GovChime
Notice ID: 2d952c0389e941a1837bedeb583ba65cAward NoticeAwarded

Z--Photovoltaic System at SEKI

Awarded on September 22, 2021. Full description on SAM.gov.

Awarded tounder 140P8621C0016 (source: SAM.gov award notice)• $84.5K

Overview

Posted
October 5, 2021
Notice type
Award Notice
NAICS
221114: Solar Electric Power Generation
Agency
Department of the Interior

Notice details

Place of performance
CA, 93633
Last updated
Sep 9, 2025
Award date
Sep 22, 2021
Award amount (SAM.gov award notice)
$84.5K

Identifiers

Solicitation number
140P8621R0021
Notice ID
2d952c0389e941a1837bedeb583ba65c
Award number (PIID)
140P8621C0016

Description

REPLACE PHOTOVOLTAIC SYSTEM at SEQUOIA & KINGS CANYON NATIONAL PARKS (SEKI)

Full description on SAM.gov

Award Overview

Award Number

140P8621C0016

Award Amount (SAM.gov award notice)

$84.5K

Award Date

Sep 22, 2021

Awardee

Awardee UEI

R6L7Z7RKR9Z3

Original Solicitation

Notice ID: 2d952c0389e941a1837bedeb583ba65c

Posted Date: Oct 5, 2021

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:140P8621R0021
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationJul 2, 2021

    61--Photovoltaic System at SEKI

    Notice e5af364c41124414bbcdac9f1b13f5d9 on SAM.gov

  2. 2×
    SolicitationJul 27, 2021

    Z--Photovoltaic System at SEKI

    Notice fdff608fcf3e4b23ac9c7833797e45aa on SAM.gov

  3. AwardedCurrentOct 5, 2021

    Z--Photovoltaic System at SEKI

    Notice 2d952c0389e941a1837bedeb583ba65c on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
38%
AwardedOpen
Login at https://piee.eb.mil and search for 'W90VN826RA025' to obtain more details.*
38%
Combined Synopsis06/04/2026
This is a Request for Proposal (RFP) for a MATOC Work Plan. The offeror is strictly limited to the following eligible contractors under MATOC numbers: W91QVN-24-D-0023, -0024, -0025, -0026, -0028, -0030, -0031, -0033, -0035, -0036, -0038, -0080, -0083, and -0109. Project Requirement: MATOC Work Plan - REPLACE AHU SYSTEM FOR BASE GYM, B1423 at Osan Air Base (PROJECT NO. SMYU 26-1042). Submission and Evaluation Strategy Fair Opportunity: This requirement is issued pursuant to FAR Subpart 16.505. Please refer to the attachments: 1. Fair Opportunity Proposal Request (FOPR) 2. Statement of Work (SOW) 3. Drawings 4. Submittal Register 5. Contractor Tax Exemption Declaration ** Site Visit: The offeror is strongly encouraged. Per FAR 52.236-2 (Differing Site Conditions) and 52.236-3 (Site Investigations and Conditions Affecting the Work), offerors are urged to inspect the sites where work will be performed. Date and Time: Thursday, 7 April 2026, at 0930 Hrs. Meeting Location: In front of Bldg. #600, Osan Air Base.**
38%
Solicitation05/06/2026
The purpose of Amendment P0002 is to extend Quote due date to December 2, 2026 at 3:00PM(PT). All other terms and conditions remain unchanged and in full force and effect. The Purpose of Amendment P0001 is to post the Site Visit Sign-in roster list of vendors that attended the site visit that took place at 10AM (PT) October 23, 2026. All other terms and conditions remain unchanged and in full force and effect. Main Description and Details: This is a combined synopsis/solicitation for commercial construction prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation No. 36C26127Q0047, Project No. 612A4-27-020, Replace Flooring at VA McClellan This is a firm-fixed-price construction requirement. The period of performance is: 160 calendar days after NTP. The place (s) of performance are Three (3) Total: (1) McClellan VA Clinic, Building 98, 5342 Dudley Blvd, McClellan Park, 95652,(2) McClellan VA, Administrative Building 209, 3230 Peacekeeper Way, McClellan Park, CA 95652, and (3) McClellan VA, Administrative Building 949, 3401 Beech St. McClellan Park, CA 95652 All requests for information (RFI) regarding this RFQ must be submitted in writing and receive no later than November 3, at 12:00 PM PT. All RFIs must be submitted via email to Mr. Rosario Chaidez at e-mail: Rosario.chaidez1@va.gov. This procurement is a total service-disabled veteran-owned small business (SDVOSB) set-aside. NAICS Code is 236220 – Commercial and Institutional Building Construction; Small Business Size Standard: $45.0M. Bid bonds, payment and performance bonds are required under this solicitation and resultant contract. A bid guarantee in the form of a bid bond must be submitted with your Quote before the deadline. A team of Government Technical personnel in accordance with Revolutionary FAR Overhaul (RFO) 12. 203 will evaluate the quotes received. Basis of Award will be price only. The Government intends to award one (1) contract as a result of this solicitation. The Government seeks to award that responsible Vendor whose quote, conforming to the solicitation, is determined to be the most advantageous to the Government considering Price only. Davis-Bacon Act Wage Determination Decision No. CA20260007 dated 9/3/2026 is attached and applies to this requirement.
38%
Solicitation12/02/2026
The Federal Bureau of Prisons (FBOP) and the Federal Correctional Institution Oxford located at 350 Elk Avenue, Oxford, Wisconsin, intend to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to remove existing water softeners and install a new centralized water softener for the entire Institution. Awarded Contractor shall provide materials, labor, and equipment to remove existing water softeners, pipe through and install a new centralized water softener and all associated components. FCI Oxford currently has several commercial-grade water softeners which are failing to efficiently reduce water hardness and protect water systems, as well as connected equipment. The new centralized system should improve water quality, minimize calcium buildup, and extend the service life of plumbing infrastructure and appliances. The contractor would place a brine tank and softener to be installed at the water tower. Water would be treated right off the water main, therefore there would be no need for bagged salt to be brought in weekly.
35%
Combined Synopsis12/04/2026

Additional Details

Solicitation Number

140P8621R0021

Archive Date

Oct 7, 2021

Office Address

SAN FRANCISCO, CA, 94123