Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM MST
- Posted
- October 22, 2026
- Notice type
- Solicitation
- Set-aside
- 8(a) Set-Aside (FAR 19.8)
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.418TH CSB.W6QM MICC-DUGWAY PROV GRD
- Place of performance
- Dugway, Utah, 84022
- PSC
- Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W911S6-27-B-A001
- Notice ID
- 2b9eed28c47e4643903ddd688195ede1
Description
Amendment 0001 Q&A has been added
PROJECT TITLE: MISCELLANEOUS PAVING REQUIREMENTS
PROJECT LOCATION: U.S. ARMY DUGWAY PROVING GROUND, UTAH
DESCRIPTION: THIS IS AN INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ), FIRM-FIXED PRICE REQUIREMENT FOR MISCELLANEOUS PAVING CONSTRUCTION SERVICES. ANY WORK REQUIRED BY THE GOVERNMENT SHALL BE ACCOMPLISHED BY THE ISSUANCE OF TASK ORDERS BY THE CONTRACTING OFFICER AGAINST THE PROPOSED CONTRACT. THE PERIOD OF PERFORMANCE (POP) FOR THIS REQUIREMENT IS A TWELVE (12) MONTH BASE PERIOD AND FOUR (4) ONE (1) YEAR OPTION PERIODS OF ONE YEAR EACH. THE ESTIMATED MAGNITUDE IS UP TO $5,000,000.00 ANNUALLY.
THE NAICS FOR THIS ACQUISITION IS 237310, HIGHWAY, STREET, AND BRIDGE CONSTRUCTION (SMALL BUSINESS SIZE STANDARD $45 MILLION).
PER FEDERAL ACQUISITION REGULATION (FAR) 19.108, THIS REQUIREMENT IS RESTRICTED TO 8(A) FIRMS AUTHORIZED BY THE SMALL BUSINESS ADMINISTRATION'S UTAH DISTRICT OFFICE TO PERFORM WITHIN THE DISTRICT'S GEOGRAPHICAL REGION.
Offers shall be received prior to the closing date and time identified on SF 1442 (18 November 2026 by 1300 MDT) to the following address:
Contract Specialist: Nicholas J. Rowton; Email Address: nicholas.j.rowton.civ@army.mil
Contracting Officer: Jim Keetch; Email Address: Alfred.j.keetch.civ@army.mil
Note: Please include Bid Submission and solicitation number W911S6-27-B-A001 in the subject line of the email. Example Subject Reference: Bid Submission W911S6-27-B-A001 DPG Horizontal Construction Paving
Bid Opening will be Wednesday 18 November 2026 promptly at 1300 MDT at Dugway Proving Ground Building 5330 Valdez Circle conference room 1201, no bids will be accepted or considered after that time.
Site Visit: The Government will hold a virtual site visit only.
Bidders are required to submit a completed SF 1442, including the acknowledgement of all amendments in Block 19.
SF 1442 cannot be accepted without being signed. The SF 1442 must be completed in full by the bidder, to include the Name and Title of the Person Authorized to sign in Block 20a, an original signature in Block 20b, and the Bid Date in Block 20c. Bids cannot be accepted and will be declared non-responsive without a valid signature in Block 20b.
The final total bid price(s) from Technical Exhibit 01 must be annotated on the appropriate CLINs of Section B of the solicitation.
Refer to Section L for additional details
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (34)
- Download
Question and Answers IFB W911S6-27-B-A001-102226.pdf
44 KBAdded in Solicitation version 2Posted - Download
Solicitation Amendment W911S627BA0010001 SF 30.pdf
3.8 MBAdded in Solicitation version 2Posted - Download
1442-Solicitation W911S627BA001 DPG Horizontal Construction 101426.pdf
6.4 MBAdded in Solicitation version 1Posted - Download
Attachment 1 Scope of Work W911S6 Construction Horizontal FY27 - FY 31.pdf
442 KBAdded in Solicitation version 1Posted - Download
Attachment 2 Dugway Proving Ground Paving IDIQ Virtual Site Visit.pptx
13 MBAdded in Solicitation version 1Posted - Download
DPG_Paved_Roads_2026.pdf
682 KBAdded in Solicitation version 1Posted - Download
TE-01 Contract Line Items Proposal Template Base plus 4 Year.xlsx
206 KBAdded in Solicitation version 1Posted - Download
TE-02 Standard Specification Book Rev 9 June 2025.pdf
1.8 MBAdded in Solicitation version 1Posted - Download
TE-03 Paving IDIQ Airfield Specifications.pdf
2.2 MBAdded in Solicitation version 1Posted - Download
TE-04 Standard Drawings.pdf
102 MBAdded in Solicitation version 1Posted - Download
TE-05 Materials Manual of Instruction.pdf
4.5 MBAdded in Solicitation version 1Posted - Download
TE-06 Min Sampling an Testing.pdf
842 KBAdded in Solicitation version 1Posted - Download
TE-07 Quality Management Plans 5 June 2025.pdf
1.9 MBAdded in Solicitation version 1Posted - Download
TE-08 Work Zones.pdf
411 KBAdded in Solicitation version 1Posted - Download
TE-09 Dust Control Forms 5 June 2025.pdf
623 KBAdded in Solicitation version 1Posted - Download
TE-09a Fugitive Dust Control Form 01-Crushing.pdf
741 KBAdded in Solicitation version 1Posted - Download
TE-09b Fugitive Dust Control Form 02-Screening.pdf
732 KBAdded in Solicitation version 1Posted - Download
TE-09c Fugitive Dust Control Form 03-Stockpiles.pdf
763 KBAdded in Solicitation version 1Posted - Download
TE-09d Fugitive Dust Control Form 04-Hauling.pdf
764 KBAdded in Solicitation version 1Posted - Download
TE-09e Fugitive Dust Control Form 05-Staging Areas.pdf
771 KBAdded in Solicitation version 1Posted - Download
TE-09f Fugitive Dust Control Form 06-Backfilling.pdf
777 KBAdded in Solicitation version 1Posted - Download
TE-09g Fugitive Dust Control Form 07-Site Preparation.pdf
765 KBAdded in Solicitation version 1Posted - Download
TE-09i Fugitive Dust Control Form 09-Site Grading.pdf
766 KBAdded in Solicitation version 1Posted - Download
TE-09j Fugitive Dust Control Form 10-Demolition.pdf
767 KBAdded in Solicitation version 1Posted - Download
TE-09k Fugitive Dust Control Form 11-Disturbed Soil.pdf
749 KBAdded in Solicitation version 1Posted - Download
TE-09l Fugitive Dust Control Form 12-Disturbed Land.pdf
748 KBAdded in Solicitation version 1Posted - Download
TE-09m Fugitive Dust Control Form 13-Sawing-Cutting.pdf
743 KBAdded in Solicitation version 1Posted - Download
TE-09n Fugitive Dust Control Form 14-Trenching.pdf
763 KBAdded in Solicitation version 1Posted - Download
TE-09o Fugitive Dust Control Form 15-Loading.pdf
758 KBAdded in Solicitation version 1Posted - Download
TE-09p Fugitive Dust Control Form 16-Paving.pdf
761 KBAdded in Solicitation version 1Posted - Download
TE-09q Fugitive Dust Control Form 17-Trackout.pdf
748 KBAdded in Solicitation version 1Posted - Download
TE-09r Fugitive Dust Control Form 18-Traffic.pdf
763 KBAdded in Solicitation version 1Posted - Download
TE-10 Asphalt Slurry Seal.pdf
2.0 MBAdded in Solicitation version 1Posted - Download
TE-11 Existing Asphalt Core Sampling FY27 -FY31 Paving 12 March 2026.pdf
250 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1Solicitation
Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance
- 2Version 2SolicitationCurrent
Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance
Similar Opportunities
Additional Details
Solicitation Number
W911S6-27-B-A001
Archive Date
Dec 3, 2026
Office Address
DUGWAY, UT, 84022-5000