseller letter from the Original Equipment Manufacturer (OEM) with their quotation. The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items: Line Item Details LINE ITEM 1 NSN: 4420-01-F09-1477 DESCRIPTION: HEAT EXCHANGER MFG NAME: STANDARD XCHANGE PART NBR: 5-492-23-008-001 QUANTITY: 10 EA UNIT PRICE: $____________________ TOTAL PRICE (Shipping Included): $____________________ PACKAGING AND MARKING REQUIREMENTS: INDIVIDUALLY PACKAGED IN ACCORDANCE WITH MIL-STD-2073-1E METHOD 10, CUSHIONED IN A DOUBLE LAYER OF 3/4 IN BUBBLE WRAP AND PACKED IN AN APPROPRIATELY SIZED ASTM-D6251 TYPE III, CLASS 1 WOOD-CLEATED PANELBOARD SHIPPING BOX OR ASTM-D6880 CLASS 2 HEAVY DUTY SCREWED WOODEN BOX. PACKAGE LABEL: ITEM NAME: PART NUMBER: NSN: QNTY: (EXAMPLE 1 EA) COND-A CONTRACT NUMBER / ORDER NUMBER MARK IAW MIL-STD-129P, BAR CODE IAW ISO/IEC-16388-2007, CODE 39 SYMBOLOGY. POC: KEVIN RECKARD E-MAIL: KEVIN.L.RECKARD@USCG.MIL PH: 571-607-6027 Delivery Information REQUIRED DELIVERY DATE: 12/14/2026 ALTERNATE DELIVERY DATE: If you are unable to meet the required date, please provide your earliest date: _______ Total cost must include all delivery and freight charges. SHIPPING TERMS: FOB Destination is required. SHIP TO ADDRESS: [Insert Full Ship-To Address, including building, receiving room, city, state, and zip code] Preparation for Delivery & Invoicing Preparation for Delivery All material must be shipped to the address specified above and be accompanied by an itemized packing list securely attached to the outside of the shipment, citing the Purchase Order Number. Material shall be packed to afford adequate protection against corrosion, deterioration, and physical damage during shipment and for warehouse storage. Deliveries are accepted [Insert Delivery Days, e.g., Monday through Friday] between the hours of [Insert Delivery Hours, e.g., 0800 to 1500]. U.S. Government Approved Label Requirements: National Stock Number (NSN) Item Name Part Number Purchase Order Number Condition Code (e.g., Condition A) Quantity and Unit of Issue Invoicing in Invoice Processing Platform (IPP) All invoices must be submitted for payment through the IPP at https://www.ipp.gov. Invoices must contain the contract number, invoice number, vendor UEI, TIN, CAGE code, line item numbers, description of supplies, unit prices, and extended totals. For assistance with IPP, please contact IPP Customer Support at (866) 973-3131 or IPPCustomerSupport@fiscal.treasury.gov. | - | Solicitation | 11/12/2026 |
Proposed procurement for NSN 5340015404920 GUIDE,CAM FOLLOWER, FO: Line 0001 Qty 149 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0116 DAYS ADO The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | - | Combined Synopsis | 10/26/2026 |
Proposed procurement for NSN 5306014936725 BOLT,SHOULDER: Line 0001 Qty 7 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0167 DAYS ADO The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | - | Combined Synopsis | 10/20/2026 |
Additional Details
Solicitation Number
2116406B830400005
Archive Date
Jun 3, 2019